SAP ABAP Data Element TOLUE (Planning file entry: overdelivery tolerance)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning

⤷

⤷

⤷

Basic Data
Data Element | TOLUE |
Short Description | Planning file entry: overdelivery tolerance |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PROZENT100 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Overdeliv. |
Medium | 15 | Overdelivery |
Long | 20 | Overdeliv. tolerance |
Heading | 10 | Overdeliv. |
Documentation
Definition
If an overdelivery is made for a material in a goods movement, you can use this indicator to determine when the system is to create an entry in the planning file for MRP.
Here, you can enter the tolerated difference (as a percentage) from the original quantity of the procurement element (purchase order, production order, reservation). If this tolerance is exceeded then a planning file entry is created.
In the standard system, the value "zero" is preset, that is, an entry is always made if an overdelivery exists. No entry is made if the exact required quantity is delivered. If, in this case, you also want the system to create an entry in the planning file, you must enter the value "100" that usually has the same effect as "zero".
History
Last changed by/on | SAP | 19960103 |
SAP Release Created in |