SAP ABAP Data Element PKBMG (Quantity requested)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD05 (Package) Development class KANBAN
Basic Data
Data Element PKBMG
Short Description Quantity requested  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name REQUESTED_QTY   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Qty reqst 
Medium 15 Qty requested 
Long 20 Quantity requested 
Heading 17 Qty requested 
Documentation

Definition

In this field, you enter the total quantity of material to be procured.

In the control cycle, you can define settings for the quantity per kanban (see below). If no settings have been defined, the system will create exactly one kanban for the quantity required.

Dependencies

You can influence the requested quantity in the control cycle as follows:

  • If you have defined a proposal value for the kanban quantity in the control cycle, the system uses this value if no requested quantity is entered.
  • If you have defined a rounding quantity, the system rounds the requested quantity up to the next multiple of the rounding quantity.
  • If a fixed kanban quantity has been defined in the control cycle, then the system will only create complete multiples of the fixed kanban quantity. If the required quantity is smaller than the fixed kanban quantity, the fixed quantity is replenished. If the required quantity is greater than the fixed quantity, several kanbans (for the fixed quantity) are replenished until the required quantity is covered. Here, if necessary, the required quantity is rounded up to a complete multiple of the fixed quantity.

History
Last changed by/on SAP  20041209 
SAP Release Created in