SAP ABAP Data Element TOLERNEG (Tolerance for Early Completion (%))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ IPRM (Package) Application Development R/3 Preventive Maintenance
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ IPRM (Package) Application Development R/3 Preventive Maintenance
Basic Data
Data Element | TOLERNEG |
Short Description | Tolerance for Early Completion (%) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM3 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Tol. (-) |
Medium | 15 | Tolerance (-) |
Long | 20 | Tolerance (-) |
Heading | 40 | Tolerance for Early Completion (%) |
Documentation
Definition
The tolerance in the case of early completion determines the time span in which negative variances between actual and planned date do not influence subsequent planning.
The tolerance is defined as a percentage rate of the smallest interval between the maintenance cycles of the maintenance strategy.
The smallest interval is used so that a date shift does not automatically lead to a planned date being skipped.
Use
Dependencies
Example
A maintenance strategy has two maintenance packages:
- Package 1: Every 30 days
Package 2: Every 40 days - Smallest interval: 10 days
- Tolerance: 10 %
If the maintenance package is performed no more than one day before the planned date, this variance will be disregarded for the determination of the next date.
History
Last changed by/on | SAP | 20030130 |
SAP Release Created in |