SAP ABAP Message Class KV (Variance Analysis for Cost Centers and Cost Objects)
Basic Data
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KV (Package) Variance analysis RK-S/RK-K
Attributes
Message class KV
Short Description Variance Analysis for Cost Centers and Cost Objects  
Changed On 19950815 
Last Changed At 115536 
Messages
# Message Message Short Text Documentation status Authorization check
1 000 ************** General (001-149) ****************************************  
2 001 Controlling area & does not exist  
3 002 Fiscal year variant & does not exist. Check the assignment  
4 003 No authorization for & & in controlling area & Space: object requires documentation
5 004 No authorization for &, & in controlling area &  
6 005 Enter an order number  
7 006 Processing will be carried out across plants  
8 007 No target cost versions selected  
9 008 Order number & does not exist. Check your entry  
10 009 Order & & was already selected  
11 010 No worklist found  
12 011 Order does not have status DLV or TECO  
13 012 First select the required orders and target cost versions Space: object requires documentation
14 013 Worklist is switched on  
15 014 Worklist is switched off  
16 015 & orders (items) processed. & of these had errors Space: object requires documentation
17 016 & orders (items) processed. One of these had errors Space: object requires documentation
18 017 No orders (order items) could be processed Space: object requires documentation
19 018 Enter at least one target cost version Space: object requires documentation
20 019 The versions you selected were transferred  
21 020 Version & was transferred  
22 021 Messages saved under document number & Space: object requires documentation
23 022 No messages found under the number & Space: object requires documentation
24 023 Product cost collectors are always processed by period Space: object requires documentation
25 024 Final delivery period is before data entry period  
26 025 Period entered is in the future  
27 026 Order type & does not exist. Check your entry  
28 027 Order type & not available. Check your entry  
29 028 Data records are being processed by &  
30 029 System error when locking the data records  
31 030 Incorrect entry for locking data records  
32 031 No target cost versions exist in controlling area &  
33 032 Controlling area: &. Company code currency differs  
34 033 Plant & does not exist. Check your entry  
35 034 Tgt cost version &: No plan costs in period &, fiscal year &  
36 035 Target cost version & not defined. Check your entry  
37 036 Variance key & not defined  
38 037 No messages found Space: object requires documentation
39 038 Variance variant & not allowed  
40 039 & orders (items) processed. No errors in scrap calculation Space: object requires documentation
41 040 One order (item) processed. No errors in variance calculation Space: object requires documentation
42 041 One order (item) processed. Errors during variance calculation Space: object requires documentation
43 042 & orders (items) processed. No errors in variance calculation Space: object requires documentation
44 043 One order (item) processed Space: object requires documentation
45 044 & orders (items) processed Space: object requires documentation
46 045 No messages were issued Space: object requires documentation
47 046 Specify run schedule header or material/plant/production version  
48 047 Specify material, plant, and production process Space: object requires documentation
49 048 One order (item) processed. No errors in scrap calculation Space: object requires documentation
50 049 Material & does not exist  
51 050 Production version & for material & & does not exist  
52 051 No material master record selected  
53 052 Saving material master records Space: object requires documentation
54 053 Material master records not changed  
55 054 Fiscal year & is invalid  
56 055 One order (item) processed. Errors in scrap calculation Space: object requires documentation
57 056 Object type & is not allowed  
58 057 No global settings made for repetitive mfg  
59 058 There is no text for status & in language &  
60 059 Posting period & is not allowed  
61 060 No variance calculation possible for order type &  
62 061 No scrap calculation possible for order type &  
63 062 Variance key & does not allow variance calculation  
64 063 Variance key & does not allow scrap calculation  
65 064 Variance key &: scrap is calculated through variances  
66 065 Processing with administration record active  
67 066 Processing with administration record inactive  
68 067 No administration records found  
69 068 Display of processing progress is switched on  
70 069 Display of processing progress is switched off  
71 070 & control record(s) were deleted. & control record(s) remain  
72 071 Enter date/time or period/fiscal year  
73 072 Only target cost versions with reference value type Actual supported Space: object requires documentation
74 073 First select a line  
75 074 Select only one line  
76 075 No text found  
77 076 Caution: messages are from & (user &) Space: object requires documentation
78 077 Some materials in plant & are still locked -> see text  
79 078 Program termination: valuation area is not plant level  
80 079 Current controlling area: &. Assigned to the order: &  
81 080 Select at least one order category  
82 081 DO NOT USE Space: object requires documentation
83 082 Parallel processing: Error while processing order (return code &)  
84 083 Order & not found  
85 084 No logs for application & found  
86 085 The logs for application & were deleted  
87 086 Select a worklist  
88 087 Worklist changed on & at & by user &  
89 088 Worklist for transaction & saved  
90 089 Selected lines deleted  
91 090 Job scheduling is now automatic with respect to plant  
92 091 Time: &1&2&3&4 Space: object requires documentation
93 092 Administration records for transaction & deleted from INDX file  
94 093 Cost object hierarchy check is deactivated  
95 094 Worklist for transaction & deleted  
96 095 No target cost versions set for transaction &  
97 096 Cost object & reached Space: object requires documentation
98 097 Test mode & active  
99 098 Cost object & - target cost version & reached Space: object requires documentation
100 099 System error: & & & &  
101 100 ************** Variances: Calculation (101-150) ************************  
102 101 No internal number range exists for & in controlling area &  
103 102 Remaining variance still in &  
104 103 Remaining variances occurred. See long text  
105 104 Inconsistent units of measure (value group &, object &)  
106 105 Base unit for material (&1) not same as order unit (delivery unit) (&2) Space: object requires documentation
107 131 Version & in controlling area & does not allow variance calculation Space: object requires documentation
108 149 Data could not be determined Space: object requires documentation
109 150 ************** Calculation of Target Costs (151-199) ********************  
110 151 Only remaining var. in version & - no target costs for & & Space: object requires documentation
111 152 Order (item) has no material Space: object requires documentation
112 153 Order does not exist  
113 154 No standard cost estimate for material & in plant & on & Space: object requires documentation
114 155 Cost estimate with key & does not exist  
115 156 No delivery for the material  
116 157 Order has no or faulty planned costs or overhead Space: object requires documentation
117 158 Routing/master recipe in actuals differs from qty structure for target Space: object requires documentation
118 159 Reporting point/operation &: WIP cannot be negative  
119 160 Material: &. Conversion from & to base unit of measure not possible (&)  
120 161 WIP or scrap calculation for parallel operation sequences not possible Space: object requires documentation
121 162 Cannot calculate target costs - itemization missing  
122 163 Product cost collector & has no planned costs Space: object requires documentation
123 164 No reporting points found  
124 165 No target costs in target cost version & - missing plan for & & Space: object requires documentation
125 166 Measuring point/operation: &. Inconsistent quantities  
126 167 No target costs due to invalid cost component split  
127 168 No operations found  
128 169 No target costs because no price for material & & in currency & Space: object requires documentation
129 170 Cost est. does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & & Space: object requires documentation
130 171 No cost estimate. Mat./Plant/CostVers/CostVar/Date: & & & & Space: object requires documentation
131 172 No cost estimate exists for sales order & & Space: object requires documentation
132 173 No cost estimate exists for project & Space: object requires documentation
133 174 Reference object & not allowed Space: object requires documentation
134 175 Cannot find routing/master recipe for order Space: object requires documentation
135 176 Cannot calculate target costs Space: object requires documentation
136 177 The target cost version is not intended for variance calculation Space: object requires documentation
137 178 The version is not intended for WIP calculation Space: object requires documentation
138 179 Routing/master recipe for order: & & - material: & & Space: object requires documentation
139 180 No calculation of target costs in version & for fixed-price co-products Space: object requires documentation
140 181 Routing/master recipe order: & - material: & Space: object requires documentation
141 182 Cost estimate does not exist. Material/Plant/Process/Date: & & & & Space: object requires documentation
142 183 Production process &1 does not exist Space: object requires documentation
143 184 Valuation at target costs on basis of preliminary cost estimate Space: object requires documentation
144 185 Valuation at target costs on basis of current standard cost estimate Space: object requires documentation
145 186 Valuation at target costs on basis of alternative material cost estimate Space: object requires documentation
146 187 No price for fixed-price co-product &1 &2 Space: object requires documentation
147 188 Cost object & was not found Space: object requires documentation
148 189 No overhead could be calculated Space: object requires documentation
149 190 Reporting point/routing: &. Overhead not calculated Space: object requires documentation
150 191 Cannot calculate work in process at target costs Space: object requires documentation
151 192 Cannot calculate scrap variances Space: object requires documentation
152 193 Product cost collector does not allow processing in tgt cost vers &1 Space: object requires documentation
153 194 Unit of measure for confirmation cannot be converted Space: object requires documentation
154 200 *********** Target/Scrap/Variance: Orders (201-399) *********************  
155 201 Final delivery was not carried out until period &, fiscal year &  
156 202 Order belongs to cost object hierarchy &  
157 203 Order is locked  
158 204 Order is closed  
159 205 Not technically completed until period & of fiscal year &  
160 206 No suitable settlement rule found for object &  
161 207 Order is marked for deletion  
162 208 Target cost version & invalid  
163 209 Reversal will not generate a control record  
164 210 Reversal will not generate a worklist  
165 211 You have reached the end of the list  
166 212 You have reached the beginning of the list  
167 213 Order is assigned to project &  
168 214 Order has deletion indicator  
169 215 Order has no variance key  
170 216 Order is assigned to sales order &  
171 217 Order has multiple items (joint production)  
172 218 Order is part of a collective order (leading order &)  
173 219 No suitable order (item) found Space: object requires documentation
174 220 Object proc.: Runtime (real time) &, runtime (total of tasks) &  
175 221 Leading order & belongs to cost object hierarchy &  
176 222 Leading order & is assigned to project &  
177 223 Leading order & has deletion indicator  
178 224 Leading order & has no variance key  
179 225 Leading order & assigned to sales order &  
180 226 Leading order & has multiple items (joint production)  
181 227 No collective orders processed Space: object requires documentation
182 228 Leading order & not found  
183 229 Control records saved  
184 230 Could not generate worklist Space: object requires documentation
185 231 & (&) is greater than & (&) Space: object requires documentation
186 232 Transaction cannot be executed Space: object requires documentation
187 233 No orders for joint production processed Space: object requires documentation
188 234 Valuation variant & for WIP and scrap not found Space: object requires documentation
189 235 Specify a valuation variant or set the default flag Space: object requires documentation
190 236 Cannot calculate target costs with this cost estimate Space: object requires documentation
191 237 With costing variant type "S" specify a costing variant and version Space: object requires documentation
192 238 Specify an appropriate costing variant Space: object requires documentation
193 239 Delivery date not set. Notify your system administrator Space: object requires documentation
194 240 Date of technical completion not set. Notify your system administrator Space: object requires documentation
195 241 Scrap calculation not supported in joint production Space: object requires documentation
196 242 WIP calculation at target costs not supported in joint production Space: object requires documentation
197 243 No orders for sales order or project processed Space: object requires documentation
198 244 Only orders for sales order or project are processed Space: object requires documentation
199 245 Only orders for joint production are processed Space: object requires documentation
200 246 Only collective orders are processed Space: object requires documentation
201 247 Leading order & is assigned to product cost collector & Space: object requires documentation
202 248 Order assigned to product cost collector & Space: object requires documentation
203 249 Process orders linked to cost object hierarchy: only test run allowed Space: object requires documentation
204 250 Collective orders selected: & Space: object requires documentation
205 251 Period/fiscal year invalid Space: object requires documentation
206 252 Choose a maximum of 5 target cost versions Space: object requires documentation
207 253 The order has the status "Error in cost calculation" Space: object requires documentation
208 254 The planned quantity is in the future Space: object requires documentation
209 255 No costing variant for planned costs in order Space: object requires documentation
210 400 ************** Variances: Cost Objects (401-599) ************************  
211 401 Cost object & has no variance key  
212 403 System error: Cost element & & does not exist  
213 404 System error when reading cost element & &  
214 405 & hierarchies processed. & hierarchies have variances  
215 406 No line items exist. First start processing  
216 407 & hierarchies were processed. See error log  
217 408 Target cost version & not allowed for & &  
218 409 Target cost version & (planned/planned comparison) not allowed  
219 600 ************** Variances: Cost Center (601-799) *************************  
220 601 Controlling area & does not exist. Please check your entry  
221 602 Target cost version & not defined in controlling area &  
222 603 Enter a cost center  
223 604 Specify a cost center group  
224 605 Cost center group &/& does not exist  
225 606 Target cost version & not defined in controlling area &  
226 607 Technical error & in FB G_OBJECT_GET  
227 608 No valid cost centers were found in the interval  
228 609 Please enter correct interval  
229 610 Technical error & in FB G_COMBINATIONS_BUILD  
230 611 Technical error & in FB G_COMBINATIONS_GET_EXIT  
231 612 Variance variant missing from tgt cost version & in CO area &  
232 613 Simulation of variance calculation for cost center & finished  
233 614 Completed. Data was saved  
234 615 Test run completed  
235 616 Transaction completed. See messages Space: object requires documentation
236 617 Transaction completed in test run. See messages Space: object requires documentation
237 618 No control data for CO area &, fiscal year & (check your entry)  
238 619 There are no entries in the log  
239 620 The sum of the equivalence numbers is zero  
240 621 & Space: object requires documentation
241 622 Technical error: & & &  
242 623 Activity type &: Field overflow on operating rate  
243 624 &: field overflow during summation Space: object requires documentation
244 625 ************** Processing Steps *****************************************  
245 626 Step 1: cost center data read  
246 627 Step 2: actual costs split according to target costs  
247 628 Step 3: costs split according to splitting rules  
248 629 Step 4: variances calculated  
249 630 ************** General Error Messages for List Processing ***************  
250 631 Function not possible for totals lines  
251 632 Position the cursor on a line in the list  
252 633 This is a credit line  
253 634 Selected combination has no variances  
254 635 Function not possible for this line  
255 636 The target cost version you entered does not exist  
256 637 No data could be selected for target cost version &  
257 638 The list does not contain any data  
258 639 Position the cursor on a display field  
259 640 ********** Define List Variant **************  
260 641 Key fields in the list cannot be deleted  
261 642 Position the cursor on the display field or in the field list  
262 643 First select a field with 'Cut'  
263 644 Use 'Cut' to delete or to select fields  
264 645 List does not contain any value fields  
265 646 Maximum list width (& characters) exceeded  
266 647 Display variant & does not exist  
267 648 Display variant saved  
268 649 Display variants supplied by SAP cannot be changed  
269 650 ********** Processing ***********************  
270 651 Test run without detailed list  
271 652 Background processing with only one cost center  
272 653 Background processing in test run  
273 654 Background processing test run without detailed list  
274 655 You cannot process in the background for a cost center  
275 740 *** List Variants ***  
276 741 First choose a list variant Space: object requires documentation
277 742 You did not choose a variant for the list structure  
278 750 ********** Sorting **********  
279 751 You selected more than three sort fields  
280 800 ******** Background Processing/General (800-899) ************************  
281 801 Period & is a special period  
282 802 Application & not allowed for  
283 803 & seconds to go...  
284 804 List output in spool request &  
285 805 List output to printer &  
286 806 Choose at least one entry  
287 807 Choose only one entry  
288 808 Choose no more than & entries  
289 809 & & & &  
290 810 Parameter name & has & places. The maximum allowed is 8 Space: object requires documentation
291 811 The value of parameter & is too long: & bytes but only 45 are allowed Space: object requires documentation
292 812 Field & incorrectly typed ("&"). P = parameter, S = selection option Space: object requires documentation
293 813 Enter a valid server group Space: object requires documentation
294 814 No valid server group found Space: object requires documentation
295 815 Specify a valid factory calendar Space: object requires documentation
296 816 Enter a valid target server Space: object requires documentation
297 817 No valid factory calender found Space: object requires documentation
298 818 No valid event found Space: object requires documentation
299 819 No valid job found Space: object requires documentation
300 820 No valid operation mode found Space: object requires documentation
301 821 Function &1 is not supported here Space: object requires documentation
302 822 The indicator "only execute on workdays" was set automatically Space: object requires documentation
303 823 The indicator "only execute on workdays" is ignored Space: object requires documentation
304 824 Restrictions are ignored. No start date specified Space: object requires documentation
305 850 No authorization to change the costing view  
306 851 No authorization to change the material data in plant &  
307 852 No change documents will be written for changes in material master  
308 853 Variance calculation cannot be reset - there are dependent entries Space: object requires documentation
309 863 DO NOT USE  
310 864 DO NOT USE  
311 865 DO NOT USE  
312 866 DO NOT USE  
313 867 DO NOT USE  
314 868 DO NOT USE  
315 869 DO NOT USE  
316 870 DO NOT USE  
317 871 DO NOT USE  
318 872 DO NOT USE  
319 873 DO NOT USE  
320 874 DO NOT USE  
321 875 DO NOT USE  
322 876 DO NOT USE  
323 877 DO NOT USE  
324 878 The maximum number of tasks was reduced to &  
325 879 Server group & was selected for parallel processing  
326 880 Specify a valid host  
327 881 No target hosts were found  
328 882 Specify a valid variant for report &  
329 883 No variants were found for report &  
330 884 Specify a server group  
331 885 & jobs created for user &  
332 886 The job & could not be released  
333 887 Error when transferring the print parameters  
334 888 If you start immediately, the planned start date is ignored  
335 889 Error when locking the request report  
336 890 Start date is in the past  
337 891 Processing was ended without job scheduling  
338 892 Enter a start date  
339 893 Latest start date is before planned start date  
340 894 Specify a job name  
341 895 Job & for user & is &  
342 896 Cannot generate report &1 Space: object requires documentation
343 897 No report name specified for the SUBMIT. Calling program: &1 Space: object requires documentation
344 898 Error in job scheduling. Function module: &1, return code &2-&3 Space: object requires documentation
345 899 Error reading domain &, value &  
346 900 **** WIP: cost object (901-999) *****************************************  
History
Last changed on/by 19950815  SAP 
SAP Release Created in