SAP ABAP Data Element MEGXXXP (Total Planned Quantity)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KV (Package) Variance analysis RK-S/RK-K
Basic Data
Data Element MEGXXXP
Short Description Total Planned Quantity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENGV8    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 15    
Decimal Places 3    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan qty 
Medium 15 Plan quantity 
Long 20 Plan quantity 
Heading 20 Plan quantity 
Documentation

Definition

Quantities planned for a cost center, business process, order, or cost object ID.

  • In Overhead Cost Controlling, the planned quantity is the quantity that was planned. If costs were planned without specifiying a quantity, the planned quantity is blank.
  • In Cost Object Controlling, this field shows the quantities from the standard cost estimate, the alternative material cost estimate, or the preliminary cost estimate for the order, depending on the target cost version.

An incomplete quantity is indicated as such by the system.

History
Last changed by/on SAP  19950401 
SAP Release Created in