SAP ABAP Message Class MILL_PC (Mill: Message Pool for Confirmations)
Basic Data
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-MP-PP (Application Component) Production Planning and Control (PP) enhancements
⤷
MILL_PP (Package) IS: Mill Products - Production Planning and Control

⤷

⤷

Attributes
Message class | ![]() |
MILL_PC |
Short Description | ![]() |
Mill: Message Pool for Confirmations |
Changed On | ![]() |
20050301 |
Last Changed At | ![]() |
120817 |
Messages
# | Message | Message Short Text | Documentation status | Authorization check |
---|---|---|---|---|
1 | ![]() |
Batch determination not carried out. Assigned GR row not found | The short text describes the object sufficiently | |
2 | ![]() |
Selection incorrect for selected function | Space: object requires documentation | |
3 | ![]() |
Selection (combination) is not complete for the function | ||
4 | ![]() |
Select at least 2 process batches | Space: object requires documentation | |
5 | ![]() |
You must make only one selection in the GR in this function | ||
6 | ![]() |
No classification found for the object (plant/material/batch) &1 | Space: object requires documentation | |
7 | ![]() |
Batch &1 &2 already exists for this order | Space: object requires documentation | |
8 | ![]() |
Message sent | Space: object requires documentation | |
9 | ![]() |
Invalid function call | Space: object requires documentation | |
10 | ![]() |
Message could not be sent | Space: object requires documentation | |
11 | ![]() |
Process batch reference invalid (material &1 batch &2) | Space: object requires documentation | |
12 | ![]() |
Function cancelled | Space: object requires documentation | |
13 | ![]() |
Selected batch is not assigned to an order item | Space: object requires documentation | |
14 | ![]() |
Function was terminated by the user | Space: object requires documentation | |
15 | ![]() |
Batch does not exist in selected row | Space: object requires documentation | |
16 | ![]() |
Cannot be deleted because of assignment to segmentation order &1 &2 &3 | Space: object requires documentation | |
17 | ![]() |
The chosen process batch cannot be assigned | ||
18 | ![]() |
Select one PB or GR row and an item of the segment. order | Space: object requires documentation | |
19 | ![]() |
Input batch cannot be assigned to process batch | Space: object requires documentation | |
20 | ![]() |
Enter a batch | Space: object requires documentation | |
21 | ![]() |
Input error for batch to be created | ||
22 | ![]() |
No configuration data exists (order item &1) | Space: object requires documentation | |
23 | ![]() |
No configuration data exists | Space: object requires documentation | |
24 | ![]() |
Batch is not the highest level (item.no/plant/mat./batch: &1 &2 &3 &4) | Space: object requires documentation | |
25 | ![]() |
Preceding batch missing; assign an input batch | Space: object requires documentation | |
26 | ![]() |
Batch contains assignments to partitioning orders | Space: object requires documentation | |
27 | ![]() |
Some partitioning orders have not yet been assigned - please assign them | Space: object requires documentation | |
28 | ![]() |
Not all process batches have been assigned to order items | Space: object requires documentation | |
29 | ![]() |
Not all operations requiring confirmation have been confirmed | Space: object requires documentation | |
30 | ![]() |
Process batch is already assigned to another order item | Space: object requires documentation | |
31 | ![]() |
Process batch is already being used as an original batch | Space: object requires documentation | |
32 | ![]() |
PB assignment as PPB only allowed for an order item with OB assignment | ||
33 | ![]() |
The original batch on the order item must have more than one assignment | ||
34 | ![]() |
A segmentation order assignment exists for the proc. batch or order item | Space: object requires documentation | |
35 | ![]() |
Order item is already assigned to another process batch (PPB/OB) | ||
36 | ![]() |
"Split" function not allowed for a PB with an order item | ||
37 | ![]() |
Fields of table parameter IT-REF have not been filled correctly | Space: object requires documentation | |
38 | ![]() |
Partitioning order has to be transferred manually to order item | Space: object requires documentation | |
39 | ![]() |
Merge function not permitted for a process batch containing an order item | ||
40 | ![]() |
Enter a batch | Space: object requires documentation | |
41 | ![]() |
Enter a storage location | Space: object requires documentation | |
42 | ![]() |
No process batch is assigned to the order item | Space: object requires documentation | |
43 | ![]() |
No process batches exist for the order | Space: object requires documentation | |
44 | ![]() |
PPB/OB not at highest level | Space: object requires documentation | |
45 | ![]() |
Process batch is already assigned; copying not possible | Space: object requires documentation | |
46 | ![]() |
Process batch is not at the top level; is not deleted | Space: object requires documentation | |
47 | ![]() |
Process batch already assigned and cannot be deleted | Space: object requires documentation | |
48 | ![]() |
GR item &1 is already assigned and cannot be deleted | Space: object requires documentation | |
49 | ![]() |
Unable to set deletion flag for the process batch &1 order &2 | Space: object requires documentation | |
50 | ![]() |
Class not found; batch cannot be created | Space: object requires documentation | |
51 | ![]() |
Material cannot be configured; check material master | Space: object requires documentation | |
52 | ![]() |
No strategy exists for mixing characteristics | Space: object requires documentation | |
53 | ![]() |
Input parameters incomplete | Space: object requires documentation | |
54 | ![]() |
PB &1 cannot be deleted as a GR already exists for it | Space: object requires documentation | |
55 | ![]() |
Batch &1 is not a process batch for the order | Space: object requires documentation | |
56 | ![]() |
This GR batch has already been assigned to process batch &1 | Space: object requires documentation | |
57 | ![]() |
Internal data tables inconsistent; cancel confirmation | Space: object requires documentation | |
58 | ![]() |
Assign all process batches to an item | Space: object requires documentation | |
59 | ![]() |
Process batch assignment cannot be removed | Space: object requires documentation | |
60 | ![]() |
Process batch has successor; deletion not possible | Space: object requires documentation | |
61 | ![]() |
Delete process batch &1 across the combined order | Space: object requires documentation | |
62 | ![]() |
Delete process batch &1 across the original order | Space: object requires documentation | |
63 | ![]() |
Batch characteristics cannot be changed as GR already carried out here | Space: object requires documentation | |
64 | ![]() |
Batch characteristics cannot be changed as GR batch does not exist yet | Space: object requires documentation | |
65 | ![]() |
Process batch &1 is already assigned; split not possible | Space: object requires documentation | |
66 | ![]() |
Process batch &1 already assigned; merge not possible | Space: object requires documentation | |
67 | ![]() |
Cancel confirmations before removing assignment to &1 | Space: object requires documentation | |
68 | ![]() |
PB not at top level; proposal of actual quantity not possible | Space: object requires documentation | |
69 | ![]() |
Process batch &1 has successor in combined order | Space: object requires documentation | |
70 | ![]() |
Process batch &1 already copied; split not possible | Space: object requires documentation | |
71 | ![]() |
Process batch &1 already copied; merge not possible | Space: object requires documentation | |
72 | ![]() |
Create segmentation order only with reference to one item | Space: object requires documentation | |
73 | ![]() |
Create segmentation order only with reference to one process batch | Space: object requires documentation | |
74 | ![]() |
Assignment of original batch to item &1 not possible | Space: object requires documentation | |
75 | ![]() |
Operation data cannot be determined | The short text describes the object sufficiently | |
76 | ![]() |
Seg. order not created (manually terminated or program error) | Space: object requires documentation | |
77 | ![]() |
Process batch &1 for order &2 not found | Space: object requires documentation | |
78 | ![]() |
GR batch &1 for order &2 not found | Space: object requires documentation | |
79 | ![]() |
Plant &1 from material doc. not same as plant &2 specifief for prod.batch | Space: object requires documentation | |
80 | ![]() |
Original batch cannot be determined using process batch &1 &2 | Space: object requires documentation | |
81 | ![]() |
Data inconsistency between original and process batch table | Space: object requires documentation | |
82 | ![]() |
& - process batch - production order ............: & | Space: object requires documentation | |
83 | ![]() |
Enter a different batch number for the GR batch | Space: object requires documentation | |
84 | ![]() |
No process batch is assigned to the order item | Space: object requires documentation | |
85 | ![]() |
An error occurred during comparison of the original batch buffer | Space: object requires documentation | |
86 | ![]() |
Process this order using transaction CO11N | Space: object requires documentation | |
87 | ![]() |
Internal Error | Space: object requires documentation | |
88 | ![]() |
Simultaneous GI and GR for order with co-product items not allowed | Space: object requires documentation | |
89 | ![]() |
GR batch inconsistent; segmentation order not assigned | Space: object requires documentation | |
90 | ![]() |
Input parameters incomplete | Space: object requires documentation | |
91 | ![]() |
PBs exist for order; new seg. orders can only be created for PB | Space: object requires documentation | |
92 | ![]() |
Batch master record does not exist for batch in selected row | Space: object requires documentation | |
93 | ![]() |
Reversal qty greater than stock; after reversal, qty will be negative | Space: object requires documentation | |
94 | ![]() |
Seg. order can only be assigned to another item | Space: object requires documentation | |
95 | ![]() |
Seg. order can only be assigned to another process batch | Space: object requires documentation | |
96 | ![]() |
Proc. batch &1 undeletable as succeeding proc. batches exist for template | Space: object requires documentation | |
97 | ![]() |
Process batch &2 has been copied and therefore cannot be deleted | Space: object requires documentation | |
98 | ![]() |
Enter a number for the GR batch | Space: object requires documentation | |
99 | ![]() |
Function cannot be carried out because of several PBs | Space: object requires documentation | |
100 | ![]() |
Component &1 is not subject to batch management in plant &2 | Space: object requires documentation | |
101 | ![]() |
Create the BR batch in the Process Batch section of the screen | Space: object requires documentation | |
102 | ![]() |
The data for the process batch comparison cannot be determined | Space: object requires documentation | |
103 | ![]() |
Material does not permit copying of GR rows | Space: object requires documentation | |
104 | ![]() |
Int. batch no. assignment not allowed; function is terminated | Space: object requires documentation | |
105 | ![]() |
Quantity cannot be converted | Space: object requires documentation | |
106 | ![]() |
Error opening material document | Space: object requires documentation | |
107 | ![]() |
All goods receipt batches already valuated | Space: object requires documentation | |
108 | ![]() |
No process batches exist for the order | Space: object requires documentation | |
109 | ![]() |
Material &1 does not exist in plant &2 | Space: object requires documentation | |
110 | ![]() |
PB assignment not unique; GR batch is not created | Space: object requires documentation | |
111 | ![]() |
PB assignment is not unique; batch determination is cancelled | Space: object requires documentation | |
112 | ![]() |
Internal batch number assignment not possible in 'Goods Receipt' area | Space: object requires documentation | |
113 | ![]() |
Batch characteristics cannot be changed as GR batch already created | Space: object requires documentation | |
114 | ![]() |
GR batch & cannot be created | Space: object requires documentation | |
115 | ![]() |
Material &1 is not subject to batch management in plant &2 | Space: object requires documentation | |
116 | ![]() |
Select a process batch | The short text describes the object sufficiently | |
117 | ![]() |
Select just one goods receipt row | The short text describes the object sufficiently | |
118 | ![]() |
Select the process batch to be assigned and a goods receipt row | The short text describes the object sufficiently | |
119 | ![]() |
Select just one process batch | The short text describes the object sufficiently | |
120 | ![]() |
Select a goods receipt row | The short text describes the object sufficiently | |
121 | ![]() |
Select a goods issue row | The short text describes the object sufficiently | |
122 | ![]() |
Select just one goods issue row | The short text describes the object sufficiently | |
123 | ![]() |
Select a batch | The short text describes the object sufficiently | |
124 | ![]() |
Select a goods issue row and a process batch | The short text describes the object sufficiently | |
125 | ![]() |
Select at least one process batch | The short text describes the object sufficiently | |
126 | ![]() |
Function canceled by user | Space: object requires documentation | |
127 | ![]() |
Preceding batch &1 not found | Space: object requires documentation | |
128 | ![]() |
Material &1 not found | Space: object requires documentation | |
129 | ![]() |
Order &1 does not exist | Space: object requires documentation | |
130 | ![]() |
Order &1 item &2 does not exist | Space: object requires documentation | |
131 | ![]() |
Internal Error | Space: object requires documentation | |
132 | ![]() |
Process batch &1 is flagged for deletion | Space: object requires documentation | |
133 | ![]() |
Batch &1 invalid | Space: object requires documentation | |
134 | ![]() |
Process batch processing not allowed for material &1 | Space: object requires documentation | |
135 | ![]() |
Enter a batch | The short text describes the object sufficiently | |
136 | ![]() |
Material &1 does not exist in plant &2 | Space: object requires documentation | |
137 | ![]() |
Material &1 locked by another user | Space: object requires documentation | |
138 | ![]() |
Plant &1 locked by another user | Space: object requires documentation | |
139 | ![]() |
Batch &1 locked by another user | Space: object requires documentation | |
140 | ![]() |
Batch &1 (material &2, plant &3) does not exist | Space: object requires documentation | |
141 | ![]() |
Error changing batch master | Space: object requires documentation | |
142 | ![]() |
Master record for original batch &1 locked by &2 | Space: object requires documentation | |
143 | ![]() |
Enter a batch number | Space: object requires documentation | |
144 | ![]() |
Special character &1 not allowed | Space: object requires documentation | |
145 | ![]() |
Error creating batch master | Space: object requires documentation | |
146 | ![]() |
Error deleting batch master | Space: object requires documentation | |
147 | ![]() |
Deletion indicator for batch &1 already selected | Space: object requires documentation | |
148 | ![]() |
Assignment can no longer be changed as GR already exists | Space: object requires documentation | |
149 | ![]() |
Assignment can no longer be changed as OB exists for item | Space: object requires documentation | |
150 | ![]() |
Function only valid for top-level process batches | Space: object requires documentation | |
151 | ![]() |
Assignment not possible as segmentation order exists | Space: object requires documentation | |
152 | ![]() |
Creating batch & | The short text describes the object sufficiently | |
153 | ![]() |
A goods receipt has already been posted for process batch &1 | The short text describes the object sufficiently | |
154 | ![]() |
Assignment not possible; unassigned rows exist for goods receipt item &1 | Space: object requires documentation | |
155 | ![]() |
Select a process batch and choose 'Enter' | Space: object requires documentation | |
156 | ![]() |
Confirm confirmation, otherwise there will be no activity data for operat | The short text describes the object sufficiently | |
157 | ![]() |
Process batch is preceding batch; characteristics should not be changed | Space: object requires documentation | |
158 | ![]() |
No batch creation possible for material &1 in the 'Goods Receipts' area | The short text describes the object sufficiently | |
159 | ![]() |
No batch determination possible for material & in 'Goods Receipts' area | The short text describes the object sufficiently | |
160 | ![]() |
No milestone confirmation possible for process batches | The short text describes the object sufficiently | |
161 | ![]() |
Enter a quantity | The short text describes the object sufficiently | |
162 | ![]() |
With process batches, no goods issue takes place for other operations | Space: object requires documentation | |
163 | ![]() |
Confirmation profile &1 not suited for use with documentary batches | Space: object requires documentation |
History
Last changed on/by | ![]() |
20050301 | SAP |
SAP Release Created in | 46C1 |