Data Element list used by SAP ABAP Table /KYK/CM38_OUTPUT (Output Structure for Capacity Planning)
SAP ABAP Table
/KYK/CM38_OUTPUT (Output Structure for Capacity Planning) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ARBPL | Work center | ||
| 2 | ARBPLATZ | Work center ID | ||
| 3 | CYLIPERIOD | Period in capacity planning lists | ||
| 4 | CYSLIANGE | Available capacity in a period | ||
| 5 | CYSLIBED | Capacity requirements within the planning period | ||
| 6 | CYSLIBELAS | Load (%) within a period | ||
| 7 | CYSLIDELTA | Remaining available capacity within the planning period | ||
| 8 | CYVLIWERT | Value in variable overview (calculatn. controlled via table) | ||
| 9 | CY_GAUF | Ind: Take whole orders into account for the basic load | ||
| 10 | CY_KBERU | Sel.button: Take selected rqmts. into account for basic load | ||
| 11 | CY_KENTF | Selection button: Remove selected rqmts. from basic load | ||
| 12 | CY_KERMI | Selection button: Determine number of requirements affected | ||
| 13 | CY_KZEINPL | Indicator: Sufficient capacity to process op. in plan.period | ||
| 14 | CY_POOLKZ | Ind: Take into account all rqmts for pool.caps affected | ||
| 15 | CY_RWQTOT | Capacity requirements within the planning period | ||
| 16 | CY_RWQVER | Capacity rqmts. from planned order or works order in period | ||
| 17 | CY_VERSCH | Shift of start date (in work days) | ||
| 18 | KAPAR | Capacity category | ||
| 19 | KAPEH | Unit of the capacity requirements | ||
| 20 | KAPID | Capacity ID | ||
| 21 | WERKS_D | Plant |