SAP ABAP Data Element WKGXXXI (Total Control Costs for Variance Calculation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element WKGXXXI
Short Description Total Control Costs for Variance Calculation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ctrl Costs 
Medium 16 Control Costs 
Long 20 Control Costs 
Heading 21 Control Costs 
Documentation

Definition

Control costs for variance calculation

When variances are calculated on the input side, the control costs are compared against the target costs.

  • In Overhead Cost Controlling, the control cost equals the actual cost.
  • In Cost Object Controlling, this field shows either the actual cost from which the work in process and scrap was deducted, or the cost calculated in preliminary order costing (which may be period-based). Which cost is shown depends on the target cost version.

    In the first case, the control cost is calculated with the following formula:

    Control cost = Actual cost minus Scrap minus Work in process