SAP ABAP Table PROFILCUST01_DB (iPPE: Profile for PS iPPE Interface (Cust.))
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷ LO-MD-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEPRO (Package) iPPE Objects in the Project System Connection
⤷ LO-MD-PPE (Application Component) Integrated Product and Process Engineering
⤷ CPPEPRO (Package) iPPE Objects in the Project System Connection
Basic Data
Table Category | INTTAB | Structure |
Structure | PROFILCUST01_DB | Table Relationship Diagram |
Short Description | iPPE: Profile for PS iPPE Interface (Cust.) |
Delivery and Maintenance
Pool/cluster | ||
Delivery Class | ||
Data Browser/Table View Maintenance | Display/Maintenance Allowed with Restrictions |
Components
Field | Key | Data Element | Domain | Data Type |
Length | Decimal Places |
Short Description | Check table |
|
---|---|---|---|---|---|---|---|---|---|
1 | MANDT | MANDT | MANDT | CLNT | 3 | 0 | Client | * | |
2 | PROFILE | PROFILE_PPE | PROFILE_IF | CHAR | 4 | 0 | Profile for BOM Transfer | * | |
3 | KTEXT | PROFI_TXT | TEXT40 | CHAR | 40 | 0 | Text for Profile | ||
4 | WERK | WERKS_D | WERKS | CHAR | 4 | 0 | Plant | * | |
5 | PSPNR_LOW | PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
6 | PSPNR_HIGH | PS_POSID | PS_POSID | CHAR | 24 | 0 | Work Breakdown Structure Element (WBS Element) | ||
7 | PSPID | PS_PSPID | PS_PSPID | CHAR | 24 | 0 | Project definition | ||
8 | NPLNR_HIGH | NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | * | |
9 | NPLNR_LOW | NW_AUFNR | AUFNR | CHAR | 12 | 0 | Network number | * | |
10 | MATNR | MATNR | MATNR | CHAR | 18 | 0 | Material Number | * | |
11 | CUOBJ | CUOBJ | CUOBJ | NUMC | 18 | 0 | Configuration (internal object number) | ||
12 | TECHS | TECHS | TECHS | CHAR | 12 | 0 | Parameter Variant/Standard Variant | ||
13 | FLG_RES | RES_FLG | XFELD | CHAR | 1 | 0 | iPPE PS: Indicator for Resource Transfer | ||
14 | FLG_PVS | PVS_FLG | XFELD | CHAR | 1 | 0 | iPPE P: Indicator for PVS Transfer | ||
15 | FLG_FOK | FOK_FLG | XFELD | CHAR | 1 | 0 | iPPE PS: Indicator for Focus Transfer | ||
16 | BDMNG | BDMNG | MENG13 | QUAN | 13 | 3 | Requirement Quantity | ||
17 | FLG_PRE | CN_FLG_PRE | XFELD | CHAR | 1 | 0 | In general generate preliminary requirements | ||
18 | FLG_EXT | EXT_SYST | XFELD | CHAR | 1 | 0 | Copy data from external systems via user exit | ||
19 | FLG_PROTOCOL | FLG_PROTO | XFELD | CHAR | 1 | 0 | Generate Log | ||
20 | AV_CHECK | CN_AVCHK | XFELD | CHAR | 1 | 0 | Availability check during save | ||
21 | DBOP | PVS_DBOP | PVS_VERBUCHER | CHAR | 1 | 0 | Update indicator | ||
22 | .INCLUDE | 0 | 0 | Effectivity fields | |||||
23 | DATE_LO | CC_DATE_LO | CC_DATUM | DATS | 8 | 0 | Date - lower limit | ||
24 | DATE_HI | CC_DATE_HI | CC_DATUM | DATS | 8 | 0 | Date - upper limit | ||
25 | DATE_OI | CC_DATE_OI | CC_XFELD | CHAR | 1 | 0 | Date - open interval | ||
26 | MATNR_LO | CC_MATNR_LO | CC_MATNR | CHAR | 18 | 0 | Material number - lower limit | ||
27 | SERNR_LO | CC_SERNR_LO | CC_GERNR | CHAR | 18 | 0 | Serial number - lower limit | ||
28 | SERNR_HI | CC_SERNR_HI | CC_GERNR | CHAR | 18 | 0 | Serial number - upper limit | ||
29 | PRODUCT_LO | CC_PRODUCTID_LO | CC_PRODUCTID | CHAR | 22 | 0 | Internal Number (GUID) for Product | ||
30 | CLASS_LO | KLASSE_D | KLASSE | CHAR | 18 | 0 | Class number | ||
31 | CLASSTY_LO | KLASSENART | KLASSENART | CHAR | 3 | 0 | Class Type | * | |
32 | PLANT_LO | CC_WERKS_D | CC_WERKS | CHAR | 4 | 0 | Plant | * | |
33 | STARTUP_LO | CC_STARTUP | CC_STARTUP | CHAR | 30 | 0 | Start-Up Parameters for Effectivity | ||
34 | LOCNO_LO | CC_LOCID_LO | CC_LOCID | CHAR | 22 | 0 | Internal location number (customer, supplier or plant) | ||
35 | .INCLUDE | 0 | 0 | Effectivity fields | |||||
36 | SERNR_OI | CC_SERNR_OI | CC_XFELD | CHAR | 1 | 0 | Serial number - indicator | ||
37 | .INCLUDE | 0 | 0 | ||||||
38 | AEFRS | CC_AEFRS | CC_XFELD | CHAR | 1 | 0 | Release for simulation | ||
39 | AEFRF | CC_AEFRF | CC_XFELD | CHAR | 1 | 0 | Release for production | ||
40 | AEFRP | CC_AEFRP | CC_XFELD | CHAR | 1 | 0 | Release for planning | ||
41 | AEFRK | CC_AEFRK | CC_XFELD | CHAR | 1 | 0 | Release for costing |
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C2 |