SAP ABAP Data Element LWRK_PRIO_BI (Supplying Plant Priority (BI))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WFIL (Package) IS-R: Store master
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WFIL (Package) IS-R: Store master
Basic Data
Data Element | LWRK_PRIO_BI |
Short Description | Supplying Plant Priority (BI) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LWRK_PRIO_BI | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Priority |
Medium | 20 | Suppl. plant prio. |
Long | 20 | Suppl. plant prio. |
Heading | 20 | Suppl. plant prio. |
Documentation
Definition
If a plant has more than one supplying plant vaild at the plant or material group level at the same time, you must set a priority for source determination.
If more than one supplying plant is determined at one time for a plant or a plant/material group during source determination, checks are carried out in the priority sequence, whereby the highest priority is 00. This means that the supplying plant with priority 00 is checked first as the source of supply.
If availabe, the listing condition for a material is checked as standard. Use a corresponding user exit for further checks (for example, availability).
History
Last changed by/on | SAP | 19991209 |
SAP Release Created in | 46C |