| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ACT01 - APLZL | General counter for order | ||
| 2 | ACT01 - ARBID | Object ID of the resource | ||
| 3 | ACT01 - AUFPL | Routing number of operations in the order | ||
| 4 | ACT01 - FLG_LOE | Indicator: Operation is deleted | ||
| 5 | ACT01 - OBJNR | Object number | ||
| 6 | ACT01 - PROJN | Work breakdown structure element (WBS element) | ||
| 7 | ACT01 - SUMNR | Node number of the superior operation | ||
| 8 | ACT01 - VORNR | Operation/Activity Number | ||
| 9 | ACTR - VGTYP | Activity or element category | ||
| 10 | ADMI_RUN - COMMENTS | Archiving Session Note | ||
| 11 | ADMI_RUN - DOCUMENT | Archiving Session Number | ||
| 12 | AFAB - APLZL_NCH | Internal counter | ||
| 13 | AFAB - APLZL_VOR | Internal counter | ||
| 14 | AFAB - ARBID | Object ID | ||
| 15 | AFAB - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 16 | AFAB - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 17 | AFAB - LOEKZ | Indicates whether an object is logically deleted. | ||
| 18 | AFAB - OBJNR | Object number | ||
| 19 | AFAB01 - APLZL_NCH | Internal counter | ||
| 20 | AFAB01 - APLZL_VOR | Internal counter | ||
| 21 | AFAB01 - ARBID | Object ID | ||
| 22 | AFAB01 - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 23 | AFAB01 - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 24 | AFAB01 - LOEKZ | Indicates whether an object is logically deleted. | ||
| 25 | AFAB_INC - ARBID | Object ID | ||
| 26 | AFAB_INC - LOEKZ | Indicates whether an object is logically deleted. | ||
| 27 | AFAB_INC - OBJNR | Object number | ||
| 28 | AFFH - APLZL | Internal counter | ||
| 29 | AFFH - AUFPL | Routing number of operations in the order | ||
| 30 | AFFH - LOEKZ | Deletion Indicator | ||
| 31 | AFFH - OBJID | Object ID of the resource | ||
| 32 | AFFH - OBJNR | Object number | ||
| 33 | AFFH - OBJTY | Object types of the CIM resource | ||
| 34 | AFFH - PSNFH | Item Number for Production Resource/Tool | ||
| 35 | AFFH - PZLFH | Item counter for production resources/tools | ||
| 36 | AFFH01 - APLZL | Internal counter | ||
| 37 | AFFH01 - AUFPL | Routing number of operations in the order | ||
| 38 | AFFH01 - LOEKZ | Deletion Indicator | ||
| 39 | AFFH01 - OBJID | Object ID of the resource | ||
| 40 | AFFH01 - OBJNR | Object number | ||
| 41 | AFFH01 - OBJTY | Object types of the CIM resource | ||
| 42 | AFFH01 - PZLFH | Item counter for production resources/tools | ||
| 43 | AFFHD - APLZL | Internal counter | ||
| 44 | AFFHD - AUFPL | Routing number of operations in the order | ||
| 45 | AFFHD - LOEKZ | Deletion Indicator | ||
| 46 | AFFHD - OBJID | Object ID of the resource | ||
| 47 | AFFHD - OBJNR | Object number | ||
| 48 | AFFHD - OBJTY | Object types of the CIM resource | ||
| 49 | AFFHD - PZLFH | Item counter for production resources/tools | ||
| 50 | AFFH_INC - APLZL | Internal counter | ||
| 51 | AFFH_INC - LOEKZ | Deletion Indicator | ||
| 52 | AFFH_INC - OBJID | Object ID of the resource | ||
| 53 | AFFH_INC - OBJNR | Object number | ||
| 54 | AFFH_INC - OBJTY | Object types of the CIM resource | ||
| 55 | AFFH_INC - PSNFH | Item Number for Production Resource/Tool | ||
| 56 | AFKO - APLZT | General counter for order | ||
| 57 | AFKO - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 58 | AFKO - AUFPL | Routing number of operations in the order | ||
| 59 | AFKO - AUFPT | Routing number of operations in the order | ||
| 60 | AFKO - DISPO | MRP controller for the order | ||
| 61 | AFKO - FEVOR | Production Supervisor | ||
| 62 | AFKO - PLNAW | Application of the task list | ||
| 63 | AFKO - PROFID | Network profile | ||
| 64 | AFKO - PRONR | Project definition | ||
| 65 | AFKO_INC - APLZT | General counter for order | ||
| 66 | AFKO_INC - AUFLD | Date of BOM Explosion/Routing Transfer | ||
| 67 | AFKO_INC - AUFPL | Routing number of operations in the order | ||
| 68 | AFKO_INC - AUFPT | Routing number of operations in the order | ||
| 69 | AFKO_INC - DISPO | MRP controller for the order | ||
| 70 | AFKO_INC - FEVOR | Production Supervisor | ||
| 71 | AFKO_INC - PLNAW | Application of the task list | ||
| 72 | AFKO_INC - PROFID | Network profile | ||
| 73 | AFKO_INC - PRONR | Project definition | ||
| 74 | AFPO - PROJN | Work breakdown structure element (WBS element) | ||
| 75 | AFPO_INC - PROJN | Work breakdown structure element (WBS element) | ||
| 76 | AFRU - APLZL | General counter for order | ||
| 77 | AFRU - ARBID | Object ID | ||
| 78 | AFRU - AUFPL | Routing number of operations in the order | ||
| 79 | AFRU - CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | ||
| 80 | AFRU - KAPID | Capacity ID | ||
| 81 | AFRU - SUMNR | Node number of the superior operation | ||
| 82 | AFRU01 - APLZL | General counter for order | ||
| 83 | AFRU01 - ARBID | Object ID | ||
| 84 | AFRU01 - AUFPL | Routing number of operations in the order | ||
| 85 | AFRU01 - CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | ||
| 86 | AFRU01 - KAPID | Capacity ID | ||
| 87 | AFRU01 - SUMNR | Node number of the superior operation | ||
| 88 | AFVGD - APLZL | General counter for order | ||
| 89 | AFVGD - ARBID | Object ID of the resource | ||
| 90 | AFVGD - ARBPL | Work center | ||
| 91 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 92 | AFVGD - FLG_LOE | Indicator: Operation is deleted | ||
| 93 | AFVGD - MLSTN | Usage | ||
| 94 | AFVGD - OBJNR | Object number | ||
| 95 | AFVGD - PROJN | Work breakdown structure element (WBS element) | ||
| 96 | AFVGD - SUMNR | Node number of the superior operation | ||
| 97 | AFVGD - VORNR | Operation/Activity Number | ||
| 98 | AFVGI - ARBID | Object ID of the resource | ||
| 99 | AFVGI - MLSTN | Usage | ||
| 100 | AFVGI - OBJNR | Object number | ||
| 101 | AFVGI - PROJN | Work breakdown structure element (WBS element) | ||
| 102 | AFVGI - SUMNR | Node number of the superior operation | ||
| 103 | AFVGI - VORNR | Operation/Activity Number | ||
| 104 | AFVKI - APLZL | General counter for order | ||
| 105 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 106 | ARKOPF - COMMENTS | Archiving Session Note | ||
| 107 | AUFK - AUFNR | Order Number | ||
| 108 | AUFK - AUTYP | Order category | ||
| 109 | AUFK - IDAT1 | Release date | ||
| 110 | AUFK - IDAT2 | Technical completion date | ||
| 111 | AUFK - IDAT3 | Close date | ||
| 112 | AUFK - LOEKZ | Deletion flag | ||
| 113 | AUFK - OBJNR | Object number | ||
| 114 | AUFK - PDAT1 | Planned release date | ||
| 115 | AUFK - PDAT2 | Planned completion date | ||
| 116 | AUFK - PDAT3 | Planned closing date | ||
| 117 | CNJ_STAT - OBJNR | Object number | ||
| 118 | COOPRINF - ARBPL | Work center | ||
| 119 | COOPRINF - FLG_LOE | Indicator: Operation is deleted | ||
| 120 | CRHH - NAME | Name of hierarchy | ||
| 121 | CRHH - WERKS | Plant | ||
| 122 | DFIES - FIELDNAME | Field Name | ||
| 123 | DFIES - SCRTEXT_L | Long Field Label | ||
| 124 | DFIES - TABNAME | Table Name | ||
| 125 | DRAD - DOKAR | Document Type | ||
| 126 | DRAD - DOKNR | Document number | ||
| 127 | DRAD - DOKOB | Linked SAP Object | ||
| 128 | DRAD - DOKTL | Document part | ||
| 129 | DRAD - DOKVR | Document version | ||
| 130 | DRAD - OBZAE | Counter key | ||
| 131 | DRAT - DKTXT | Document description | ||
| 132 | EVFD - EVOTY | Object type in progress analysis (PS) | ||
| 133 | FILTR - FLG_CRIT | Indicator: Activity is critical | ||
| 134 | FILTR - FLG_SUBCRT | Indicator: Activity is sub-critical | ||
| 135 | IMPR - GJAHR | Approval year of the investment program | ||
| 136 | IMPR - OBJNR | CO object number for inv. prog. position | ||
| 137 | IMPR - PARNR | Parent position number | ||
| 138 | IMPR - POSID | Identification for an investment program position | ||
| 139 | IMTP - GJAHR | Approval year of the investment program | ||
| 140 | IMTP - PRNAM | Investment program name | ||
| 141 | JESTD - ITX04 | Individual status of an object (short form) | ||
| 142 | KBED - APLZL | General counter for order | ||
| 143 | KBED - ARBID | Work center ID | ||
| 144 | KBED - AUFPL | Routing number of operations in the order | ||
| 145 | KBED - BEDID | ID of the capacity requirements record | ||
| 146 | KBED - BEDZL | Internal counter | ||
| 147 | KBED - CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | ||
| 148 | KBED - CANUMF | Counter for the main capacity requirements record | ||
| 149 | KBED - KAPID | Capacity ID | ||
| 150 | KBED - OBSTA | Object status (order status) | ||
| 151 | KBED01 - APLZL | General counter for order | ||
| 152 | KBED01 - ARBID | Work center ID | ||
| 153 | KBED01 - AUFPL | Routing number of operations in the order | ||
| 154 | KBED01 - BEDID | ID of the capacity requirements record | ||
| 155 | KBED01 - BEDZL | Internal counter | ||
| 156 | KBED01 - CANUM | Counters for cap. rqmts. records (various caps. + indiv.caps | ||
| 157 | KBED01 - CANUMF | Counter for the main capacity requirements record | ||
| 158 | KBED01 - KAPID | Capacity ID | ||
| 159 | KBED01 - OBSTA | Object status (order status) | ||
| 160 | KBEDI - APLZL | General counter for order | ||
| 161 | KBEDI - ARBID | Work center ID | ||
| 162 | KBEDI - AUFPL | Routing number of operations in the order | ||
| 163 | KBEDI - CANUMF | Counter for the main capacity requirements record | ||
| 164 | KBEDI - KAPID | Capacity ID | ||
| 165 | KBEDI - OBSTA | Object status (order status) | ||
| 166 | KKHIE - STUFE | CO-PC Hierarchy Level | ||
| 167 | MLST - APLZL | Internal counter | ||
| 168 | MLST - AUFPL | Routing number of operations in the order | ||
| 169 | MLST - LOEKZ | Deletion Indicator | ||
| 170 | MLST - PSPNR | WBS Element | ||
| 171 | MLST - ZAEHL | Internal counter | ||
| 172 | MLSTD - APLZL | Internal counter | ||
| 173 | MLSTD - AUFPL | Routing number of operations in the order | ||
| 174 | MLSTD - LOEKZ | Deletion Indicator | ||
| 175 | MLSTD - PSPNR | WBS Element | ||
| 176 | MLSTD - ZAEHL | Internal counter | ||
| 177 | MLST_INC - APLZL | Internal counter | ||
| 178 | MLST_INC - AUFPL | Routing number of operations in the order | ||
| 179 | MLST_INC - LOEKZ | Deletion Indicator | ||
| 180 | MLST_INC - PSPNR | WBS Element | ||
| 181 | PLAF - PLNUM | Planned order number | ||
| 182 | PLAF - PSPEL | WBS Element | ||
| 183 | PLMZ - ZUONR | No. for material comp. allocation to task list | ||
| 184 | PROJ - LOEVM | Deletion Indicator | ||
| 185 | PROJ - OBJNR | Object number | ||
| 186 | PROJ - PSPID | Project definition | ||
| 187 | PROJ - PSPNR | Current number for project or project item | ||
| 188 | PROJ - VBUKR | Company code for the project | ||
| 189 | PROJ - VERNA | Name of responsible person (Project manager) | ||
| 190 | PROJ - VERNR | Number of the responsible person (project manager) | ||
| 191 | PROJ - WERKS | Plant | ||
| 192 | PROJ2_INC - LOEVM | Deletion Indicator | ||
| 193 | PROJ2_INC - OBJNR | Object number | ||
| 194 | PROJ2_INC - VBUKR | Company code for the project | ||
| 195 | PROJ2_INC - VERNA | Name of responsible person (Project manager) | ||
| 196 | PROJ2_INC - VERNR | Number of the responsible person (project manager) | ||
| 197 | PROJ2_INC - WERKS | Plant | ||
| 198 | PROJ_INC - LOEVM | Deletion Indicator | ||
| 199 | PROJ_INC - OBJNR | Object number | ||
| 200 | PROJ_INC - PSPID | Project definition | ||
| 201 | PROJ_INC - VBUKR | Company code for the project | ||
| 202 | PROJ_INC - VERNA | Name of responsible person (Project manager) | ||
| 203 | PROJ_INC - VERNR | Number of the responsible person (project manager) | ||
| 204 | PROJ_INC - WERKS | Plant | ||
| 205 | PRPS - FKOKR | Controlling area of responsible cost center | ||
| 206 | PRPS - FKSTL | Responsible cost center | ||
| 207 | PRPS - LOEVM | Deletion Indicator | ||
| 208 | PRPS - OBJNR | Object number | ||
| 209 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 210 | PRPS - PSPHI | Current number of the appropriate project | ||
| 211 | PRPS - PSPNR | WBS Element | ||
| 212 | PRPS - PSPRI | Priority | ||
| 213 | PRPS - USR00 | 1st user field for 20 characters - WBS element- | ||
| 214 | PRPS - USR01 | 2nd user field 20 digits - WBS element | ||
| 215 | PRPS - USR02 | 3rd user-defined field 10 digits -WBS element | ||
| 216 | PRPS - USR03 | 4th user-defined field 10 digits -WBS element | ||
| 217 | PRPS - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | ||
| 218 | PRPS - USR05 | 2nd use field for quantity (length 10,3) WBS element | ||
| 219 | PRPS - USR06 | 1st user field for values (length 10,3) WBS element | ||
| 220 | PRPS - USR07 | 2nd user field for values (length 10,3) -WBS element | ||
| 221 | PRPS - USR08 | 1st user field for date -WBS element | ||
| 222 | PRPS - USR09 | 2nd user field for date -WBS element | ||
| 223 | PRPS - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | ||
| 224 | PRPS - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | ||
| 225 | PRPS2_INC - FKOKR | Controlling area of responsible cost center | ||
| 226 | PRPS2_INC - FKSTL | Responsible cost center | ||
| 227 | PRPS2_INC - LOEVM | Deletion Indicator | ||
| 228 | PRPS2_INC - PSPRI | Priority | ||
| 229 | PRPS2_INC - USR00 | 1st user field for 20 characters - WBS element- | ||
| 230 | PRPS2_INC - USR01 | 2nd user field 20 digits - WBS element | ||
| 231 | PRPS2_INC - USR02 | 3rd user-defined field 10 digits -WBS element | ||
| 232 | PRPS2_INC - USR03 | 4th user-defined field 10 digits -WBS element | ||
| 233 | PRPS2_INC - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | ||
| 234 | PRPS2_INC - USR05 | 2nd use field for quantity (length 10,3) WBS element | ||
| 235 | PRPS2_INC - USR06 | 1st user field for values (length 10,3) WBS element | ||
| 236 | PRPS2_INC - USR07 | 2nd user field for values (length 10,3) -WBS element | ||
| 237 | PRPS2_INC - USR08 | 1st user field for date -WBS element | ||
| 238 | PRPS2_INC - USR09 | 2nd user field for date -WBS element | ||
| 239 | PRPS2_INC - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | ||
| 240 | PRPS2_INC - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | ||
| 241 | PRPS_INC - FKOKR | Controlling area of responsible cost center | ||
| 242 | PRPS_INC - FKSTL | Responsible cost center | ||
| 243 | PRPS_INC - LOEVM | Deletion Indicator | ||
| 244 | PRPS_INC - OBJNR | Object number | ||
| 245 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 246 | PRPS_INC - PSPHI | Current number of the appropriate project | ||
| 247 | PRPS_INC - PSPRI | Priority | ||
| 248 | PRPS_INC - USR00 | 1st user field for 20 characters - WBS element- | ||
| 249 | PRPS_INC - USR01 | 2nd user field 20 digits - WBS element | ||
| 250 | PRPS_INC - USR02 | 3rd user-defined field 10 digits -WBS element | ||
| 251 | PRPS_INC - USR03 | 4th user-defined field 10 digits -WBS element | ||
| 252 | PRPS_INC - USR04 | 1st user-defined field for quantity(length 10,3) WBS element | ||
| 253 | PRPS_INC - USR05 | 2nd use field for quantity (length 10,3) WBS element | ||
| 254 | PRPS_INC - USR06 | 1st user field for values (length 10,3) WBS element | ||
| 255 | PRPS_INC - USR07 | 2nd user field for values (length 10,3) -WBS element | ||
| 256 | PRPS_INC - USR08 | 1st user field for date -WBS element | ||
| 257 | PRPS_INC - USR09 | 2nd user field for date -WBS element | ||
| 258 | PRPS_INC - USR10 | 1st user field for 'Ind. for evaluations' WBS elem. | ||
| 259 | PRPS_INC - USR11 | 2nd user field for 'Indicator for eval.s' WBS elemnt | ||
| 260 | PRPS_R - ABOVE | Number of the superior WBS element | ||
| 261 | PRPS_R - LEFT | Number of the left adjacent position in WBS | ||
| 262 | PRPS_R - LOEVM | Deletion Indicator | ||
| 263 | PRPS_R - OBJNR | Object number | ||
| 264 | PRPS_R - PSPHI | Current number of the appropriate project | ||
| 265 | PRPS_R - PSPNR | WBS Element | ||
| 266 | PSJ_VERSIONEN - AUFRUF | PSJ_VERSIONEN-AUFRUF | ||
| 267 | PSJ_VERSIONEN - VERSION | PSJ_VERSIONEN-VERSION | ||
| 268 | PSTX - PSTXTKY | Internal text number (12-character) | ||
| 269 | RC68H - LEVELS | Number of levels | ||
| 270 | RCJ_RPSCO_LIS - AUFERLPLAN | Current order revenue plan | ||
| 271 | RCJ_RPSCO_LIS - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 272 | RCJ_RPSCO_LIS - AUFKSTPLAN | Current order cost plan | ||
| 273 | RCJ_RPSCO_LIS - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 274 | RCJ_RPSCO_LIS - AUFTRANF | Residual order plan | ||
| 275 | RCJ_RPSCO_LIS - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 276 | RCJ_RPSCO_LIS - DEBFINPLN | Current cash budget, debit side | ||
| 277 | RCJ_RPSCO_LIS - DZHLNG | Total debit side payments (down payments and payments) | ||
| 278 | RCJ_RPSCO_LIS - FESTPROBL | Fixed price commitment | ||
| 279 | RCJ_RPSCO_LIS - FREIGABE | Release | ||
| 280 | RCJ_RPSCO_LIS - ISTERLOESE | Actual revenues | ||
| 281 | RCJ_RPSCO_LIS - ISTKOSTEN | Actual costs | ||
| 282 | RCJ_RPSCO_LIS - KREDFINPLN | Current financial budget, credit side | ||
| 283 | RCJ_RPSCO_LIS - KSTOBLGES | Total cost commitment | ||
| 284 | RCJ_RPSCO_LIS - KZHLNG | Total credit side payments (down payments and payments) | ||
| 285 | RCJ_RPSCO_LIS - PROERLPLAN | Current project revenue plan | ||
| 286 | RCJ_RPSCO_LIS - PROERLPLN2 | Project revenue plan (version 2) | ||
| 287 | RCJ_RPSCO_LIS - PROKSTPLAN | Current project cost plan | ||
| 288 | RCJ_RPSCO_LIS - PROKSTPLN2 | Project cost plan (version 2) | ||
| 289 | RCRKK - KAPAR | Capacity category | ||
| 290 | RESB - APLZL | Internal counter | ||
| 291 | RESB - AUFPL | Routing number of operations in the order | ||
| 292 | RESB - OBJNR | Object number | ||
| 293 | RESB - RSART | Record type | ||
| 294 | RESB - RSNUM | Number of reservation/dependent requirements | ||
| 295 | RESB - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 296 | RESB - XLOEK | Item is deleted | ||
| 297 | RESB - XWAOK | Goods movement for reservation allowed | ||
| 298 | RESB01 - APLZL | Internal counter | ||
| 299 | RESB01 - AUFPL | Routing number of operations in the order | ||
| 300 | RESB01 - OBJNR | Object number | ||
| 301 | RESB01 - XLOEK | Item is deleted | ||
| 302 | RESB01 - XWAOK | Goods movement for reservation allowed | ||
| 303 | RESBD - APLZL | Internal counter | ||
| 304 | RESBD - AUFPL | Routing number of operations in the order | ||
| 305 | RESBD - OBJNR | Object number | ||
| 306 | RESBD - XLOEK | Item is deleted | ||
| 307 | RESBD - XWAOK | Goods movement for reservation allowed | ||
| 308 | RKB1D - REPID | Report | ||
| 309 | RPSCO_LISC - AUFERLPLAN | Current order revenue plan | ||
| 310 | RPSCO_LISC - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 311 | RPSCO_LISC - AUFKSTPLAN | Current order cost plan | ||
| 312 | RPSCO_LISC - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 313 | RPSCO_LISC - AUFTRANF | Residual order plan | ||
| 314 | RPSCO_LISC - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 315 | RPSCO_LISC - DEBFINPLN | Current cash budget, debit side | ||
| 316 | RPSCO_LISC - DZHLNG | Total debit side payments (down payments and payments) | ||
| 317 | RPSCO_LISC - FESTPROBL | Fixed price commitment | ||
| 318 | RPSCO_LISC - FREIGABE | Release | ||
| 319 | RPSCO_LISC - ISTERLOESE | Actual revenues | ||
| 320 | RPSCO_LISC - ISTKOSTEN | Actual costs | ||
| 321 | RPSCO_LISC - KREDFINPLN | Current financial budget, credit side | ||
| 322 | RPSCO_LISC - KSTOBLGES | Total cost commitment | ||
| 323 | RPSCO_LISC - KZHLNG | Total credit side payments (down payments and payments) | ||
| 324 | RPSCO_LISC - PROERLPLAN | Current project revenue plan | ||
| 325 | RPSCO_LISC - PROERLPLN2 | Project revenue plan (version 2) | ||
| 326 | RPSCO_LISC - PROKSTPLAN | Current project cost plan | ||
| 327 | RPSCO_LISC - PROKSTPLN2 | Project cost plan (version 2) | ||
| 328 | RSPARAMS - SELNAME | ABAP/4: Name of SELECT-OPTION / PARAMETER | ||
| 329 | RSTHIE - ID | Internal: Node ID | ||
| 330 | SPSINFO_FC101 - DIFFERENZ | SPSINFO_FC101-DIFFERENZ | ||
| 331 | SPSINFO_FC101 - DIFFPROZ | SPSINFO_FC101-DIFFPROZ | ||
| 332 | SPSINFO_FC101 - VERSFELD | SPSINFO_FC101-VERSFELD | ||
| 333 | STRUCR - ABARBA | Percent of completion for work | ||
| 334 | STRUCR - ABARBD | Processing % of duration | ||
| 335 | STRUCR - ARNUMMER | Archiving Session Number | ||
| 336 | STRUCR - AUFERLPLAN | Current order revenue plan | ||
| 337 | STRUCR - AUFERLPLN2 | Order revenue plan (version 2) | ||
| 338 | STRUCR - AUFKSTPLAN | Current order cost plan | ||
| 339 | STRUCR - AUFKSTPLN2 | Order cost plan (version 2) | ||
| 340 | STRUCR - AUFTRANF | Residual order plan | ||
| 341 | STRUCR - BUDGET | Budget of a Measure (App. Request Variant Was Replaced) | ||
| 342 | STRUCR - DEBFINPLN | Current cash budget, debit side | ||
| 343 | STRUCR - DZHLNG | Total debit side payments (down payments and payments) | ||
| 344 | STRUCR - EARBEI | Work | ||
| 345 | STRUCR - ECKEN | Finish date (from basic dates) | ||
| 346 | STRUCR - ECKST | Basic start date | ||
| 347 | STRUCR - EDAUEH | Actual duration unit | ||
| 348 | STRUCR - EDAUER | Duration | ||
| 349 | STRUCR - FESTPROBL | Fixed price commitment | ||
| 350 | STRUCR - FREIGABE | Release | ||
| 351 | STRUCR - FRUEHER | Actual start is before earliest scheduled start | ||
| 352 | STRUCR - IARBEI | Actual work | ||
| 353 | STRUCR - IDAUEH | Actual duration unit | ||
| 354 | STRUCR - IDAUER | Actual duration | ||
| 355 | STRUCR - ISTEN | Actual finish date | ||
| 356 | STRUCR - ISTERLOESE | Actual revenues | ||
| 357 | STRUCR - ISTKOSTEN | Actual costs | ||
| 358 | STRUCR - ISTST | Actual start date | ||
| 359 | STRUCR - KREDFINPLN | Current financial budget, credit side | ||
| 360 | STRUCR - KSTOBLGES | Total cost commitment | ||
| 361 | STRUCR - KURZTEXT | Short text/description of the object | ||
| 362 | STRUCR - KZHLNG | Total credit side payments (down payments and payments) | ||
| 363 | STRUCR - OBJEKTID | ID/Object key | ||
| 364 | STRUCR - OBJEKTTYP | Object Type Text | ||
| 365 | STRUCR - PARBEI | Forecast work | ||
| 366 | STRUCR - PDAUEH | Actual duration unit | ||
| 367 | STRUCR - PDAUER | Forecast duration | ||
| 368 | STRUCR - PROERLPLAN | Current project revenue plan | ||
| 369 | STRUCR - PROERLPLN2 | Project revenue plan (version 2) | ||
| 370 | STRUCR - PROGEN | Forecast finish date | ||
| 371 | STRUCR - PROGST | Forecast start date | ||
| 372 | STRUCR - PROKSTPLAN | Current project cost plan | ||
| 373 | STRUCR - PROKSTPLN2 | Project cost plan (version 2) | ||
| 374 | STRUCR - RARBEI | Remaining work | ||
| 375 | STRUCR - RDAUER | Remaining duration | ||
| 376 | STRUCR - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 377 | STRUCR - TEENFR | Earliest scheduled finish (from basic dates) | ||
| 378 | STRUCR - TEENSP | Latest scheduled finish (from basic dates) | ||
| 379 | STRUCR - TESTFR | Earliest scheduled start (from basic dates) | ||
| 380 | STRUCR - TESTSP | Latest scheduled start (from basic dates) | ||
| 381 | STRUCR - TPENFR | Earliest scheduled finish (from forecast dates) | ||
| 382 | STRUCR - TPENSP | Latest scheduled finish (from forecast dates) | ||
| 383 | STRUCR - TPSTFR | Earliest scheduled start (from forecast dates) | ||
| 384 | STRUCR - TPSTSP | Latest scheduled start (from forecast dates) | ||
| 385 | STRUCR - VARBEI | Tentative work | ||
| 386 | STRUCR - VDAUER | Tentative duration | ||
| 387 | STRUCR - VERZUG | Duration After Latest Scheduled Finish | ||
| 388 | STRUCR - VORBEI | Duration After Earliest Scheduled Start | ||
| 389 | STRUCR - VORLEN | Tentative finish date | ||
| 390 | STRUCR - VORLST | Tentative start date | ||
| 391 | STRUCR - VSNUMMER | Number or description of a version | ||
| 392 | STRUCR_BEFORE_DATES - ARNUMMER | Archiving Session Number | ||
| 393 | STRUCR_BEFORE_DATES - KURZTEXT | Short text/description of the object | ||
| 394 | STRUCR_BEFORE_DATES - OBJEKTID | ID/Object key | ||
| 395 | STRUCR_BEFORE_DATES - OBJEKTTYP | Object Type Text | ||
| 396 | STRUCR_BEFORE_DATES - VSNUMMER | Number or description of a version | ||
| 397 | STRUCR_BEFORE_RPSCO - FRUEHER | Actual start is before earliest scheduled start | ||
| 398 | STRUCR_BEFORE_RPSCO - SPAETER | Actual Finish/Planned Finish After Latest Scheduled Finish | ||
| 399 | STRUCR_BEFORE_RPSCO - VERZUG | Duration After Latest Scheduled Finish | ||
| 400 | STRUCR_BEFORE_RPSCO - VORBEI | Duration After Earliest Scheduled Start | ||
| 401 | STRUCR_BEFORE_USER - ABARBA | Percent of completion for work | ||
| 402 | STRUCR_BEFORE_WORK - ABARBD | Processing % of duration | ||
| 403 | STRUCR_BEFORE_WORK - EDAUEH | Actual duration unit | ||
| 404 | STRUCR_BEFORE_WORK - EDAUER | Duration | ||
| 405 | STRUCR_BEFORE_WORK - IDAUEH | Actual duration unit | ||
| 406 | STRUCR_BEFORE_WORK - IDAUER | Actual duration | ||
| 407 | STRUCR_BEFORE_WORK - PDAUEH | Actual duration unit | ||
| 408 | STRUCR_BEFORE_WORK - PDAUER | Forecast duration | ||
| 409 | STRUCR_BEFORE_WORK - RDAUER | Remaining duration | ||
| 410 | STRUCR_BEFORE_WORK - VDAUER | Tentative duration | ||
| 411 | STRUCR_DATES - ECKEN | Finish date (from basic dates) | ||
| 412 | STRUCR_DATES - ECKST | Basic start date | ||
| 413 | STRUCR_DATES - ISTEN | Actual finish date | ||
| 414 | STRUCR_DATES - ISTST | Actual start date | ||
| 415 | STRUCR_DATES - PROGEN | Forecast finish date | ||
| 416 | STRUCR_DATES - PROGST | Forecast start date | ||
| 417 | STRUCR_DATES - TEENFR | Earliest scheduled finish (from basic dates) | ||
| 418 | STRUCR_DATES - TEENSP | Latest scheduled finish (from basic dates) | ||
| 419 | STRUCR_DATES - TESTFR | Earliest scheduled start (from basic dates) | ||
| 420 | STRUCR_DATES - TESTSP | Latest scheduled start (from basic dates) | ||
| 421 | STRUCR_DATES - TPENFR | Earliest scheduled finish (from forecast dates) | ||
| 422 | STRUCR_DATES - TPENSP | Latest scheduled finish (from forecast dates) | ||
| 423 | STRUCR_DATES - TPSTFR | Earliest scheduled start (from forecast dates) | ||
| 424 | STRUCR_DATES - TPSTSP | Latest scheduled start (from forecast dates) | ||
| 425 | STRUCR_DATES - VORLEN | Tentative finish date | ||
| 426 | STRUCR_DATES - VORLST | Tentative start date | ||
| 427 | STRUCR_WORK - EARBEI | Work | ||
| 428 | STRUCR_WORK - IARBEI | Actual work | ||
| 429 | STRUCR_WORK - PARBEI | Forecast work | ||
| 430 | STRUCR_WORK - RARBEI | Remaining work | ||
| 431 | STRUCR_WORK - VARBEI | Tentative work | ||
| 432 | SYST - DYNNR | ABAP System Field: Current Dynpro Number | ||
| 433 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 434 | T001W - FABKL | Factory calendar key | ||
| 435 | TCN04 - TXT40 | Description for PS text type (40 characters) | ||
| 436 | TCNT - PROFID | Project Info System overall profile | ||
| 437 | TKEB1 - REPID | Report | ||
| 438 | TLINE - TDLINE | Text Line | ||
| 439 | TWCOL - COLOR | Color in W interface | ||
| 440 | VBAK - OBJNR | Object number at header level | ||
| 441 | VSKOPF - VSAEDAT | Version change date | ||
| 442 | VSKOPF - VSGRUPPE | Group for a project version | ||
| 443 | VSKOPF - VSINACT | Version inactive indicator | ||
| 444 | VSKOPF - VSKAT | Project version category: status/time-dependent | ||
| 445 | VSKOPF - VSNMR | Number or description of a version | ||
| 446 | VSKOPF - VSTEXT | Version description |