Hierarchy
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | MLSLO |
Short Description | Quantity Calculation for Milestone/Progress Confirmation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | MILESTONE_LOGIK | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MilestQty |
Medium | 15 | Milestone qty |
Long | 20 | Milestone quantity |
Heading | 0 |
Documentation
Definition
Specifies that for milestone or progress confirmations, the quantities (yield, scrap) of automatically generated confirmations are calculated without taking into account the scrap percentage rate of each operation.
If you do not set this indicator, then the planned scrap percentage rate of each operation is taken into account when calculating the confirmed total quantity. In the generated confirmations, the proportional scrap is added to the yield.
If you set this indicator, then the automatic confirmations are posted with the same total quantities as the the milestone or progress confirmation. Scrap is posted as yield in the automatically generated confirmations.
Example
24 pieces of scrap are planned for an order of 124 pieces. The planned operation quantities are:
Operation 10 124 pieces, 10% scrap (13 pieces)
Operation 20 111 pieces, 5% scrap (6 pieces)
Operation 30 105 pieces, 4% scrap (5 pieces)
You enter a milestone confirmation for operation 30 with 48 pieces for the yield and 2 pieces of scrap. The quantities in the automatically generated confirmations are then calculated as follows:
- Indicator is not set
Operation 10 59 pieces, 0 pieces scrap - automatic confirmation
Operation 20 53 pieces, 0 pieces scrap - automatic confirmation
Operation 30 48 pieces, 2 pieces scrap
- Indicator is set
Operation 10 50 pieces, 0 scrap - automatic confirmation
Operation 20 50 pieces, 0 scrap - automatic confirmation
Operation 30 48 pieces, 2 pieces scrap
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 46C |