SAP ABAP Data Element RQITT (MRP run: Time required for saving total requirements)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | RQITT |
Short Description | MRP run: Time required for saving total requirements |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | RTIME_RQIT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TotalRqmts |
Medium | 15 | Total reqmts |
Long | 20 | Save total reqmts |
Heading | 12 | Total reqmts |
Documentation
Definition
CPU time (in ms), which was needed to generate and save total requirements (which are daily totals of the dependent requirements for each component) in the planning run. This time is included in the time for the update.
If you have bottlenecks in system performance, the entry of CPU times helps identify which operations or which materials use the most computing time.
History
Last changed by/on | SAP | 20040210 |
SAP Release Created in |