SAP ABAP Data Element MD_RWLIMIT1 (Upper-limit for range of coverage in case of shortage)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | MD_RWLIMIT1 |
Short Description | Upper-limit for range of coverage in case of shortage |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DECV4 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Uppr limit |
Medium | 18 | Upper-lmt rnge.cov |
Long | 21 | Upper-lmt rnge of cov |
Heading | 21 | Upper-lmt rnge of cov |
Documentation
Definition
Defines up to which range of coverage materials are to be displayed. The range of coverage is given in number of workdays.
Supplementary Documentation - MD_RWLIMIT10001
Use
If the range of coverage for a material is longer than the value entered here, the system no longer displays the material. The list is thus limited to the materials, for which replenishment is not critical.
The system compares the value with the value that is entered in the MRP list. If necessary, it adds the number or workdays between today's date and the MRP date to the value entered.
Dependencies
The upper limit for the range of coverage always refers to the range of coverage type. If you have not entered a range of coverage type, it always refers to the first receipt days' supply.
Example
History
Last changed by/on | SAP | 20000211 |
SAP Release Created in |