Data Element MLSLO
Short Description Quantity Calculation for Milestone/Progress Confirmation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name MILESTONE_LOGIK   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MilestQty 
Medium 15 Milestone qty 
Long 20 Milestone quantity 
Heading  
Documentation

Definition

Specifies that for milestone or progress confirmations, the quantities (yield, scrap) of automatically generated confirmations are calculated without taking into account the scrap percentage rate of each operation.

If you do not set this indicator, then the planned scrap percentage rate of each operation is taken into account when calculating the confirmed total quantity. In the generated confirmations, the proportional scrap is added to the yield.

If you set this indicator, then the automatic confirmations are posted with the same total quantities as the the milestone or progress confirmation. Scrap is posted as yield in the automatically generated confirmations.

Example

24 pieces of scrap are planned for an order of 124 pieces. The planned operation quantities are:

Operation 10 124 pieces, 10% scrap (13 pieces)

Operation 20 111 pieces, 5% scrap (6 pieces)

Operation 30 105 pieces, 4% scrap (5 pieces)

You enter a milestone confirmation for operation 30 with 48 pieces for the yield and 2 pieces of scrap. The quantities in the automatically generated confirmations are then calculated as follows:

  • Indicator is not set

    Operation 10 59 pieces, 0 pieces scrap - automatic confirmation

    Operation 20 53 pieces, 0 pieces scrap - automatic confirmation

    Operation 30 48 pieces, 2 pieces scrap

  • Indicator is set

    Operation 10 50 pieces, 0 scrap - automatic confirmation

    Operation 20 50 pieces, 0 scrap - automatic confirmation

    Operation 30 48 pieces, 2 pieces scrap

History
Last changed by/on SAP  20130529 