Table list used by SAP ABAP Program COMCJGR1 (Common Part für die Transfertabellen)
SAP ABAP Program COMCJGR1 (Common Part für die Transfertabellen) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table | ABAP | ABAP/4 language-internal type declarations | |
2 | Table | ACT01 | Activity for LDB 01 | |
3 | Table | ACTR | Order Activity Structure for Project Reporting | |
4 | Table | AFAB | Network - Relationships | |
5 | Table | AFABE | Extract from AFAB, add. Index to Doc. Table and Graphic Type | |
6 | Table | AFVC | Operation within an order | |
7 | Table | AFVGD | Order: Dialog table for Table AFVG (order operation) | |
8 | Table | AFVV | DB structure of the quantities/dates/values in the operation | |
9 | Table | ALLOCDB | Document table structure for network allocation | |
10 | Table | BARC_SET | Bar chart settings | |
11 | Table | BCBOXES | Boxes in Gantt chart | |
12 | Table | BCCHART | Chart in Gantt chart | |
13 | Table | BCCOLUMN | Columns in Bar Chart | |
14 | Table | BCCURVE | Curves in the bar chart | |
15 | Table | BCCURVVALS | Attributes for curves in the bar chart | |
16 | Table | BCDELETE | Table for deleting objects from Gantt chart | |
17 | Table | BCDRGDRP | Drag & Drop in Bar Chart | |
18 | Table | BCLINKS | Links for Representing Linked Nodes | |
19 | Table | BCMEDNVALS | Node Attributes in the Bar Chart | |
20 | Table | BCMEDVALS | Attributes of Chart-Independent Objects in Gantt Chart | |
21 | Table | BCNODES | Gantt chart node | |
22 | Table | BCNVALS | Node Attributes in the Bar Chart | |
23 | Table | BCPOSITION | Positions (lines) of boxes and nodes in the Gantt chart | |
24 | Table | BCPROFILE | Graphics profile in the Gantt chart | |
25 | Table | BCROWWDT | Height of lines in bar chart | |
26 | Table | BCSECTION | Section of the time axis in Gantt chart | |
27 | Table | BCSHRTVALS | Attributes (Short) for Non-Chart-Specific Objs in Bar Chart | |
28 | Table | BCVALS | Attributes of Chart-Independent Objects in Gantt Chart | |
29 | Table | CAL_PR_KAL | Factory calendar ID and graphics calendar ID | |
30 | Table | CAUFVD | Dialog Structure for Order Headers and Items | |
31 | Table | CRHD | Work Center Header | |
32 | Table | CYCRPDATES | Structure with all date fields for capacity leveling | |
33 | Table | CYCRPTIPRO | Time profile for capacity leveling | |
34 | Table | DFIES | DD Interface: Table Fields for DDIF_FIELDINFO_GET | |
35 | Table | FIELDNAMES | Field Name | |
36 | Table | FIELD_ATTRIBUTES | Field Name | |
37 | Table | KAKO | Capacity Header Segment | |
38 | Table | MCS01 | Interface Structure for Func.Mod. MC_POPUP_TO_SELECT_FIELDS | |
39 | Table | MLSTD | Milestone I/O Table | |
40 | Table | NET_GRAPH | Parameters for graphics selection | |
41 | Table | OBJLIST_PS | Object List for Project and WBS Element | |
42 | Table | OPRAUTH | Network authorization fields | |
43 | Table | PRPS | WBS (Work Breakdown Structure) Element Master Data | |
44 | Table | PSIND_BAP | Hierarchy index graphic | |
45 | Table | RC27X | Auxiliary fields for list processing in routings | |
46 | Table | RCJ_ACTIND | Index structure - Activities | |
47 | Table | RCJ_AOIND | Index structure - Relationships (Gantt chart) | |
48 | Table | RCJ_BEZGZP | Definition of reference time points for areas of time axis | |
49 | Table | RCJ_MATIND | Index structure - Activities | |
50 | Table | RCJ_MSTIND | Index structure - Activities | |
51 | Table | RCJ_PS_PPT | All Objects in the Project Planning Board | |
52 | Table | RCJ_TITATT | Attributes which determine table and chart titles | |
53 | Table | RCJ_TRMKS | Selection bar: Set of dates with earliest/latest dates | |
54 | Table | RCJ_WBSIND | Index structure - WBS elements | |
55 | Table | RCJ_ZUORD | Assignments of activities to WBS elements | |
56 | Table | RCWBT | Screen Table for SAPLCJTR Module Pool | |
57 | Table | RPSCO_LIS | Project costs as LIS structure | |
58 | Table | RSSELDYN | Structure for FM RS_REFR_FROM_DYN_SEL | |
59 | Table | SGRCEXCLUD | Exclude Table for Function Code | |
60 | Table | T006 | Units of Measurement | |
61 | Table | T185 | Screen sequence control: Paths between processing locations | |
62 | Table | TBALK | Screen sequence control: paths between processing locations | |
63 | Table | TBCG | Graphics profile of bar chart | |
64 | Table | TBCO | Options in bar chart | |
65 | Table | TBP1C | Budget/Plan Profile | |
66 | Table | TC10 | Initial values for CIM screen sequence | |
67 | Table | TCBP | Gantt chart settings | |
68 | Table | TCBPF | Field Assignment PPB Structure -> DB Structure | |
69 | Table | TCNT | Project Information System: PS Info Profile | |
70 | Table | TCXPS | Control parameters for WBS scheduling | |
71 | Table | TCY33T | Text table for time profiles for capacity leveling | |
72 | Table | TCY49 | Control profile for capacity leveling | |
73 | Table | TCY49T | Texts for the control profiles for capacity leveling | |
74 | Table | V_TCY33 | Generated Table for View |