SAP ABAP Table MDPERF (CPU times for the planning run for material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Table Category | INTTAB | Structure |
Structure | MDPERF | Table Relationship Diagram |
Short Description | CPU times for the planning run for material |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | .INCLUDE | 0 | 0 | CPU time for the planning run for a material | |||||
2 | RTIME | MDRTIME | INT4 | INT4 | 10 | 0 | MRP run: Total duration for each material | ||
3 | READT | READT | INT4 | INT4 | 10 | 0 | MRP run: Time required for reading the initial situation | ||
4 | LOTST | LOTST | INT4 | INT4 | 10 | 0 | MRP run: Time for calculating net requirements and lot-size | ||
5 | EXPLT | EXPLT | INT4 | INT4 | 10 | 0 | MRP run: Time for BOM explosion | ||
6 | SCHET | SCHET | INT4 | INT4 | 10 | 0 | MRP run: Time required for lead time scheduling | ||
7 | POSTT | POSTT | INT4 | INT4 | 10 | 0 | MRP run: Time for posting | ||
8 | MDTBT | MDTBT | INT4 | INT4 | 10 | 0 | MRP run: Time for deleting/saving MRP list | ||
9 | RESBT | RESBT | INT4 | INT4 | 10 | 0 | MRP run: Time required for saving dependent requirements | ||
10 | ARBPT | ARBPT | INT4 | INT4 | 10 | 0 | MRP run: Time to read routing | ||
11 | EINZT | EINZT | INT4 | INT4 | 10 | 0 | MRP run: Time for evaluating the operating time | ||
12 | RQITT | RQITT | INT4 | INT4 | 10 | 0 | MRP run: Time required for saving total requirements | ||
13 | MATNR | MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
14 | WERKS | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
15 | BERID | BERID | BERID | CHAR | 10 | 0 | MRP Area | * |
History
Last changed by/on | SAP | 20050411 |
SAP Release Created in |