Table/Structure Field list used by SAP ABAP Program RCNST1000F53 (Include RCNST1000F53)
SAP ABAP Program RCNST1000F53 (Include RCNST1000F53) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  ACT01 - OBJNR Object number
2 Table/Structure Field  ACTR - ARBPL Work center
3 Table/Structure Field  ACTR - BUKRS Company Code
4 Table/Structure Field  ACTR - EWEND Forecast finish date
5 Table/Structure Field  ACTR - EWSTD Forecasted start date for the activity
6 Table/Structure Field  ACTR - FPAVD Earliest scheduled start date (forecast)
7 Table/Structure Field  ACTR - FPEDD Earliest scheduled finish date (forecast)
8 Table/Structure Field  ACTR - FRUEHER Actual start is before earliest scheduled start
9 Table/Structure Field  ACTR - FSAVD Earliest scheduled start: Execution (date)
10 Table/Structure Field  ACTR - FSEDD Earliest scheduled finish: Execution (date)
11 Table/Structure Field  ACTR - IEDD Actual finish: Execution (date)
12 Table/Structure Field  ACTR - ISDD Actual start: Execution (date)
13 Table/Structure Field  ACTR - LTXA1 Operation short text
14 Table/Structure Field  ACTR - MLSTN Usage
15 Table/Structure Field  ACTR - NPRIO Priority
16 Table/Structure Field  ACTR - NTANF Constraint for activity start (Basic)
17 Table/Structure Field  ACTR - NTEND Constraint for finish of activity (Basic)
18 Table/Structure Field  ACTR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
19 Table/Structure Field  ACTR - SPAVD Latest scheduled start date (forecast)
20 Table/Structure Field  ACTR - SPEDD Latest scheduled finish date (forecast)
21 Table/Structure Field  ACTR - SSAVD Latest scheduled start: Execution (date)
22 Table/Structure Field  ACTR - SSEDD Latest scheduled finish: Execution (date)
23 Table/Structure Field  ACTR - STATXT Edited status text
24 Table/Structure Field  ACTR - USR00 User field with 20 characters
25 Table/Structure Field  ACTR - USR01 User field with 20 characters
26 Table/Structure Field  ACTR - USR02 User field with 10 characters
27 Table/Structure Field  ACTR - USR03 User field with 10 characters
28 Table/Structure Field  ACTR - USR04 User field for quantity (length 10.3)
29 Table/Structure Field  ACTR - USR05 User field for quantity (length 10.3)
30 Table/Structure Field  ACTR - USR06 User-defined field for values (length 10,3)
31 Table/Structure Field  ACTR - USR07 User-defined field for values (length 10,3)
32 Table/Structure Field  ACTR - USR08 User field for date
33 Table/Structure Field  ACTR - USR09 User field for date
34 Table/Structure Field  ACTR - USR10 User-defined field: Indicator for reports
35 Table/Structure Field  ACTR - USR11 User-defined field: Indicator for reports
36 Table/Structure Field  ACTR - UVORN Activity element number (work/external/general costs)
37 Table/Structure Field  ACTR - VERZUG Duration After Latest Scheduled Finish
38 Table/Structure Field  ACTR - VGTYP Activity or element category
39 Table/Structure Field  ACTR - VORBEI Duration After Earliest Scheduled Start
40 Table/Structure Field  ACTR - VORNR Activity number in network and standard network
41 Table/Structure Field  ACTR - WERKS Plant
42 Table/Structure Field  AFABR - ARBPL Work center
43 Table/Structure Field  AFABR - FEABD Earliest finish date for the relationship
44 Table/Structure Field  AFABR - FSABD Earliest start date for the relationship
45 Table/Structure Field  AFABR - NCH Single-Character Flag
46 Table/Structure Field  AFABR - NCVOR Indicates whether data after predecessor is maintained
47 Table/Structure Field  AFABR - SEABD Latest finish date of the relationship
48 Table/Structure Field  AFABR - SSABD Latest start date of the relationship
49 Table/Structure Field  AFABR - WERKS Plant
50 Table/Structure Field  AFFH - OBJNR Object number
51 Table/Structure Field  AFFH01 - OBJNR Object number
52 Table/Structure Field  AFFHD - OBJNR Object number
53 Table/Structure Field  AFFHR - FEFHD Earliest scheduled finish (date) of PRT usage
54 Table/Structure Field  AFFHR - FHKTX Description of the production resource/tool
55 Table/Structure Field  AFFHR - FSFHD Earliest scheduled start (date) for PRT usage
56 Table/Structure Field  AFFHR - IEFHD Actual finish (date) of PRT usage
57 Table/Structure Field  AFFHR - ISFHD Actual start (date) of PRT usage
58 Table/Structure Field  AFFHR - SEFHD Latest scheduled finish (date) of PRT usage
59 Table/Structure Field  AFFHR - SFHNR Production resources and tools
60 Table/Structure Field  AFFHR - SSFHD Latest scheduled start (date) for PRT usage
61 Table/Structure Field  AFFHR - STATXT Edited status text
62 Table/Structure Field  AFFH_INC - OBJNR Object number
63 Table/Structure Field  AFRUR - ARBPL Work center
64 Table/Structure Field  AFRUR - IEDD Actual finish: Execution (date)
65 Table/Structure Field  AFRUR - ISDD Actual start: Execution (date)
66 Table/Structure Field  AFRUR - PEDD Forecast finish date of operation from confirmation
67 Table/Structure Field  AFRUR - WERKS Plant
68 Table/Structure Field  AFVGD - OBJNR Object number
69 Table/Structure Field  AFVGI - OBJNR Object number
70 Table/Structure Field  AUFK - OBJNR Object number
71 Table/Structure Field  AUFKR - APRIO Order priority
72 Table/Structure Field  AUFKR - AUFNR Order Number
73 Table/Structure Field  AUFKR - BUKRS Company Code
74 Table/Structure Field  AUFKR - DISPO MRP controller for the order
75 Table/Structure Field  AUFKR - FEVOR Production Supervisor
76 Table/Structure Field  AUFKR - FRUEHER Actual start is before earliest scheduled start
77 Table/Structure Field  AUFKR - GETRI Confirmed Order Finish Date
78 Table/Structure Field  AUFKR - GLTRI Actual finish date
79 Table/Structure Field  AUFKR - GLTRP Basic finish date
80 Table/Structure Field  AUFKR - GLTRS Scheduled finish
81 Table/Structure Field  AUFKR - GSTRI Actual start date
82 Table/Structure Field  AUFKR - GSTRP Basic start date
83 Table/Structure Field  AUFKR - GSTRS Scheduled start
84 Table/Structure Field  AUFKR - KTEXT Description
85 Table/Structure Field  AUFKR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
86 Table/Structure Field  AUFKR - STATXT Edited status text
87 Table/Structure Field  AUFKR - VERZUG Duration After Latest Scheduled Finish
88 Table/Structure Field  AUFKR - VORBEI Duration After Earliest Scheduled Start
89 Table/Structure Field  AUFKR - WERKS Plant
90 Table/Structure Field  CNJ_STAT - OBJNR Object number
91 Table/Structure Field  DFIES - FIELDNAME Field Name
92 Table/Structure Field  DFIES - OUTPUTLEN Output Length
93 Table/Structure Field  DFIES - REFFIELD Reference field for currency and qty fields
94 Table/Structure Field  DFIES - REFTABLE Table for reference field
95 Table/Structure Field  DFIES - TABNAME Table Name
96 Table/Structure Field  FILTR - FLG_CRIT Indicator: Activity is critical
97 Table/Structure Field  FILTR - FLG_SUBCRT Indicator: Activity is sub-critical
98 Table/Structure Field  JEST - OBJNR Object number
99 Table/Structure Field  KBEDR - ARBPL Work center
100 Table/Structure Field  KBEDR - FENDD Earliest finish /date
101 Table/Structure Field  KBEDR - FSTAD Earliest start / date
102 Table/Structure Field  KBEDR - IENDD Actual finish / date
103 Table/Structure Field  KBEDR - ISTAD Actual start / date
104 Table/Structure Field  KBEDR - PENDD Forecast finish / date
105 Table/Structure Field  KBEDR - SENDD Latest finish / date
106 Table/Structure Field  KBEDR - SSTAD Latest start / date
107 Table/Structure Field  KBEDR - WERKS Plant
108 Table/Structure Field  MCS01 - DISPL_ONLY Yes/No (X/ )
109 Table/Structure Field  MCS01 - FIELDNAME Field Name
110 Table/Structure Field  MCS01 - GESAMTKZ Indicator, whether key figure values can be added together
111 Table/Structure Field  MCS01 - REFFIELD Reference field for currency and qty fields
112 Table/Structure Field  MCS01 - REFTABLE Table for reference field
113 Table/Structure Field  MCS01 - TABNAME Table Name
114 Table/Structure Field  MCS03 - AUSTABFELD Field name
115 Table/Structure Field  MCS03 - FIELDNAME Field Name
116 Table/Structure Field  MCS03 - GESAMTKZ Indicator, whether key figure values can be added together
117 Table/Structure Field  MCS03 - REFFIELD Reference field for currency and qty fields
118 Table/Structure Field  MCS03 - REFLEN Output Length
119 Table/Structure Field  MCS03 - REFTABLE Table for reference field
120 Table/Structure Field  MCS03 - SCRTEXT_L Long Field Label
121 Table/Structure Field  MLSTR - EDATU Fixed milestone date (basic)
122 Table/Structure Field  MLSTR - FRUEHER Actual start is before earliest scheduled start
123 Table/Structure Field  MLSTR - KTEXT Description
124 Table/Structure Field  MLSTR - LST_ACTDT Actual date (Milestone met)
125 Table/Structure Field  MLSTR - MLSTN Usage
126 Table/Structure Field  MLSTR - PDATU Fixed milestone date (F)
127 Table/Structure Field  MLSTR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
128 Table/Structure Field  MLSTR - TEDAT Scheduled milestone date (Basic)
129 Table/Structure Field  MLSTR - TPDAT Scheduled milestone date (Forecast)
130 Table/Structure Field  MLSTR - VERZUG Duration After Latest Scheduled Finish
131 Table/Structure Field  MLSTR - VORBEI Duration After Earliest Scheduled Start
132 Table/Structure Field  NETZR - APRIO Order priority
133 Table/Structure Field  NETZR - AUFNR Network number
134 Table/Structure Field  NETZR - BUKRS Company Code
135 Table/Structure Field  NETZR - DISPO MRP controller for the order
136 Table/Structure Field  NETZR - FEVOR Production Supervisor
137 Table/Structure Field  NETZR - FRUEHER Actual start is before earliest scheduled start
138 Table/Structure Field  NETZR - GETRI Confirmed Order Finish Date
139 Table/Structure Field  NETZR - GLTRP Basic finish date
140 Table/Structure Field  NETZR - GLTRS Scheduled finish
141 Table/Structure Field  NETZR - GSTRI Actual start date
142 Table/Structure Field  NETZR - GSTRP Basic start date
143 Table/Structure Field  NETZR - GSTRS Scheduled start
144 Table/Structure Field  NETZR - KTEXT Description
145 Table/Structure Field  NETZR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
146 Table/Structure Field  NETZR - STATXT Edited status text
147 Table/Structure Field  NETZR - VERZUG Duration After Latest Scheduled Finish
148 Table/Structure Field  NETZR - VORBEI Duration After Earliest Scheduled Start
149 Table/Structure Field  NETZR - WERKS Plant
150 Table/Structure Field  PLAFR - DISPO MRP controller
151 Table/Structure Field  PLAFR - MTEXT Material description
152 Table/Structure Field  PLAFR - PEDTR Order finish date in the planned order
153 Table/Structure Field  PLAFR - PLNUM Planned order number
154 Table/Structure Field  PLAFR - PLWRK Planning Plant
155 Table/Structure Field  PLAFR - PSTTR Order start date in planned order
156 Table/Structure Field  PLAFR - PWWRK Production plant in planned order
157 Table/Structure Field  PLAFR - TERED Scheduled finish
158 Table/Structure Field  PLAFR - TERST Scheduled start
159 Table/Structure Field  PROJ - OBJNR Object number
160 Table/Structure Field  PROJ2_INC - OBJNR Object number
161 Table/Structure Field  PROJR - PLFAZ Project planned start date
162 Table/Structure Field  PROJR - PLSEZ Project planned finish date
163 Table/Structure Field  PROJR - POST1 PS: Short description (first text line)
164 Table/Structure Field  PROJR - PSPID Project definition
165 Table/Structure Field  PROJR - STATXT Edited status text
166 Table/Structure Field  PROJR - VBUKR Company code for the project
167 Table/Structure Field  PROJR - VERNA Name of responsible person (Project manager)
168 Table/Structure Field  PROJR - VERNR Number of the responsible person (project manager)
169 Table/Structure Field  PROJR - WERKS Plant
170 Table/Structure Field  PROJ_INC - OBJNR Object number
171 Table/Structure Field  PRPS - OBJNR Object number
172 Table/Structure Field  PRPSR - EENDE Forecasted finish date of the WBS element
173 Table/Structure Field  PRPSR - ESTRT Forecasted start date of the WBS element
174 Table/Structure Field  PRPSR - FKOKR Controlling area of responsible cost center
175 Table/Structure Field  PRPSR - FKSTL Responsible cost center
176 Table/Structure Field  PRPSR - FRUEHER Actual start is before earliest scheduled start
177 Table/Structure Field  PRPSR - IENDE Actual finish date of the WBS element
178 Table/Structure Field  PRPSR - ISTRT Actual start date for the WBS element
179 Table/Structure Field  PRPSR - PBUKR Company code for WBS element
180 Table/Structure Field  PRPSR - PENDE WBS element: Basic finish date
181 Table/Structure Field  PRPSR - POSID Work Breakdown Structure Element (WBS Element)
182 Table/Structure Field  PRPSR - POST1 PS: Short description (first text line)
183 Table/Structure Field  PRPSR - PSPRI Project priority
184 Table/Structure Field  PRPSR - PSTRT WBS element: Basic start date
185 Table/Structure Field  PRPSR - SPAETER Actual Finish/Planned Finish After Latest Scheduled Finish
186 Table/Structure Field  PRPSR - STATXT Edited status text
187 Table/Structure Field  PRPSR - USR00 1st user field for 20 characters - WBS element-
188 Table/Structure Field  PRPSR - USR01 2nd user field 20 digits - WBS element
189 Table/Structure Field  PRPSR - USR02 3rd user-defined field 10 digits -WBS element
190 Table/Structure Field  PRPSR - USR03 4th user-defined field 10 digits -WBS element
191 Table/Structure Field  PRPSR - USR04 1st user-defined field for quantity(length 10,3) WBS element
192 Table/Structure Field  PRPSR - USR05 2nd use field for quantity (length 10,3) WBS element
193 Table/Structure Field  PRPSR - USR06 1st user field for values (length 10,3) WBS element
194 Table/Structure Field  PRPSR - USR07 2nd user field for values (length 10,3) -WBS element
195 Table/Structure Field  PRPSR - USR08 1st user field for date -WBS element
196 Table/Structure Field  PRPSR - USR09 2nd user field for date -WBS element
197 Table/Structure Field  PRPSR - USR10 1st user field for 'Ind. for evaluations' WBS elem.
198 Table/Structure Field  PRPSR - USR11 2nd user field for 'Indicator for eval.s' WBS elemnt
199 Table/Structure Field  PRPSR - VERNA Name of responsible person (Project manager)
200 Table/Structure Field  PRPSR - VERNR Number of the responsible person (project manager)
201 Table/Structure Field  PRPSR - VERZUG Duration After Latest Scheduled Finish
202 Table/Structure Field  PRPSR - VORBEI Duration After Earliest Scheduled Start
203 Table/Structure Field  PRPSR - WERKS Plant
204 Table/Structure Field  PRPS_INC - OBJNR Object number
205 Table/Structure Field  PRPS_R - OBJNR Object number
206 Table/Structure Field  PSTXR - TXTAR Text type
207 Table/Structure Field  PSTXR - TXTTI PS text description
208 Table/Structure Field  RC27X - FLG_SEL Selection indicator
209 Table/Structure Field  RCJ_RPSCO_LIS - AUFERLPLAN Current order revenue plan
210 Table/Structure Field  RCJ_RPSCO_LIS - AUFERLPLN2 Order revenue plan (version 2)
211 Table/Structure Field  RCJ_RPSCO_LIS - AUFKSTPLAN Current order cost plan
212 Table/Structure Field  RCJ_RPSCO_LIS - AUFKSTPLN2 Order cost plan (version 2)
213 Table/Structure Field  RCJ_RPSCO_LIS - AUFTRANF Residual order plan
214 Table/Structure Field  RCJ_RPSCO_LIS - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
215 Table/Structure Field  RCJ_RPSCO_LIS - DEBFINPLN Current cash budget, debit side
216 Table/Structure Field  RCJ_RPSCO_LIS - DZHLNG Total debit side payments (down payments and payments)
217 Table/Structure Field  RCJ_RPSCO_LIS - FESTPROBL Fixed price commitment
218 Table/Structure Field  RCJ_RPSCO_LIS - FREIGABE Release
219 Table/Structure Field  RCJ_RPSCO_LIS - ISTERLOESE Actual revenues
220 Table/Structure Field  RCJ_RPSCO_LIS - ISTKOSTEN Actual costs
221 Table/Structure Field  RCJ_RPSCO_LIS - KREDFINPLN Current financial budget, credit side
222 Table/Structure Field  RCJ_RPSCO_LIS - KSTOBLGES Total cost commitment
223 Table/Structure Field  RCJ_RPSCO_LIS - KZHLNG Total credit side payments (down payments and payments)
224 Table/Structure Field  RCJ_RPSCO_LIS - PROERLPLAN Current project revenue plan
225 Table/Structure Field  RCJ_RPSCO_LIS - PROERLPLN2 Project revenue plan (version 2)
226 Table/Structure Field  RCJ_RPSCO_LIS - PROKSTPLAN Current project cost plan
227 Table/Structure Field  RCJ_RPSCO_LIS - PROKSTPLN2 Project cost plan (version 2)
228 Table/Structure Field  RESB - OBJNR Object number
229 Table/Structure Field  RESB01 - OBJNR Object number
230 Table/Structure Field  RESBD - OBJNR Object number
231 Table/Structure Field  RESBR - POTX1 BOM Item Text (Line 1)
232 Table/Structure Field  RESBR - RSNUM Number of reservation/dependent requirements
233 Table/Structure Field  RESBR - STATXT Edited status text
234 Table/Structure Field  RESBR - WERKS Plant
235 Table/Structure Field  RPSCO_LISC - AUFERLPLAN Current order revenue plan
236 Table/Structure Field  RPSCO_LISC - AUFERLPLN2 Order revenue plan (version 2)
237 Table/Structure Field  RPSCO_LISC - AUFKSTPLAN Current order cost plan
238 Table/Structure Field  RPSCO_LISC - AUFKSTPLN2 Order cost plan (version 2)
239 Table/Structure Field  RPSCO_LISC - AUFTRANF Residual order plan
240 Table/Structure Field  RPSCO_LISC - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
241 Table/Structure Field  RPSCO_LISC - DEBFINPLN Current cash budget, debit side
242 Table/Structure Field  RPSCO_LISC - DZHLNG Total debit side payments (down payments and payments)
243 Table/Structure Field  RPSCO_LISC - FESTPROBL Fixed price commitment
244 Table/Structure Field  RPSCO_LISC - FREIGABE Release
245 Table/Structure Field  RPSCO_LISC - ISTERLOESE Actual revenues
246 Table/Structure Field  RPSCO_LISC - ISTKOSTEN Actual costs
247 Table/Structure Field  RPSCO_LISC - KREDFINPLN Current financial budget, credit side
248 Table/Structure Field  RPSCO_LISC - KSTOBLGES Total cost commitment
249 Table/Structure Field  RPSCO_LISC - KZHLNG Total credit side payments (down payments and payments)
250 Table/Structure Field  RPSCO_LISC - PROERLPLAN Current project revenue plan
251 Table/Structure Field  RPSCO_LISC - PROERLPLN2 Project revenue plan (version 2)
252 Table/Structure Field  RPSCO_LISC - PROKSTPLAN Current project cost plan
253 Table/Structure Field  RPSCO_LISC - PROKSTPLN2 Project cost plan (version 2)
254 Table/Structure Field  STRUCR - ABARBA Percent of completion for work
255 Table/Structure Field  STRUCR - ABARBD Processing % of duration
256 Table/Structure Field  STRUCR - AUFERLPLAN Current order revenue plan
257 Table/Structure Field  STRUCR - AUFERLPLN2 Order revenue plan (version 2)
258 Table/Structure Field  STRUCR - AUFKSTPLAN Current order cost plan
259 Table/Structure Field  STRUCR - AUFKSTPLN2 Order cost plan (version 2)
260 Table/Structure Field  STRUCR - AUFTRANF Residual order plan
261 Table/Structure Field  STRUCR - BUDGET Budget of a Measure (App. Request Variant Was Replaced)
262 Table/Structure Field  STRUCR - BUKRS Company Code
263 Table/Structure Field  STRUCR - DEBFINPLN Current cash budget, debit side
264 Table/Structure Field  STRUCR - DZHLNG Total debit side payments (down payments and payments)
265 Table/Structure Field  STRUCR - EARBEI Work
266 Table/Structure Field  STRUCR - EDAUER Duration
267 Table/Structure Field  STRUCR - FESTPROBL Fixed price commitment
268 Table/Structure Field  STRUCR - FREIGABE Release
269 Table/Structure Field  STRUCR - IARBEI Actual work
270 Table/Structure Field  STRUCR - IDAUER Actual duration
271 Table/Structure Field  STRUCR - ISTERLOESE Actual revenues
272 Table/Structure Field  STRUCR - ISTKOSTEN Actual costs
273 Table/Structure Field  STRUCR - KREDFINPLN Current financial budget, credit side
274 Table/Structure Field  STRUCR - KSTOBLGES Total cost commitment
275 Table/Structure Field  STRUCR - KZHLNG Total credit side payments (down payments and payments)
276 Table/Structure Field  STRUCR - OBJEKTID ID/Object key
277 Table/Structure Field  STRUCR - PARBEI Forecast work
278 Table/Structure Field  STRUCR - PDAUER Forecast duration
279 Table/Structure Field  STRUCR - PROERLPLAN Current project revenue plan
280 Table/Structure Field  STRUCR - PROERLPLN2 Project revenue plan (version 2)
281 Table/Structure Field  STRUCR - PROKSTPLAN Current project cost plan
282 Table/Structure Field  STRUCR - PROKSTPLN2 Project cost plan (version 2)
283 Table/Structure Field  STRUCR - RARBEI Remaining work
284 Table/Structure Field  STRUCR - RDAUER Remaining duration
285 Table/Structure Field  STRUCR - STATXT Edited status text
286 Table/Structure Field  STRUCR - VARBEI Tentative work
287 Table/Structure Field  STRUCR - VDAUER Tentative duration
288 Table/Structure Field  STRUCR - VERNA Name of responsible person (Project manager)
289 Table/Structure Field  STRUCR - VERNR Number of responsible person (project mgr)/MRP controller
290 Table/Structure Field  STRUCR - WAERS Currency Key
291 Table/Structure Field  STRUCR - WERKS Plant
292 Table/Structure Field  STRUCR_BEFORE_DATES - OBJEKTID ID/Object key
293 Table/Structure Field  STRUCR_BEFORE_RPSCO - BUKRS Company Code
294 Table/Structure Field  STRUCR_BEFORE_RPSCO - STATXT Edited status text
295 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERNA Name of responsible person (Project manager)
296 Table/Structure Field  STRUCR_BEFORE_RPSCO - VERNR Number of responsible person (project mgr)/MRP controller
297 Table/Structure Field  STRUCR_BEFORE_RPSCO - WAERS Currency Key
298 Table/Structure Field  STRUCR_BEFORE_RPSCO - WERKS Plant
299 Table/Structure Field  STRUCR_BEFORE_USER - ABARBA Percent of completion for work
300 Table/Structure Field  STRUCR_BEFORE_WORK - ABARBD Processing % of duration
301 Table/Structure Field  STRUCR_BEFORE_WORK - EDAUER Duration
302 Table/Structure Field  STRUCR_BEFORE_WORK - IDAUER Actual duration
303 Table/Structure Field  STRUCR_BEFORE_WORK - PDAUER Forecast duration
304 Table/Structure Field  STRUCR_BEFORE_WORK - RDAUER Remaining duration
305 Table/Structure Field  STRUCR_BEFORE_WORK - VDAUER Tentative duration
306 Table/Structure Field  STRUCR_WORK - EARBEI Work
307 Table/Structure Field  STRUCR_WORK - IARBEI Actual work
308 Table/Structure Field  STRUCR_WORK - PARBEI Forecast work
309 Table/Structure Field  STRUCR_WORK - RARBEI Remaining work
310 Table/Structure Field  STRUCR_WORK - VARBEI Tentative work
311 Table/Structure Field  SYST - INDEX ABAP System Field: Loop Index
312 Table/Structure Field  SYST - LDBPG ABAP System Field: Database Program of Logical Database
313 Table/Structure Field  SYST - TABIX ABAP System Field: Row Index of Internal Tables
314 Table/Structure Field  TCNT - SELID Selection ID for status filter
315 Table/Structure Field  TCURX - CURRDEC Number of decimal places
316 Table/Structure Field  TCURX - CURRKEY Currency Key
317 Table/Structure Field  TJ48 - SELID Selection ID
318 Table/Structure Field  TMC4 - GSTRU Generated DDIC table for LIS, conditions, messages
319 Table/Structure Field  TMC7 - ZUSATZ_TAB Table Name
320 Table/Structure Field  TMC73 - FIELDNAME Field Name
321 Table/Structure Field  TMC73 - GESAMTKZ Indicator, whether key figure values can be added together
322 Table/Structure Field  TMC73 - TABNAME Table Name
323 Table/Structure Field  VBAK - OBJNR Object number at header level
324 Table/Structure Field  VBAKR - BUKRS_VF Company code to be billed
325 Table/Structure Field  VBAKR - GUEBG Valid-from date (outline agreements, product proposals)
326 Table/Structure Field  VBAKR - GUEEN Valid-to date (outline agreements, product proposals)
327 Table/Structure Field  VBAKR - KDAUF Sales Document
328 Table/Structure Field  VBAKR - KOKRS Controlling Area
329 Table/Structure Field  VBAKR - KOSTL Cost Center
330 Table/Structure Field  VBAKR - KTEXT Search term for product proposal
331 Table/Structure Field  VBAKR - STATXT Edited status text
332 Table/Structure Field  VBAPR - ARKTX Short text for sales order item
333 Table/Structure Field  VBAPR - KDPOS Sales Document Item
334 Table/Structure Field  VBAPR - STATXT Edited status text
335 Table/Structure Field  VBAPR - WERKS Plant