SAP ABAP Data Element VRZGT (Actual delay)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element VRZGT
Short Description Actual delay  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type VRZGT    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 9    
Decimal Places 3    
Output Length 11    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Act. delay 
Medium 20 Actual delay 
Long 30 Actual delay 
Heading 11 ActualDelay 
Documentation

Definition

The way in which the actual delay is calculated depends on the receipt element in question.

  • Production order: The actual operation delay is calculated from the difference between the confirmed and planned operation ends of the last finally confirmed operation in the production order. The actual order delay is calculated from the difference between the current date and the scheduled end of the order. In the order progress report, the maximum from the actual operation delay and actual order delay is displayed. This is calculated dynamically.
  • Planned order: The order start date lies in the past.
  • Purchase requisition: The release date lies in the past.
  • Purchase order: The latest confirmed date of a schedule line lies after the requested delivery date of the purchase order (header level).

History
Last changed by/on SAP  19990326 
SAP Release Created in