SAP ABAP Data Element CY_KZEINPL (Indicator: Sufficient capacity to process op. in plan.period)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element CY_KZEINPL
Short Description Indicator: Sufficient capacity to process op. in plan.period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KREUZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cap.conf. 
Medium 15 Cap. confirmed 
Long 20 Capacity confirmed 
Heading
Documentation

Definition

  • If an "X" is shown in this field then there is enough available capacity to execute the operation. The settings are taken from the overall profile.
  • If this field is ready for entry and no value is displayed then the corresponding operation cannot, in these circumstances, be carried out with the capacity available. You may have defined the planning period too narrowly.
  • If this field is not ready for entry then the corresponding operation has no requirements or it occupies capacities that are not relevant for finite scheduling (the indicator relevant for finite scheduling has not been set in the header screen of the work center capacity.

History
Last changed by/on SAP  19960404 
SAP Release Created in