SAP ABAP Data Element MAX_PL_IST (Method Using Greater of Planned Costs and Actual Costs)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     KKAG (Package) Period costing individual case
Basic Data
Data Element MAX_PL_IST
Short Description Method Using Greater of Planned Costs and Actual Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MAX_PL_IST    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Grtr(P/A) 
Medium 15 Greater of P/A 
Long 20 Greater of plan/act. 
Heading  
Documentation

Definition

Defines how results analysis reacts if the actual costs are greater than or less than the planned costs.

Use

The following methods are available:

  • The actual costs replace the planned costs as the basis for results analysis.

    In this case, you choose whether to consider the whole project or order, or the individual line IDs of the project or order.

  • The difference between the actual costs and the planned costs is written under a separate line ID.

    In this case, you have to enter a line ID in the "Line ID" field. You must also make sure that all planned costs are assigned to a line ID.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19950401 
SAP Release Created in