SAP ABAP Data Element SCHEDEX (Indicator: Scheduling external op. with standard values)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CIC (Application Component) Interaction Center WinClient
⤷
CO (Package) R/3 Application development: PP Production orders
⤷
⤷
Basic Data
| Data Element | SCHEDEX |
| Short Description | Indicator: Scheduling external op. with standard values |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR1 | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Sched.ext. |
| Medium | 16 | Sched.ext.op. |
| Long | 20 | Sched.external op. |
| Heading | 0 |
Documentation
Definition
This indicator determines that the following objects can be scheduled using their standard values if they are externally processed. The indicator is valid for the following objects:
- In the areas Quality management (QM), Plant Maintenance (PM), Project Systems (PS), Production Planning (PP):
for operations.
- In the area Production planning - Process industry (PP-PI):
for phases.
If the indicator is not set then these objects are scheduled using their planned delivery time when they are externally processed.
Dependencies
This setting is only taken into account if the object is marked as externally processed in the control key (field external processing).
History
| Last changed by/on | SAP | 19991102 |
| SAP Release Created in |