Data Element list used by SAP ABAP Table BADI_MDKP_EXT (Header Data MRP Document (Extract for BAdI))
SAP ABAP Table
BADI_MDKP_EXT (Header Data MRP Document (Extract for BAdI)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AHDIS | MRP relevancy for dependent requirements | ||
| 2 | AUSDT | Effective-out date | ||
| 3 | BDARF | Requirements quantity from material requirements planning | ||
| 4 | BEAZT | Processing time for purchase order proposal | ||
| 5 | BESKZ | Procurement Type | ||
| 6 | BSTFE | Fixed lot size | ||
| 7 | BSTMA | Maximum lot size | ||
| 8 | BSTMI | Minimum lot size | ||
| 9 | BSTRF | Rounding value for purchase order quantity | ||
| 10 | DISGR | MRP Group | ||
| 11 | DISLS | Lot size (materials planning) | ||
| 12 | DISMM | MRP Type | ||
| 13 | DISPO | MRP controller | ||
| 14 | DISVF | MRP procedure | ||
| 15 | EISBE | Safety stock | ||
| 16 | EKGRP | Purchasing group | ||
| 17 | FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 18 | FIXTR | End of planning time fence (date) | ||
| 19 | GRREL | Relevant for requirements grouping for project stock | ||
| 20 | KZAUS | Discontinuation indicator | ||
| 21 | LFRHY | Planning cycle | ||
| 22 | LOSKZ | Lot-size indicator for the short-term period | ||
| 23 | LOSVF | Lot-sizing procedure for short-term period | ||
| 24 | MAABC | ABC indicator | ||
| 25 | MABST | Maximum stock level | ||
| 26 | MFHKZ | Planning time fence set manually (MFXDT) | ||
| 27 | MFXDT | Manual firming date | ||
| 28 | MINBE | Reorder point | ||
| 29 | MRPPP | PPC planning calendar | ||
| 30 | MTWZT | Material replenishment lead time | ||
| 31 | NFMAT | Follow-up material | ||
| 32 | PERAZ | Number of periods for the short-term area | ||
| 33 | PERIV | Fiscal Year Variant | ||
| 34 | RDPRF | Rounding Profile | ||
| 35 | RWPRO | Range of coverage profile | ||
| 36 | SA_SAUFT | Ind.: Repetitive mfg allowed | ||
| 37 | SHFLG | Safety time indicator (with or without safety time) | ||
| 38 | SHPRO | Period profile for safety time | ||
| 39 | SHZET | Safety time (in workdays) | ||
| 40 | SOBES | Special procurement type | ||
| 41 | SOBSL | Special procurement type | ||
| 42 | WEBAZ | Goods receipt processing time in days | ||
| 43 | WRK02 | Planning/production plant |