SAP ABAP Data Element MRPUSERKEY (Control key for user exit material selection - planning run)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷
⤷
⤷
Basic Data
| Data Element | MRPUSERKEY |
| Short Description | Control key for user exit material selection - planning run |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | MRPUSERKEY | |
| Data Type | CHAR | Character String |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table | T450U |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | User exit |
| Medium | 19 | User exit key |
| Long | 20 | User exit key |
| Heading | 19 | User exit key |
Documentation
Definition
If you want to control the selection of mateirals for the planning run using the prefefined SAP 'user exit', enter the key for the user exit in this field.
With this user exit, the total planning run of MRP, MPS or long-term planning can be limited to materials that fulfill certain predefined criteria (of your choice).
For example, you can define the following for each planning run:
- only MRP materials are to be planned, or
- only materials of a particular MRP controller are to be planned, or
- only materials that are procured externally or that are produced in-house are to be planned
Dependencies
The user exit keys are defined in Customizing.
For more information on the user exit, please refer to the enhancement documentation, "M61X0001".
History
| Last changed by/on | SAP | 19960722 |
| SAP Release Created in |