SAP ABAP Data Element TO_P (Last Period)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KBAS (Package) Overhead Cost Controlling
Basic Data
Data Element TO_P
Short Description Last Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RPMAX    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID BPE  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 To 
Medium 15 To period 
Long 20 to 
Heading to 
Documentation

Definition

Period signifying the end of the analysis or processing timeframe.

Supplementary Documentation - TO_P 0001

Use

The "To period" contains the last period for which assessment, distribution, periodic transfer or indirect activity allocation can be performed.

Dependencies

You can carry out assessment, distribution, periodic transfer or indirect activity allocation for several periods in parallel.

Supplementary Documentation - TO_P 0002

Use

The "To period" is the last period for which activity price calculation is carried out.

Dependencies

You can carry out activity price calculation for several periods. The "From period" field contains the first period, the "To period" the last period of the calculation.

Supplementary Documentation - TO_P 0003

Use

The "To period" is the last period for which activity price calculation is carried out.

Dependencies

You can carry out activity price calculation for several periods. The "From period" field contains the first period, the "To period" the last period of the calculation

Supplementary Documentation - TO_P 0004

Use

The to-period is the final period for which summarization is run.

Dependencies

You can summarize more than one period simultaneously. If you do this, the from-period contains the first period of the summarization, and the to-period contains the final period of the summarization.

Supplementary Documentation - TO_P 0100

Use

The "To period" is the last period for which revaluation is carried out.

Dependencies

The period range you enter must be within the posting periods defined for revaluation with the maintenance transaction.

Supplementary Documentation - TO_P 0461

Use

If you carry out progress determination more than once, the system calculates:

  • Plan values for the whole planning period
  • Actual values for the period specified
  • Correction values in actual through to the previous period

Further notes

The system does not update actual values from previous periods.

If actual values have already been calculated for subsequent periods, the system deletes these values:

History
Last changed by/on SAP  19970827 
SAP Release Created in