SAP ABAP Data Element WKVXXXP (Plan Variable Costs)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element WKVXXXP
Short Description Plan Variable Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan var. 
Medium 15 Plan var. costs 
Long 20 Plan variable costs 
Heading 21 Plan variable costs 
Documentation

Definition

Costs that were planned for an object such as a material, cost center, business process, order (such as a production order, process order, or cost object ID.

Use

In Overhead Cost Controlling, this field shows the planned costs.

In Product Cost Controlling, this field shows the following planned costs, depending on the target cost version:

History
Last changed by/on SAP  19950401 
SAP Release Created in 470