Data Element | TO_P |
Short Description | Last Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RPMAX | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | BPE | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | To |
Medium | 15 | To period |
Long | 20 | to |
Heading | 3 | to |
Documentation
Definition
Period signifying the end of the analysis or processing timeframe.
Supplementary Documentation - TO_P 0001
Use
The "To period" contains the last period for which assessment, distribution, periodic transfer or indirect activity allocation can be performed.
Dependencies
You can carry out assessment, distribution, periodic transfer or indirect activity allocation for several periods in parallel.
Supplementary Documentation - TO_P 0002
Use
The "To period" is the last period for which activity price calculation is carried out.
Dependencies
You can carry out activity price calculation for several periods. The "From period" field contains the first period, the "To period" the last period of the calculation.
Supplementary Documentation - TO_P 0003
Use
The "To period" is the last period for which activity price calculation is carried out.
Dependencies
You can carry out activity price calculation for several periods. The "From period" field contains the first period, the "To period" the last period of the calculation
Supplementary Documentation - TO_P 0004
Use
The to-period is the final period for which summarization is run.
Dependencies
You can summarize more than one period simultaneously. If you do this, the from-period contains the first period of the summarization, and the to-period contains the final period of the summarization.
Supplementary Documentation - TO_P 0100
Use
The "To period" is the last period for which revaluation is carried out.
Dependencies
The period range you enter must be within the posting periods defined for revaluation with the maintenance transaction.
Supplementary Documentation - TO_P 0461
Use
If you carry out progress determination more than once, the system calculates:
- Plan values for the whole planning period
- Actual values for the period specified
- Correction values in actual through to the previous period
Further notes
The system does not update actual values from previous periods.
If actual values have already been calculated for subsequent periods, the system deletes these values: