SAP ABAP Table KBEZI (Include structure KBEZ (additional data for KBED))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CX (Package) R/3 Application development: R/3 Scheduling
Basic Data
Table Category INTTAB    Structure 
Structure KBEZI   Table Relationship Diagram
Short Description Include structure KBEZ (additional data for KBED)    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 VGW01 VGWRT VGWRT QUAN 9   3   Standard Value  
2 VGE01 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
3 VGW02 VGWRT VGWRT QUAN 9   3   Standard Value  
4 VGE02 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
5 VGW03 VGWRT VGWRT QUAN 9   3   Standard Value  
6 VGE03 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
7 VGW04 VGWRT VGWRT QUAN 9   3   Standard Value  
8 VGE04 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
9 VGW05 VGWRT VGWRT QUAN 9   3   Standard Value  
10 VGE05 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
11 VGW06 VGWRT VGWRT QUAN 9   3   Standard Value  
12 VGE06 VGWRTEH MEINS UNIT 3   0   Unit of measure for the standard value T006
13 USR04 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
14 USE04 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields T006
15 USR05 USRQUAN13 USRQUAN13 QUAN 13   3   User field for quantity (length 10.3)  
16 USE05 USRUNIT MEINS UNIT 3   0   User field: Unit for quantity fields T006
17 LEK01 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
18 LEK02 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
19 LEK03 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
20 LEK04 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
21 LEK05 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
22 LEK06 CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
23 RSTZE RSTZE EINHEIT UNIT 3   0   Unit of measure for setup time  
24 BEAZE BEAZE EINHEIT UNIT 3   0   Unit of measure for processing time  
25 ARUZE ARUZE EINHEIT UNIT 3   0   Unit of measure for teardown  
26 ARBEI ARBEIT ARBEIT QUAN 7   1   Work involved in the activity  
27 ARBEH ARBEITE MEINS UNIT 3   0   Unit for work T006
28 LEKNW CO_LEIKZ XFELD CHAR 1   0   Indicator: No remaining activity expected  
29 ASVRG ASVRG MENG13 QUAN 13   3   Operation scrap  
30 UMREN CP_UMREN UMBSN DEC 5   0   Denominator for converting rtg and op units of measure  
31 UMREZ CP_UMREZ UMBSZ DEC 5   0   Numerator for converting task list and oper. un. of measure  
32 BMSCH BMSCH BMSCH QUAN 13   3   Base Quantity  
33 LMNGA LMNGA MENG13 QUAN 13   3   Total Yield Confirmed  
34 XMNGA XMNGA MENG13 QUAN 13   3   Total scrap quantity confirmed  
35 ISMNW CO_ISMNW MENG13 QUAN 13   3   Actual work  
36 ISM01 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
37 ISM02 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
38 ISM03 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
39 ISM04 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
40 ISM05 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
41 ISM06 CO_RUMNG MENGV13 QUAN 13   3   Previously confirmed activity  
42 ISERH ISERH VGWRT QUAN 9   3   Confirmed break time  
43 ZEIER DZEIER MEINS UNIT 3   0   Unit for the break time T006
44 ISDD ISDD DATUM DATS 8   0   Actual start: Execution (date)  
45 ISDZ ISDZ ATIME TIMS 6   0   Actual start: Execution/setup (time)  
46 IERD IERD DATUM DATS 8   0   Actual finish: Setup (date)  
47 IERZ IERZ ATIME TIMS 6   0   Actual finish: Setup (time)  
48 ISBD ISBD DATUM DATS 8   0   Actual start: Processing (date)  
49 ISBZ ISBZ ATIME TIMS 6   0   Actual start: Processing (time)  
50 IEBD IEBD DATUM DATS 8   0   Actual finish: Processing (date)  
51 IEBZ IEBZ ATIME TIMS 6   0   Actual processing finish (time)  
52 ISAD ISAD DATUM DATS 8   0   Actual start: Teardown (date)  
53 ISAZ ISAZ ATIME TIMS 6   0   Actual start: Teardown (time)  
54 IEDD IEDD DATUM DATS 8   0   Actual finish: Execution (date)  
55 IEDZ IEDZ ATIME TIMS 6   0   Actual finish: Execution (time)  
56 PEDD CO_PEDD DATUM DATS 8   0   Forecast finish date of operation from confirmation  
57 PEDZ CO_PEDZ ATIME TIMS 6   0   Forecast finish time of operation from confirmation  
58 OFM01 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
59 OFM02 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
60 OFM03 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
61 OFM04 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
62 OFM05 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
63 OFM06 CO_SCHAETZ VGWRT QUAN 9   3   Forecast value used to update the standard value  
64 OFMNW OFMNW ARBEIT QUAN 7   1   Forecasted work (actual + remaining)  
65 PDAU PDAU DAUER_4_1 QUAN 5   1   Forecasted duration of activity from confirmation  
66 PDAE PDAE MEINS UNIT 3   0   Unit of the forecasted duration from the confirmation T006
67 DAUNO DAUNOR DAUER_4_1 QUAN 5   1   Normal duration of the activity  
68 DAUNE DAUNORE MEINS UNIT 3   0   Normal duration/unit T006
69 RMNGA RMNGA MENGV13 QUAN 13   3   Total confirmed rework quantity  
70 ILE01 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
71 ILE02 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
72 ILE03 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
73 ILE04 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
74 ILE05 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
75 ILE06 CO_ISMNGEH MEINS UNIT 3   0   Unit of measure for the activity to be confirmed T006
76 PER_EX CY_PEREX KREUZ CHAR 1   0   Entry in KPER exists for this split  
77 DELTA_ST CY_DELTAST MENGV13 QUAN 13   3   Time Difference Between Start Capacity and Individ. Capacity  
78 DELTA_EN CY_DELTAEN MENGV13 QUAN 13   3   Time Difference Between Fin. Capacity and Individ. Capacity  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 KBEZI ARBEH T006 MSEHI KEY 1 CN
2 KBEZI DAUNE T006 MSEHI KEY 1 CN
3 KBEZI ILE01 T006 MSEHI KEY 1 CN
4 KBEZI ILE02 T006 MSEHI KEY 1 CN
5 KBEZI ILE03 T006 MSEHI KEY 1 CN
6 KBEZI ILE04 T006 MSEHI KEY 1 CN
7 KBEZI ILE05 T006 MSEHI KEY 1 CN
8 KBEZI ILE06 T006 MSEHI KEY 1 CN
9 KBEZI PDAE T006 MSEHI KEY 1 CN
10 KBEZI USE04 T006 MSEHI KEY 1 CN
11 KBEZI USE05 T006 MSEHI KEY 1 CN
12 KBEZI VGE01 T006 MSEHI KEY 1 CN
13 KBEZI VGE02 T006 MSEHI KEY 1 CN
14 KBEZI VGE03 T006 MSEHI KEY 1 CN
15 KBEZI VGE04 T006 MSEHI KEY 1 CN
16 KBEZI VGE05 T006 MSEHI KEY 1 CN
17 KBEZI VGE06 T006 MSEHI KEY 1 CN
18 KBEZI ZEIER T006 MSEHI KEY 1 CN
History
Last changed by/on SAP  20050411 
SAP Release Created in