Data Element list used by SAP ABAP Table PPH_MDMA_SHORT (MRP Area for Material - reduced view for MT61D)
SAP ABAP Table
PPH_MDMA_SHORT (MRP Area for Material - reduced view for MT61D) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AHDIS | MRP relevancy for dependent requirements | ||
| 2 | APOKZ | Indicator: Is material relevant for APO | ||
| 3 | AUSSS | Assembly scrap in percent | ||
| 4 | BERID | MRP Area | ||
| 5 | BSTFE | Fixed lot size | ||
| 6 | BSTMA | Maximum lot size | ||
| 7 | BSTMI | Minimum lot size | ||
| 8 | BSTRF | Rounding value for purchase order quantity | ||
| 9 | DISGR | MRP Group | ||
| 10 | DISLS | Lot size (materials planning) | ||
| 11 | DISMM | MRP Type | ||
| 12 | DISPO | MRP controller | ||
| 13 | EISBE | Safety stock | ||
| 14 | FXHOR | Planning time fence | ||
| 15 | LAGPR | Storage costs indicator | ||
| 16 | LFRHY | Planning cycle | ||
| 17 | LGFSB | Default storage location for external procurement | ||
| 18 | LGPRO | Issue storage location | ||
| 19 | LOSFX | Ordering costs | ||
| 20 | LVORM | Deletion Indicator | ||
| 21 | MABST | Maximum stock level | ||
| 22 | MATNR | Material Number | ||
| 23 | MD_PLIFZ_DB | Consider Planned Delivery Time of the MRP Area | ||
| 24 | MINBE | Reorder point | ||
| 25 | MRPPP | PPC planning calendar | ||
| 26 | PLIFZ | Planned delivery time in days | ||
| 27 | PSTAT_D | Maintenance status | ||
| 28 | RDPRF | Rounding Profile | ||
| 29 | RWPRO | Range of coverage profile | ||
| 30 | SHFLG | Safety time indicator (with or without safety time) | ||
| 31 | SHPRO | Period profile for safety time | ||
| 32 | SHZET | Safety time (in workdays) | ||
| 33 | SOBSL | Special procurement type | ||
| 34 | TAKZT | Takt time | ||
| 35 | WERKDP | MRP area: Plant |