SAP ABAP Data Element MD_CO_LFP (Ind: transfer of the activity reqmts from long-term planning)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element MD_CO_LFP
Short Description Ind: transfer of the activity reqmts from long-term planning  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 LT plng 
Medium 15 Long-term plng 
Long 20 Long-term planning 
Heading
Documentation

Definition

For the calculation of the activity requirements of the individual cost centers, the planned orders for in-house production that are created either in long-term planning or MRP are scheduled and evaluated via the routings.

History
Last changed by/on SAP  19950504 
SAP Release Created in