SAP ABAP Data Element MAX_PL_IST (Method Using Greater of Planned Costs and Actual Costs)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CIC (Application Component) Interaction Center WinClient
⤷
KKAG (Package) Period costing individual case

⤷

⤷

Basic Data
Data Element | MAX_PL_IST |
Short Description | Method Using Greater of Planned Costs and Actual Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MAX_PL_IST | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Grtr(P/A) |
Medium | 15 | Greater of P/A |
Long | 20 | Greater of plan/act. |
Heading | 0 |
Documentation
Definition
Defines how results analysis reacts if the actual costs are greater than or less than the planned costs.
Use
The following methods are available:
- The actual costs replace the planned costs as the basis for results analysis.
In this case, you choose whether to consider the whole project or order, or the individual line IDs of the project or order.
- The difference between the actual costs and the planned costs is written under a separate line ID.
In this case, you have to enter a line ID in the "Line ID" field. You must also make sure that all planned costs are assigned to a line ID.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |