SAP ABAP Table BASELINE_DYNP_FIELDS2 (Structure for screen)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   LO-CM (Application Component) Configuration management
     CMT2 (Package) Configuration Management - Core Development - (Version2)
Basic Data
Table Category INTTAB    Structure 
Structure BASELINE_DYNP_FIELDS2   Table Relationship Diagram
Short Description Structure for screen    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 FOLDER_ID DE_CM_FOLDER_ID DO_CM_FOLDER_ID CHAR 40   0   Configuration folder  
2 LC_PHASE DE_CM_LIFE_CYCLE_PHASE DO_CM_LIFE_CYCLE_PHASE CHAR 5   0   Key for the life cycle phase *
3 BASELINE_ID DE_CM_BASELINE_ID DO_CM_BASELINE CHAR 30   0   Baseline  
4 REQUESTED_BY SYUNAME SYCHAR12 CHAR 12   0   User Name  
5 BL_CREATED_BY SYUNAME SYCHAR12 CHAR 12   0   User Name  
6 BL_DESCRIPTION DE_CM_DESCRIPTION DO_CM_DESCRIPTION CHAR 40   0   Description of a Configuration Management Object  
7 BL_STATUS DE_CM_STATUS DO_CM_STATUS CHAR 40   0   Status of a Configuration Management object  
8 CTRLD_MATNR MATNR MATNR CHAR 18   0   Material Number *
9 CTRLD_MATVR UDVERSION UDVERSION CHAR 2   0   Version  
10 CTRLD_DOKNR DOKNR DOKNR CHAR 25   0   Document number *
11 CTRLD_DOKAR DOKAR DOKAR CHAR 3   0   Document Type *
12 CTRLD_DOKVR DOKVR DOKVR CHAR 2   0   Document version  
13 CTRLDOBJECT_TYPE DE_CM_OBJ_TYPE DO_CM_OBJ_TYPE CHAR 15   0   Type of controlled object  
14 CTRLD_TEXT DE_CM_DESCRIPTION DO_CM_DESCRIPTION CHAR 40   0   Description of a Configuration Management Object  
15 BL_CREATED_AT_DATE DE_CM_CREABY_DATS DATUM DATS 8   0   Date on which a CM object was created  
16 BL_CREATED_AT_TIME DE_CM_CREABY_TIMS TIME TIMS 6   0   Time at which CM object was created  
17 REQUESTED_AT_DATE DE_CM_REQUBY_DATS DATUM DATS 8   0   Date on which a Baseline was requested  
18 REQUESTED_AT_TIME DE_CM_REQUBY_TIMS TIME TIMS 6   0   Date on which a Baseline was requested  
19 CLRLD_PSP_ELT PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
20 CTRLD_PRJ_DEF PS_PSPID PS_PSPID CHAR 24   0   Project definition  
21 LIFE_CYCLE DE_CM_LIFE_CYCLE DO_CM_LIFE_CYCLE CHAR 5   0   Key for the life cycle profile TCM_LIFECYCLE
22 BASELINE_DATE DE_CM_BASELINE_DATE DATS DATS 8   0   Baseline date  
23 PRODUCT_ID DE_CM_PRODUCT_ID DO_CM_PRODUCT_ID CHAR 40   0   Configuration definition *
24 BL_STRUCTURE_KEY DE_CM_OBJ_KEY DO_CM_OBJ_KEY CHAR 40   0   Controlled object  
25 BL_TEXT_KEY DE_CM_KEY DO_CM_KEY NUMC 10   0   CM: General key field  
26 LC_PH_TEXT DE_CM_LC_PHASE_TXT DO_CM_LIFECYCLE_TEXT CHAR 15   0   Life cycle phase  
27 LC_TEXT DE_CM_LIFE_CYCLE_TXT DO_CM_LIFECYCLE_TEXT CHAR 15   0   Life cycle profile  
28 BL_CUT_DATE_AT_DATE DE_CM_CUT_AT_DATS DATS DATS 8   0   Top date limit for the explosion  
29 BL_CUT_DATE_FROM_DATE DE_CM_CUT_FROM_DATS DATS DATS 8   0   Lower Limit for Explosion Date  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 BASELINE_DYNP_FIELDS2 LIFE_CYCLE TCM_LIFECYCLE LIFE_CYCLE    
History
Last changed by/on SAP  20130529 
SAP Release Created in 46C