SAP ABAP Message Class RU (Messages for order completion confirmation)
Basic Data
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CIC (Application Component) Interaction Center WinClient
⤷
CO (Package) R/3 Application development: PP Production orders
⤷
⤷
Attributes
| Message class | RU | |
| Short Description | Messages for order completion confirmation | |
| Changed On | 20131127 | |
| Last Changed At | 174354 |
Messages
| # | Message | Message Short Text | Documentation status | Authorization check |
|---|---|---|---|---|
| 1 | Enter confirmation number or order/sequence/operation/suboperation | Space: object requires documentation | ||
| 2 | Order & not found, check entry | |||
| 3 | Plant & not found, check entry | |||
| 4 | Material &1 not found in plant &2, check entry | |||
| 5 | Sequence &1 is not defined in order &2, check entry | |||
| 6 | Sequence &1 operation &2 not found in order &3, check entry | |||
| 7 | Confirmation no. &1 does not correspond to operation &2, check entry | |||
| 8 | No operations exist in order & | |||
| 9 | Order & contains no operations that can be confirmed | |||
| 10 | No parameters defined for plant &1 order type &2 | |||
| 11 | Operation &1 of sequence &2 does not require confirmation | |||
| 12 | Release operation &1 of sequence &2 | |||
| 13 | No confirmations can be made, order is not fully (or partially) released | |||
| 14 | Operation &1 of sequence &2 is already finally confirmed | |||
| 15 | & is after validity period of factory calendar, check date | |||
| 16 | & is before validity period of factory calendar, check date | |||
| 17 | Factory calendar not in buffer. Contact system administrator | |||
| 18 | Date & is invalid (check entry) | |||
| 19 | Posting date is in the past, check entry | |||
| 20 | Confirmation no. & not found, check entry | |||
| 21 | Confirmation no. &1 does not correspond to order &2, check entry | |||
| 22 | Confirmation no. &1 does not correspond to sequence &2, check entry | |||
| 23 | Select an operation | |||
| 24 | Preceding operation &1 of sequence &2 not yet confirmed | Space: object requires documentation | ||
| 25 | Operation &1 of sequence &2 externally processed, confirm via goods rcpt | |||
| 26 | Operation &1 of sequence &2 cannot be confirmed | |||
| 27 | Enter a date with the time | |||
| 28 | Two operation times are not in ascending order | |||
| 29 | According to factory calendar & (&) is not a workday (check entry) | Space: object requires documentation | ||
| 30 | Date &, time & is in the future | |||
| 31 | Check the new activities for work center & in plant & | |||
| 32 | Work center & does not exist in plant & (check your entry) | Space: object requires documentation | ||
| 33 | Confirmed activity must not be smaller than 0 (check entry) | |||
| 34 | Confirmed quantity must not be smaller than 0 (check entry) | |||
| 35 | Confirmed activity must not be greater than 0 (check entry) | |||
| 36 | Underdelivery not allowed for final confirmation (check entry) | |||
| 37 | Confirmed quantity is smaller than underdelivery tolerance | |||
| 38 | Confirmed quantity greater than overdelivery tolerance | |||
| 39 | Activities are recalculated due to quantity change (please note) | |||
| 40 | Personnel master record & not found (check entry) | |||
| 41 | Conf. no. & does not correspond to sub-operation & & (check entry) | |||
| 42 | Sequence & operation & sub-operation & not found in order & | |||
| 43 | Posting date must not be in the future | |||
| 44 | You have no authorization in plant & for order type & | |||
| 45 | Operation & sub-operation & of sequence & is externally processed | |||
| 46 | Operation & sub-operation & of sequence & must not be confirmed | |||
| 47 | Operation & sub-operation & of sequence & does not require confirmation | |||
| 48 | Function "summary confirmation" for op. & of seq. & not supported | Space: object requires documentation | ||
| 49 | Order & is already confirmed | |||
| 50 | The operation data must be transferred for the confirmation | |||
| 51 | Orders of the order type & cannot be confirmed | |||
| 52 | The order header data must be transferred for the confirmation | |||
| 53 | Standard confirmation is not possible for operation & sequence & | |||
| 54 | Operation & of sequence & does not require confirm./is not open | |||
| 55 | Operation & sub-operation & of sequence & does not require conf./not open | |||
| 56 | You have not authorization for plant & order type & | |||
| 57 | Order & is deleted (you cannot carry out confirmations) | |||
| 58 | Select a sub-operation | |||
| 59 | Enter a reason for scrap variance | |||
| 60 | Invalid reason & plant & (check entry) | |||
| 61 | Select line with confirmation | |||
| 62 | Confirmation & counter & is already cancelled | |||
| 63 | No sub-operations exist for operation & of sequence & | |||
| 64 | Order & has not yet been confirmed | |||
| 65 | Degree of processing must range from 0 to 100 (check entry) | The short text describes the object sufficiently | ||
| 66 | Sub-operation & is already manually confirmed | |||
| 67 | Sub-operation & is already finally confirmed | |||
| 68 | Sub-operation & is already confirmed by & percent | |||
| 69 | Enter a unit of measure for activity & | |||
| 70 | No plant sections exist for plant & | |||
| 71 | Wage type & is not valid for personnel number or plant | Space: object requires documentation | ||
| 72 | No confirmation has been carried out | |||
| 73 | Posting date & is earlier than release date & of the order | |||
| 74 | Date & is earlier than order release date & | |||
| 75 | Operation & of sequence & is already partially confirmed | |||
| 76 | Status management does not allow any confirmations | |||
| 77 | Alternative qty unit & cannot be converted into base unit & | |||
| 78 | Unit & cannot be converted into unit & | |||
| 79 | Record type & is not assigned to an activity | Space: object requires documentation | ||
| 80 | Total no. of confirmations transferred: & of which & incorrect | |||
| 81 | No confirmation data to be transferred from subsystem | |||
| 82 | Error in RECEIVE_TABLE: data transfer not possible | |||
| 83 | Error in RESPON_TABLE: data transfer was not confirmed | |||
| 84 | Order type & not found (check entry) | |||
| 85 | Error in determining actual costs for order & | |||
| 86 | Order & is already being processed | |||
| 87 | No actual costs for network & (check log) | |||
| 88 | Quuantities cannot be specified for sub-operations | |||
| 89 | Date & is in the future | |||
| 90 | No backflushed items found in need of posting | |||
| 91 | & goods movements have been successfully executed | |||
| 92 | For operation & sequence & only a summary confirmation is possible | |||
| 93 | The summary condfirmation does not cause an update | |||
| 94 | No text defined in language & for order type & | |||
| 95 | No text defined in language & plant & for reason & | |||
| 96 | Work center & is not defined for routing type & | |||
| 97 | No open operation requiring confirmation exists for order & | |||
| 98 | No sub-operation in sequence & operation & requires confirmation | |||
| 99 | Saving not necessary, data was not changed | |||
| 100 | Confirmation of order & saved | |||
| 101 | Confirmations are saved | |||
| 102 | No sub-operation can be confirmed in sequence & for operation & | |||
| 103 | Operation & is confirmed with the sub-operation | |||
| 104 | PDC error record of confirmation & is deleted | |||
| 105 | Confirmation of network & saved | |||
| 106 | You can only cancel one confirmation per operation and transaction | |||
| 107 | Confirmation of order & is cancelled | |||
| 108 | Confirmation of network & is cancelled | |||
| 109 | Confirmations saved (Goods movements: &, failed: &) | |||
| 110 | Confirmation saved (Goods movements: &, failed: &) | |||
| 111 | No open sub-operation allowing confirmation exists in sequ. & op. & | |||
| 112 | No open sub-operation requiring confirmation exists for seq. & op. & | |||
| 113 | No operation in order & is open and allows confirmation | |||
| 114 | No operation in order & requires confirmation | |||
| 115 | Please enter confirmation number | |||
| 116 | Several operations were identified as the last operation in order & | |||
| 117 | Total quantity confirmed not equal to planned quantity to be confirmed | |||
| 118 | & goods movements were entered as a background job | |||
| 119 | Error in material & order & item & | |||
| 120 | Activity & cannot be entered | |||
| 121 | Activity & is not defined (confirmation is not possible) | |||
| 122 | Confirmation & counter & does not exist (check entry) | |||
| 123 | You cannot cancel confirmation & counter & | |||
| 124 | You have no authorization for Transaction & | |||
| 125 | Order & is not released | |||
| 126 | Network & is not released | |||
| 127 | Conf. no. & does not belong to order & (check entry) | |||
| 128 | Last selected confirmation reached | |||
| 129 | First selected confirmation reached | |||
| 130 | Goods movement could not be posted in the background | Space: object requires documentation | ||
| 131 | Personnel master & does not exist in plant & (Check entries) | |||
| 132 | Material & not found in plant & (check entry) | |||
| 133 | Material & & is not handled in batches | |||
| 134 | Batch & & & & not found (check entry) | |||
| 135 | Storage location & not found for material & in plant & | |||
| 136 | Storage location & not yet created for material & | |||
| 137 | Structure explosion not possible for technical object in order & | |||
| 138 | Order & has no object reference | |||
| 139 | Overdelivery is not permitted (Check entry) | |||
| 140 | Position the cursor on a filled field | |||
| 141 | Goods movements redetermined due to quantity change | Space: object requires documentation | ||
| 142 | Confirmation triggered by milestone | |||
| 143 | Confirmation is part of milestone confirmation - Check goods movements | |||
| 144 | Confirmation is milestone confirmation - Check goods movements | |||
| 145 | Deviation of work is maintained, but not active -> please check | |||
| 146 | Deviation of duration is maintained, but not active -> please check | |||
| 147 | No goods movements were posted with the confirmation | |||
| 148 | Unit & does not exist -> check your entry | |||
| 149 | Dimensions differ between unit entered (&) and op. unit & | |||
| 150 | Save manually entered confirmations before saving standard confirmation | |||
| 151 | Enter order number | |||
| 152 | Error when assigning number for object & | Space: object requires documentation | ||
| 153 | Internal number assignment for object & (numbers are in critical area) | Space: object requires documentation | ||
| 154 | Internal number assignment for object (last number was assigned) | Space: object requires documentation | ||
| 155 | Confirmations were created at header level for order & | |||
| 156 | Confirmations have been entered at operation level for order & | |||
| 157 | Confirmation with counter & does not exist/has been cancelled | |||
| 158 | Internal no. assignment for error record document: No. in critical area | |||
| 159 | Internal assignment of doc. no. error record: last number assigned | |||
| 160 | You have reached the last selected operation | |||
| 161 | You have reached the first elected operation | |||
| 162 | The degree of processing is already & % | |||
| 163 | Number of confirmations saved for order &: & | |||
| 164 | & confirmations saved (goods movements: &, errors: &) | Space: object requires documentation | ||
| 165 | Operation without unit: unit & is copied into the operation | |||
| 166 | Error in number assignment for error document (goods movement) | |||
| 167 | Entering a final confirmation will set the remaining work to zero | |||
| 168 | Entry 'No remaining work': Entry is set to zero | |||
| 169 | Not enough data entered to select operation | |||
| 170 | You are not authorized to carry out a confirmation | |||
| 171 | Operation does not exist (check entry) | Space: object requires documentation | ||
| 172 | Operation cannot be selected due to parameter settings | |||
| 173 | Network & is deleted (you can no longer enter a confirmation) | Space: object requires documentation | ||
| 174 | Confirmation data are incorrect | Space: object requires documentation | ||
| 175 | Error document & & for material & is being processed | |||
| 176 | Confirmation does not exist or has been cancelled | |||
| 177 | You are not authorized to process work center & & | |||
| 178 | Invalid confirmation record class & | |||
| 179 | Mixed confirmation types (time ticket/time event) are not allowed | |||
| 180 | Sequence of time events not adhered to | |||
| 181 | Quantity deviation for GR items from inspection points | |||
| 182 | You can only process one pool per transaction | |||
| 183 | Enter either user or organizational unit | |||
| 184 | Enter organizational unit and type | |||
| 185 | Enter an agent | |||
| 186 | Select an operation with confirmation(s) | |||
| 187 | System: Wrong application | |||
| 188 | Individual capacity & / & does not exist (check entry) | Space: object requires documentation | ||
| 189 | Final confirmation exists for indiv. cap. &/& | |||
| 190 | Individual cap. &/& is already manually confirmed | |||
| 191 | Select an individual capacity | |||
| 192 | No individual capacities exist | |||
| 193 | Goods movements are posted on & | |||
| 194 | & PDC error records processed | |||
| 195 | Automatic goods receipt for order & is not possible | |||
| 196 | You have no authorization for order type & plant & | |||
| 197 | No. of confirmations saved: & | |||
| 198 | No error records exist for selection criteria specified | Space: object requires documentation | ||
| 199 | Confirmation was entered in a different application | |||
| 200 | ************************** N e t w o r k s ****************************** | |||
| 201 | Select a confirmation line | |||
| 202 | Start date is later than finish date - please check | |||
| 203 | Start time is later than finish time - check entry | |||
| 204 | Unit & is not a time unit - enter a time unit | |||
| 205 | Maintain a unit for the duration | |||
| 206 | Enter confirmation or network | |||
| 207 | Activity & not found in network & | |||
| 208 | Activity & element & not found in network & | |||
| 209 | Actual date(s) is in the future (check parameters) | |||
| 210 | Work is confirmed - maintain the work center | |||
| 211 | Enter either forecast finish or forecast duration | Space: object requires documentation | ||
| 212 | Network & contains no activities (check entry) | |||
| 213 | Select an operation | |||
| 214 | No (open) element found for activity & | |||
| 215 | Activity & does not require confirmation/is not open | |||
| 216 | Activity & element & does not require confirmation/is not open | |||
| 217 | You have maintained the actual work - please enter a unit of measure | |||
| 218 | Actual work + remaining work deviates by more than &% from planned work | |||
| 219 | Actual duration + remaining duration deviates by more than &% from schd. | |||
| 220 | No open activity exists for network & | |||
| 221 | Network & has not yet been confirmed | |||
| 222 | Internal error in processing of long text | |||
| 223 | Varying dimension for work units | |||
| 224 | Network & is already being processed | |||
| 225 | Unit & is invalid | |||
| 226 | Date & is before the end of factory calendar & | |||
| 227 | Date & is before the end of factory calendar & | |||
| 228 | Start date cannot be determined (calendar &) | |||
| 229 | You do not have the authorization for MRP group & in plant & | |||
| 230 | Actual/remaining work and degree of processing inconsistent | |||
| 231 | Final confirmation exists for network & | |||
| 232 | Network & has been confirmed at header level | |||
| 233 | Network & has been confirmed at activity level | |||
| 234 | Pool & does not exist | |||
| 235 | List does not contain selected confirmatios | |||
| 236 | &1 list entries were saved as pool &2 | Space: object requires documentation | ||
| 237 | Pool & has been deleted | |||
| 238 | Operation & cannot be confirmed | |||
| 239 | The new or changed confirmation was copied | |||
| 240 | The cancelled confirmation was copied | |||
| 241 | Pool & already exists | |||
| 242 | Confirmation pool &1 is already being processed by &2 | Space: object requires documentation | ||
| 243 | The pool of confirmations & cannot be locked | |||
| 244 | There are no entries in the confirmation pool | |||
| 245 | Select at least one confirmation line | |||
| 246 | Enter remaining activity or indicator FINISHED | |||
| 247 | Enter either remaining work or set the final confirmation indicator | |||
| 248 | Enter either degree of processing or set the final confirmation indicator | |||
| 249 | Check degree of processing and remaining work. | |||
| 250 | Actual work + remaining work exceeds planned work | |||
| 251 | Actual duration + remaining duration exceeds planned duration | |||
| 252 | Enter a unit of dimension TIME | |||
| 253 | You should enter a personnel number to call up time leveling | |||
| 254 | 100% of planned time already recorded - please check | |||
| 255 | No incorrect confirmations were found | |||
| 256 | Default values for user & deleted | |||
| 257 | Default values for user & changed | |||
| 258 | Default values for user & created | |||
| 259 | Default values for user & set | |||
| 260 | No user-dependent default values exist | |||
| 261 | Select a line with the personnel number | |||
| 262 | Select a line with a work center | |||
| 263 | Place the cursor on a field in the list | |||
| 264 | Internal error when sorting | |||
| 265 | You have not selected any columns yet | |||
| 266 | Capacity category and split number must be maintained together | |||
| 267 | Enter execute start and execute finish | |||
| 268 | No record was found for selection | Space: object requires documentation | ||
| 269 | & & & already in list - check remaining work | |||
| 270 | Formula &1 for calculating work contains division by zero! | Space: object requires documentation | ||
| 271 | No confirmation that could be processed was found for network & | Space: object requires documentation | ||
| 272 | Goods movements are redetermined because of status change | Space: object requires documentation | ||
| 273 | Confirmation cancelled, goods movement: &, incorrect: & | Space: object requires documentation | ||
| 274 | Please enter either actual start and actual finish or none of the fields | Space: object requires documentation | ||
| 275 | Phase/operation & secondary resource & in process order & does not exist | Space: object requires documentation | ||
| 276 | Phase/operation & in process order & does not exist (please check entry) | Space: object requires documentation | ||
| 277 | No error can be displayed for line selected | Space: object requires documentation | ||
| 278 | All incorrect confirmations in the system will be read | Space: object requires documentation | ||
| 279 | Select at least one confirmation | Space: object requires documentation | ||
| 280 | Select one confirmation only | Space: object requires documentation | ||
| 281 | At least one confirmation was not checked | Space: object requires documentation | ||
| 282 | Changes cannot be transferred | Space: object requires documentation | ||
| 283 | Operation &1 in order &2 does not exist | Space: object requires documentation | ||
| 284 | Operation &1 suboperation &2 in order &3 do not exist | Space: object requires documentation | ||
| 285 | Order cannot be displayed | Space: object requires documentation | ||
| 286 | &1 confirmations can be saved without errors | Space: object requires documentation | ||
| 287 | No remaining duration/forecast finish possible for final confirmation | Space: object requires documentation | ||
| 288 | Confirmation only possible after saving | Space: object requires documentation | ||
| 289 | Goods movements retermined because of date change | Space: object requires documentation | ||
| 290 | Activity type missing - confirmation will be saved without actual costs | Space: object requires documentation | ||
| 291 | You are not authorized to carry out mass cancellation of confirmations | The short text describes the object sufficiently | ||
| 292 | Forecast work of operation exceeds maximum work | The short text describes the object sufficiently | ||
| 293 | Actual work exceeds maximum work | The short text describes the object sufficiently | ||
| 294 | Remaining work exceeds maximum work | The short text describes the object sufficiently | ||
| 295 | Confirmation saved, goods movements: &, deliveries: &, faulty: & | Space: object requires documentation | ||
| 296 | & goods movements and & deliveries carried out successfully | The short text describes the object sufficiently | ||
| 297 | ************************** PM - Order ******************************** | The short text describes the object sufficiently | ||
| 298 | Controlling area of work center (&) differs from order (&) | |||
| 299 | The cursor should not be on an empty line | |||
| 300 | Enter a plant for the work center | |||
| 301 | Only &2 decimal places are permitted for unit of measure &1 | Space: object requires documentation | ||
| 302 | Select a line in the data entry section | Space: object requires documentation | ||
| 303 | On entering a techn. object the other entries are ignored | Space: object requires documentation | ||
| 304 | No standing order could be calculated for a techn. object | Space: object requires documentation | ||
| 305 | No standing order was selected | Space: object requires documentation | ||
| 306 | Select a line with the standing order | Space: object requires documentation | ||
| 307 | No standing order is assigned to the functional location | Space: object requires documentation | ||
| 308 | No standing order is assigned to equipment & | Space: object requires documentation | ||
| 309 | Value help activity type: Enter plant, work center, posting date | Space: object requires documentation | ||
| 310 | Actual or planned work center is adopted from operation/operation element | Space: object requires documentation | ||
| 311 | Activity type filled - maintain workplace also | Space: object requires documentation | ||
| 312 | Service type copied from work center | The short text describes the object sufficiently | ||
| 313 | ************************P D C - A N A L Y S I S************************** | |||
| 314 | There are no subsystem confirmations | |||
| 315 | Record type & is not supported | |||
| 316 | The time event was already reported | |||
| 317 | Error when deleting confirmations from table RUECK, RC = & | |||
| 318 | No authorization for HR pair formation | |||
| 319 | Pair formation: Conflict with subsequent confirmation | |||
| 320 | Pair formation: Conflict with previous confirmation | Space: object requires documentation | ||
| 321 | Pair formation: Start confirmation is missing | |||
| 322 | Time determination: Work center & does not exist in plant & | |||
| 323 | Time determination: Capacity type & not defined for work center & | Space: object requires documentation | ||
| 324 | Actual time determination: SI unit is missing | Space: object requires documentation | ||
| 325 | Processing mode & is not supported | |||
| 326 | Error when reading order data (CO_RU_CONFIRMATION_PREPARE) | |||
| 327 | Error when checking confirmation data (CO_RU_CONFIRMATION_CHECK) | |||
| 328 | Error in number assignment for number range object PD_SEQ_NR | |||
| 329 | Error in HR plausibility check (HR_EVENT_CHECK) | |||
| 330 | Error when creating document records (CO_RU_CONFIRMATION_ADD) | |||
| 331 | Error when starting with buffer table, RC = &1 | Space: object requires documentation | ||
| 332 | Error when updating document records | |||
| 333 | Error when cancelling the original confirmation (Table TEVEN) | |||
| 334 | Application indicator is missing or has the wrong value | |||
| 335 | Error when creating cancellation (Table PDSNR) | |||
| 336 | Error when creating time event (Table TEVEN) | |||
| 337 | Error when creating time event (Table PDSNR) | |||
| 338 | Previous order & is not yet confirmed | |||
| 339 | Goods receipt items cannot be entered | Space: object requires documentation | ||
| 340 | Highlighted items need to be processed | Space: object requires documentation | ||
| 341 | Posting period & & is locked (check posting date) | Space: object requires documentation | ||
| 342 | Adhere to sequence when canceling time events | Space: object requires documentation | ||
| 343 | Actual data for QM characteristics of operation & missing | |||
| 344 | Actual data for QM characteristics of sub-operation & & are missing | |||
| 345 | & selected error records cannot be processed | |||
| 346 | Invalid PDC communication channel & | Space: object requires documentation | ||
| 347 | Quantities are not permitted for error handling operations | |||
| 348 | The time event contains no confirmation data | |||
| 349 | The time event record time is not supported | |||
| 350 | No confirmations were transferred | |||
| 351 | Errors in PD processing, RC = | |||
| 352 | Storage location &1 does not exist | Space: object requires documentation | ||
| 353 | Error in actual time determination | |||
| 354 | Saving not necessary - no confirmations were created | |||
| 355 | Up until now only & & confirmed for predecessors & / & | |||
| 356 | Up until now only & & confirmed for preceding operation & | |||
| 357 | Incorrect split quantity (check entry) | |||
| 358 | You can only charge off in connection with final confirmation | |||
| 359 | Transaction was cancelled, confirmation was not saved | |||
| 360 | A serial number must be assigned to material & in plant & | |||
| 361 | Identification number & and personnel number & are not compatible | |||
| 362 | Enter personnel number or number of time recording ID card | |||
| 363 | Personnel no. or no. of time recording ID card cannot be entered | |||
| 364 | No error in actual cost calculation for order & | Space: object requires documentation | ||
| 365 | Error in goods movements | |||
| 366 | System error: At least one quantity field contains negative values | |||
| 367 | & items cannot be processed | |||
| 368 | No resource for parallel process exists | |||
| 369 | Service & cannot be created manually | Space: object requires documentation | ||
| 370 | Operation & for order & has been confirmed | Space: object requires documentation | ||
| 371 | Quantity to be confirmed is less than the quantity confirmed up to now | Space: object requires documentation | ||
| 372 | Operation & in sequence & cannot be confirmed by progress confirmation | Space: object requires documentation | ||
| 373 | Milestone operation &1 of sequence &2 in order &3 not yet confirmed | Space: object requires documentation | ||
| 374 | Selected operation & in sequence & is a milestone operation! | Space: object requires documentation | ||
| 375 | Process control & is not defined for order category & | Space: object requires documentation | ||
| 376 | No error record was found for selection | Space: object requires documentation | ||
| 377 | & confirmations are processed by other users | Space: object requires documentation | ||
| 378 | Previous operation already finally confirmed | Space: object requires documentation | ||
| 379 | Operation & in sequence & cannot be confirmed by progress confirmation | Space: object requires documentation | ||
| 380 | Subordinate order in collective order is already finally confirmed | Space: object requires documentation | ||
| 381 | Confirmation procedure & is already active | Space: object requires documentation | ||
| 382 | HR data transfer already active! | Space: object requires documentation | ||
| 383 | All changes have been saved | Space: object requires documentation | ||
| 384 | Item is not allowed | Space: object requires documentation | ||
| 385 | Changes are not written to a transport request | Space: object requires documentation | ||
| 386 | Transfer & KANBAN control cycles to ALE | Space: object requires documentation | ||
| 387 | Transfer & KANBAN containers to ALE | Space: object requires documentation | ||
| 388 | Transfer & KANBAN container status to ALE | Space: object requires documentation | ||
| 389 | No operations were selected | Space: object requires documentation | ||
| 390 | Transfer & operations to ALE | Space: object requires documentation | ||
| 391 | No subsystem groupings were maintained | Space: object requires documentation | ||
| 392 | No work centers relevant to subsystems were selected | Space: object requires documentation | ||
| 393 | No PDC-related order types defined | Space: object requires documentation | ||
| 394 | Transfer & operations and & labor-related records to ALE | Space: object requires documentation | ||
| 395 | Transfer & work centers to ALE | Space: object requires documentation | ||
| 396 | Transfer & variances to ALE | Space: object requires documentation | ||
| 397 | Transfer & units of measure to ALE | Space: object requires documentation | ||
| 398 | Transfer & activity types to ALE | Space: object requires documentation | ||
| 399 | Transfer & plants to ALE | Space: object requires documentation | ||
| 400 | Transfer & order statuses to ALE | Space: object requires documentation | ||
| 401 | Transfer & material dependent units of measure to ALE | Space: object requires documentation | ||
| 402 | Error when calling up rounding routine with unit & | Space: object requires documentation | ||
| 403 | Problems in parallel processing of a confirmation process | Space: object requires documentation | ||
| 404 | Account number of supplier or creditor & does not exist | Space: object requires documentation | ||
| 405 | "Max. selected GM" with incorrect GMs can lead to problems | Space: object requires documentation | ||
| 406 | Invalid entry: Job repetition can lead to infinite loop | Space: object requires documentation | ||
| 407 | Order & closed | Space: object requires documentation | ||
| 408 | Network & has been completed | Space: object requires documentation | ||
| 409 | Withdrawal posting to batch totals record is not possible | Space: object requires documentation | ||
| 410 | No control parameters were defined for application & | Space: object requires documentation | ||
| 411 | No goods movements can be entered for the sub-operation | Space: object requires documentation | ||
| 412 | No quantities can be confirmed for the sub-operation | Space: object requires documentation | ||
| 413 | System error when writing error pool | Space: object requires documentation | ||
| 414 | Enter a search string | |||
| 415 | Only the first 100 entries were found | |||
| 416 | No entries found | |||
| 417 | No authorization for & selected orders | Space: object requires documentation | ||
| 418 | &1 confirmations are incorrect. For details see parameter DETAIL_RETURN | Space: object requires documentation | ||
| 419 | Work center is missing for order &1 sequence &2 operation &3 | Space: object requires documentation | ||
| 420 | & goods movements could not be processed | Space: object requires documentation | ||
| 421 | The chosen function is not available in repetitive manufacturing | Space: object requires documentation | ||
| 422 | No business process has been defined for operation or work center | Space: object requires documentation | ||
| 423 | A confirmation function can only be executed in dialog mode | Space: object requires documentation | ||
| 424 | Confirmation & with counter & does not exist | Space: object requires documentation | ||
| 425 | &1 entries were deleted | Space: object requires documentation | ||
| 426 | &1 confirmations were executed | Space: object requires documentation | ||
| 427 | No confirmations could be executed | Space: object requires documentation | ||
| 428 | Error in the assignment of activities to work center &1/&2 | Space: object requires documentation | ||
| 429 | &1 planned confirmations have been saved | Space: object requires documentation | ||
| 430 | Logical system &1 is incorrect | Space: object requires documentation | ||
| 431 | No order number was entered for operation & | Space: object requires documentation | ||
| 432 | No operation number was entered for order & | Space: object requires documentation | ||
| 433 | Pair formation: End message for start time &1 &2 is missing | Space: object requires documentation | ||
| 434 | Only &1 &2 for previous operation &3 from order &4 has been confirmed | Space: object requires documentation | ||
| 435 | Underdelivery found on posting predecessor | Space: object requires documentation | ||
| 436 | Dependent goods movement was incorrect | Space: object requires documentation | ||
| 437 | Confirmation &1 / &2 is already processed | Space: object requires documentation | ||
| 438 | Line &: Confirmed quantity is smaller than underdelivery tolerance | Space: object requires documentation | ||
| 439 | Line &: Total confirmed qty does not equal planned qty to be confirmed | Space: object requires documentation | ||
| 440 | Line &1: Preceding operation &2 has not been confirmed yet | Space: object requires documentation | ||
| 441 | Line &1: Only &2 for predecessor &3 / &4 has been confirmed | Space: object requires documentation | ||
| 442 | No production orders can be selected for the selection condition | Space: object requires documentation | ||
| 443 | Entering quantities is not allowed for the entered time event | Space: object requires documentation | ||
| 444 | Confirmation with external key &1 not found | Space: object requires documentation | ||
| 445 | Confirmation cannot be successfully saved | Space: object requires documentation | ||
| 446 | &1 is already activated | Space: object requires documentation | ||
| 447 | PP-PDC: A problem occurred when creating IDOCs | Space: object requires documentation | ||
| 448 | Order split for order &1 has been executed | Space: object requires documentation | ||
| 449 | Progress confirmation not possible for rework operation | Space: object requires documentation | ||
| 450 | Additional sub-operations/secondary resources are open | Space: object requires documentation | ||
| 451 | You must first manually page through to check all entries. | Space: object requires documentation | ||
| 452 | Data cannot be filtered in the delta download | Space: object requires documentation | ||
| 453 | Confirmation terminated due to incorrect actual costs | Space: object requires documentation | ||
| 454 | Confirmation terminated due to incorrect goods movements | Space: object requires documentation | ||
| 455 | Termination flag. Actual costs only in connection with actual costs log | Space: object requires documentation | ||
| 456 | Termination flag. Goods movement only in connection with goods move. log | Space: object requires documentation | ||
| 457 | Problems during parallel processing of the download | Space: object requires documentation | ||
| 458 | Task &1 with error: &2 | Space: object requires documentation | ||
| 459 | Changing the movement type from goods receipt to goods issue not allowed | Space: object requires documentation | ||
| 460 | A lock was set for work center & plant & | Space: object requires documentation | ||
| 461 | A deletion flag was set for work center & in plant & | Space: object requires documentation | ||
| 462 | Division through zero: Operation quantity of milestone operation is zero | Space: object requires documentation | ||
| 463 | Division through zero: Gross header quantity of order & is zero | Space: object requires documentation | ||
| 464 | Requirements quantity from batch totals records not taken into account | Space: object requires documentation | ||
| 465 | Operation &1 is selected as an added operation | Space: object requires documentation | ||
| 466 | Order &1 is selected as an added order | Space: object requires documentation | ||
| 467 | Overview contains plus/minus components from engineering change mgmt | Space: object requires documentation | ||
| 468 | HR data transfer executed, now refresh the list | The short text describes the object sufficiently | ||
| 469 | &1 actual costs are intended for background processing | The short text describes the object sufficiently | ||
| 470 | All HR future change records will be posted | Space: object requires documentation | ||
| 471 | WIP batch functionality not active | Space: object requires documentation | ||
| 472 | No operation could be confirmed for order & | Space: object requires documentation | ||
| 473 | No phase could be confirmed for order & | Space: object requires documentation | ||
| 474 | It was not possible to assign batch characteristics to any goods movement | Space: object requires documentation | ||
| 475 | Error when classifying a goods receipt batch | Space: object requires documentation | ||
| 476 | SFC &1 has already been confirmed (mile stone confirmation &2 &3) | The short text describes the object sufficiently | ||
| 477 | Enter permitted origin (2 (PP) or 6 (PP-PI)) | The short text describes the object sufficiently | ||
| 478 | ************************ Single screen entry **************************** | Space: object requires documentation | ||
| 479 | User settings were saved | Space: object requires documentation | ||
| 480 | User settings could not be saved | Space: object requires documentation | ||
| 481 | User interface predefined, because there is no definition in Customizing | Space: object requires documentation | ||
| 482 | No header area exists | Space: object requires documentation | ||
| 483 | Enter a profile | Space: object requires documentation | ||
| 484 | Profile &1 &2 reprocessing indicator does not exist | Space: object requires documentation | ||
| 485 | Field &1 contained in area &2 and &3 | Space: object requires documentation | ||
| 486 | 'Clear' indicator removed, because this is not possible for part.confirm. | Space: object requires documentation | ||
| 487 | Profile &1 is already defined as the standard profile | Space: object requires documentation | ||
| 488 | Before saving enter confirmation number or order/sequence/operation | Space: object requires documentation | ||
| 489 | First enter confirmation number or order/sequence/operation | Space: object requires documentation | ||
| 490 | Actual data cannot be proposed for a sub-operation | Space: object requires documentation | ||
| 491 | Profile &1 has already been created | Space: object requires documentation | ||
| 492 | User settings could not be deleted | Space: object requires documentation | ||
| 493 | User settings have been deleted | Space: object requires documentation | ||
| 494 | Select a language | Space: object requires documentation | ||
| 495 | Customer enhancement is not yet active | Space: object requires documentation | ||
| 496 | Confirmation profile used: &1 | Space: object requires documentation | ||
| 497 | Detail area in area &1 and area &2 selected twice | Space: object requires documentation | ||
| 498 | Attention: Transferred goods movements are not adjusted! | Space: object requires documentation | ||
| 499 | Enter confirmation number or order/sequence/phase/secondary resource | The short text describes the object sufficiently | ||
| 500 | Enter confirmation number or order/sequence/phase before saving | Space: object requires documentation | ||
| 501 | First enter confirmation number of order/sequence/phase | The short text describes the object sufficiently | ||
| 502 | Check of detail areas without errors | The short text describes the object sufficiently | ||
| 503 | Order not suitable for transaction &2; F4 help not possible | Space: object requires documentation | ||
| 504 | Quantity layout &1 does not exist | The short text describes the object sufficiently | ||
| 505 | Enter a shift grouping | The short text describes the object sufficiently | ||
| 506 | Enter a quantity layout | The short text describes the object sufficiently | ||
| 507 | Enter a proposal type for determination of the shift group | The short text describes the object sufficiently | ||
| 508 | Enter a proposal type for determination of a quantity layout | The short text describes the object sufficiently | ||
| 509 | Enter a proposal type to show customer fields | The short text describes the object sufficiently | ||
| 510 | Not possible to save confirmation (Choose Enter) | Space: object requires documentation | ||
| 511 | Detail area WIP batch not selectable (Customizing not active) | Space: object requires documentation | ||
| 512 | No entry exists for transaction & in table T158 | |||
| 513 | Entries for transaction & are missing in table T158B | |||
| 514 | An application for posting goods movements is already active | Space: object requires documentation | ||
| 515 | Set one indicator for the time unit proposal | |||
| 516 | Future change records for background processing exist for order & | Space: object requires documentation | ||
| 517 | Future change records for background processing exist for order & | Space: object requires documentation | ||
| 518 | Enter just one indicator for the screen control | |||
| 519 | Scrap for order &1 in plant &2 must not be confirmed | Space: object requires documentation | ||
| 520 | **** Messages for ALV Grids in Reprocessing Transactions **** | The short text describes the object sufficiently | ||
| 521 | All confirmations are being read - limit selection | The short text describes the object sufficiently | ||
| 522 | Select at least one option | Space: object requires documentation | ||
| 523 | No postprocessing records found | The short text describes the object sufficiently | ||
| 524 | Overview was updated | The short text describes the object sufficiently | ||
| 525 | Future chnge rec. does not come from a confirmation, display not possible | Space: object requires documentation | ||
| 526 | Future change rec. comes from repetitive manufact.; display not possible | The short text describes the object sufficiently | ||
| 527 | Select at least one goods movement | The short text describes the object sufficiently | ||
| 528 | Select one goods movement only | The short text describes the object sufficiently | ||
| 529 | Deletion flag is active, therefore this function is not possible | The short text describes the object sufficiently | ||
| 530 | Detail display is only available for preselected goods movements | Space: object requires documentation | ||
| 531 | No goods movements were determined for the selected objects | The short text describes the object sufficiently | ||
| 532 | Error records does not originate from a confirmation, no display possible | Space: object requires documentation | ||
| 533 | Storage location could not be changed for all selected entries | The short text describes the object sufficiently | ||
| 534 | Choose one selection option | |||
| 535 | Choose a valid line | |||
| 536 | Choose one parameter | |||
| 537 | Termin.: DELETE Tab. &: Of & records, & records have been updated | |||
| 538 | Termin.: INSERT Tab. &: Of & records, & records have been updated | |||
| 539 | Termin.: UPDATE Tab. &: Of & records, & records have been updated | |||
| 540 | Invalid call of a method for confirmation | Space: object requires documentation | ||
| 541 | DELETE Table &: & records posted successfully from & records | The short text describes the object sufficiently | ||
| 542 | INSERT table &: & records posted successfully from & records | The short text describes the object sufficiently | ||
| 543 | CHANGE table &: & records posted successfully from & records | The short text describes the object sufficiently | ||
| 544 | Terminated because of error in SAP enhancement & | Space: object requires documentation | ||
| 545 | *** System message: & | |||
| 546 | *** System Message: & & & & | The short text describes the object sufficiently | ||
| 547 | Confirmation is posted twice for & &; SUBRC = & | Space: object requires documentation | ||
| 548 | Conversion program finished: no conversion of status 'withdrawal failed' | Space: object requires documentation | ||
| 549 | & System status 'withdrawal failed' converted successfully | Space: object requires documentation |
History
| Last changed on/by | 20131127 | SAP | |
| SAP Release Created in |