SAP ABAP Data Element PLALL (Also plan all unchanged components)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | PLALL |
Short Description | Also plan all unchanged components |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLAN_UNCHANGED_COMP | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | All comps |
Medium | 15 | Plan all comps |
Long | 40 | Also plan unchanged components |
Heading | 0 |
Documentation
Definition
If you set this indicator, all of the components contained in the bill of material are planned even if these components have not been changed in any way relevant to the planning run.
If you do not set this indicator, the system will only plan the components that have undergone a change that is relevant to the planning run.
Supplementary Documentation - PLALL 0001
Use
Procedure
Examples
Dependencies
This indicator is not relevant for materials that are planned using consumption-based planning procedures. These materials are never included in the single-item, multi-level planning run.
Supplementary Documentation - PLALL 0002
Use
Procedure
Examples
Dependencies
In make-to-order production, the system only plans the components that are made to order.
To make this possible these components must be given the indicator for individual requirements in the material master record.
History
Last changed by/on | SAP | 20040210 |
SAP Release Created in |