Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | PLANTEXT |
Short Description | Task list description |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TEXT40 | |
Data Type | CHAR | Character String |
Length | 40 | |
Decimal Places | 0 | |
Output Length | 40 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DESCRIPTION | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Descr. |
Medium | 15 | Short Text |
Long | 20 | Short Text |
Heading | 40 | Task list description |
Documentation
Definition
Describes the routing.
Dependencies
This text is transferred to the first line of the long text for the task list.
Character formats such as bold or italics are not supported in short texts. If you use special character formats in long texts, the system displays the corresponding control characters in the short text.
Supplementary Documentation - PLANTEXT 0001
Use
Procedure
Examples
Dependencies
If you create equipment task lists or standard task lists for functional locations without entering short text, the system transfers the short text for the equipment or the functional location as short text in PM scheduling.
Supplementary Documentation - PLANTEXT 3000
Use
This text is transferred to the first line of the routing long text.
For maintenance plans with the maintenance call object notification, you do not, as a rule, have to assign a task list to a maintenance item.
You should only specify a task list if you later want to combine the generated notifications in an order using the list editing function for notifications ("Worklist for planned maintenance").
If you generate an order using the worklist, the system copies the operations of the task list to the order.
Dependencies
Example
History
Last changed by/on | SAP | 19991209 |
SAP Release Created in |