SAP ABAP Data Element NTERM (Only calculate capacity requirements)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element NTERM
Short Description Only calculate capacity requirements  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KREUZ    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Only cap. 
Medium 15 Only cap.rqmts. 
Long 21 Only capacity rqmts. 
Heading CapRqmt 
Documentation

Definition

Specifies that the system only calculates capacity requirements.

Use

  • In production orders, the system calculates the scheduled start and finish of the order by deducting the float before and after production from the basic order dates (order start and order finish). The calculated dates are written into all operations in the order.
  • In networks, the system writes the basic dates from the network header into all activities in the network.

If you use this scheduling type, the dates of all the operations/ activities are identical.

The capacity requirements are distributed across the period between the scheduled start and the scheduled finish.

Costing calculates no capacity requirements when this scheduling type is used.