Data Element list used by SAP ABAP Table WCSALV42 (WCM: Work Permits)
SAP ABAP Table
WCSALV42 (WCM: Work Permits) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AUFNR | Order Number | ||
| 2 | CO_GLTRI | Actual finish date | ||
| 3 | CO_GLTRP | Basic finish date | ||
| 4 | CO_GLTRS | Scheduled finish | ||
| 5 | CO_GLUZP | Basic finish (time) | ||
| 6 | CO_GLUZS | Scheduled finish time | ||
| 7 | CO_GSTRI | Actual start date | ||
| 8 | CO_GSTRP | Basic start date | ||
| 9 | CO_GSTRS | Scheduled start | ||
| 10 | CO_GSUZI | Actual start time | ||
| 11 | CO_GSUZP | Basic start time | ||
| 12 | CO_GSUZS | Scheduled Start (Time) | ||
| 13 | EQUNR | Equipment Number | ||
| 14 | IAUTG | Authorization Group for Technical Object | ||
| 15 | ILOM_STTXS | Display lines for system status | ||
| 16 | ILOM_STTXU | Display lines for user status | ||
| 17 | INGRP | Planner Group for Customer Service and Plant Maintenance | ||
| 18 | IWERK | Maintenance Planning Plant | ||
| 19 | PRIOK | Priority | ||
| 20 | TPLNR | Functional Location | ||
| 21 | WCEAFTIME | Actual End Date (Time) | ||
| 22 | WCEANLZU | Overall Condition of Technical System | ||
| 23 | WCEAPRVICON | Approvals | ||
| 24 | WCEASGNICON | Assignments | ||
| 25 | WCEASGNICON | Assignments | ||
| 26 | WCECATALOGICON | Catalog | ||
| 27 | WCECATALOGICON | Catalog | ||
| 28 | WCECHDATE | Date on Which Object was Last Changed | ||
| 29 | WCECHNAME | Last Changed By | ||
| 30 | WCECHTIME | Time at Which Object was Last Changed | ||
| 31 | WCECRDATE | Date on Which the Object Was Created | ||
| 32 | WCECRNAME | Created by | ||
| 33 | WCECRTIME | Time at Which Object was Created | ||
| 34 | WCEDATEFR | Valid-From Date for WCM Object | ||
| 35 | WCEDATETO | Valid-To Date for WCM Object | ||
| 36 | WCEDIALOGICON | Maintenance Screen | ||
| 37 | WCEDOCMGNICON | Documents | ||
| 38 | WCEETAPE | Revision Phase | ||
| 39 | WCEEXTTOTPERIOD | Total Extension of Validity in Hours | ||
| 40 | WCELCPHASEICON | Life-Cycle Phase | ||
| 41 | WCELTXTICON | Long Text | ||
| 42 | WCENEED01 | Depressurization | ||
| 43 | WCENEED02 | Draining/Emptying | ||
| 44 | WCENEED03 | Cleaning/Hydrocarbon Freeing | ||
| 45 | WCENEED04 | Venting/Installation of Extra Ventilation | ||
| 46 | WCENEED05 | Prevent Release of Oil and Gas in the Work Area | ||
| 47 | WCENEED06 | Measures Against Radioactive Radiation | ||
| 48 | WCENEED07 | Regular Inspection of the Work Area | ||
| 49 | WCENEED08 | Gas Measurements Prior to/During Working Period | ||
| 50 | WCENEED09 | Fire Prevention | ||
| 51 | WCENEED10 | Continuous Guard/Radio | ||
| 52 | WCENEED11 | Drains Blocked/Covered | ||
| 53 | WCENEED12 | Set Up Barriers and Safety Signs | ||
| 54 | WCENEED13 | PA Announcements | ||
| 55 | WCENEED14 | Welding Machine Safely Located and Earthed | ||
| 56 | WCENEED15 | Follow Requirements for Work on Open Sea | ||
| 57 | WCENEED16 | Follow Requirements for Work At Height | ||
| 58 | WCENEED17 | HSE Datasheet Known and Available | ||
| 59 | WCENEED18 | Job Safety Analysis (JSA) | ||
| 60 | WCENEED19 | Lockout/Tagout | ||
| 61 | WCENEED20 | Provide Extinguishing Media | ||
| 62 | WCENEED21 | Set Up Fire Watch | ||
| 63 | WCENEED22 | Inform External Bodies | ||
| 64 | WCENEED23 | On-Site Instruction | ||
| 65 | WCENEED24 | Additional Protective Equipment | ||
| 66 | WCENEED25 | Maintain Initial List | ||
| 67 | WCENEED26 | Safety Staff | ||
| 68 | WCENEED27 | More Measures | ||
| 69 | WCENEED28 | Secure Installations | ||
| 70 | WCEOBJLSTICON | Object List | ||
| 71 | WCEOPLSTICON | Operational Lists | ||
| 72 | WCEOPSTEPICON | Operational Steps | ||
| 73 | WCEPARTNERICON | Partner | ||
| 74 | WCEPLANT | Plant for Work Center in WCM | ||
| 75 | WCEPROCESSICON | Switching Screen | ||
| 76 | WCERECTIME | Recall Time | ||
| 77 | WCERECUNIT | Unit of Recall Time | ||
| 78 | WCEREFKEY | Template | ||
| 79 | WCEREQTXTICON | Requalification Text | ||
| 80 | WCESTXT | Descriptive Short Text | ||
| 81 | WCETGTXTICON | Tagging Text | ||
| 82 | WCETIMEFR | Valid-From Time for WCM Object | ||
| 83 | WCETIMETO | Valid-To Time for WCM Object | ||
| 84 | WCETRAIN | Train | ||
| 85 | WCETYP | Type of WCM Object | ||
| 86 | WCEUNTGTXTICON | Untagging Text | ||
| 87 | WCEUSAGE | Usage of WCM Object | ||
| 88 | WCEVALIDICON | Validity | ||
| 89 | WCEWAPINR | Application | ||
| 90 | WCEWK01 | Hot Work A | ||
| 91 | WCEWK02 | Hot Work B in Classified Areas | ||
| 92 | WCEWK03 | Entry to Confined Spaces | ||
| 93 | WCEWK04 | Isolation and Testing or Bypassing of Safety Systems | ||
| 94 | WCEWK05 | Work on Hydrocarbon Systems (CmHn) | ||
| 95 | WCEWK06 | Pressure Testing | ||
| 96 | WCEWK07 | Work over Open Sea | ||
| 97 | WCEWK08 | Work with Hazardous Substances | ||
| 98 | WCEWK09 | Work with Radioactive Materials | ||
| 99 | WCEWK10 | Well Operation/Well Intervention | ||
| 100 | WCEWK11 | Work with Explosives | ||
| 101 | WCEWK12 | Critical Lifting Operations | ||
| 102 | WCEWK13 | Other Activities/Critical Operations | ||
| 103 | WCEWK14 | Nightwork | ||
| 104 | WCEWK15 | Work at Height | ||
| 105 | WCEWK16 | Overhead Work | ||
| 106 | WCEWK17 | Replacing Lamps | ||
| 107 | WCEWK18 | Work in Manholes | ||
| 108 | WCEWK19 | Cleaning Work | ||
| 109 | WCEWK20 | Demolition Work | ||
| 110 | WCEWK21 | Work on Ventilation | ||
| 111 | WCEWK22 | Work on Water Supply | ||
| 112 | WCEWK23 | Work on Gas Plant | ||
| 113 | WCEWK24 | Simultaneous Works | ||
| 114 | WCEWK25 | Restructuring Work | ||
| 115 | WCEWK26 | Painting Work | ||
| 116 | WCEWK27 | Checking | ||
| 117 | WCEWK28 | More Work | ||
| 118 | WCEWKCR | Work Center in WCM |