Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | PRIOR_STAT |
Short Description | Status Number for Status of WIP Calc. and Results Analysis |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KKGNUM2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Status No. |
Medium | 15 | Status Number |
Long | 20 | Status Number |
Heading | 4 | StNo |
Documentation
Definition
Number that determines the sequence in which the valuation method is selected for results analysis or for the calculation of work in process (WIP).
Procedure
Examples
Three statuses are relevant for the calculation of work in process at actual costs:
- PREL (Partially released)
You specify status number "1" for this status.
- REL (Released)
You specify status number "2" for this status.
- DLV (Delivered)
You specify status number "3" for this status.
- TECO (Technically completed)
You specify status number "4" for the this status.
For the valuation methods of status numbers 1 and 2, the system specifies results analysis type F (calculate work in process)
For the valuation methods of status numbers 3 and 4, the system specifies results analysis type Z (cancel data of WIP calculation and results analysis)
To determine the work in process, perform WIP calculation in the period closing process of Product Cost by Order.
If a production order or process order has the status REL, for example, the system calculates work in process. When you settle, you pass the work in process to Financial Accounting and Profit Center Accounting according to the posting rules specified in Customizing.
If a production order or process order has the status DLV, the system cancels the work in process when it calculates the WIP during the period closing process. Settlement then cancels the work in process capitalized in Financial Accounting.
Dependencies
History
Last changed by/on | SAP | 19971020 |
SAP Release Created in |