SAP ABAP Data Element LWRK_PRIO (Supplying plant priority)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
WFIL (Package) IS-R: Store master

⤷

⤷

⤷

Basic Data
Data Element | LWRK_PRIO |
Short Description | Supplying plant priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | LWRK_PRIO | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Priority |
Medium | 20 | Suppl. plant prio. |
Long | 20 | Suppl. plant prio. |
Heading | 20 | Suppl. plant prio. |
Documentation
Definition
If a number of supplying plants are to be valid for a plant or plant group at the same time/during the same period, you must enter a priority for supply source determination.
If supply source determination finds several supplying plants that are valid for a plant or plant group at the same time/during the same period, the system checks the sequence of priority; the supplying plant with value 00 has the highest priority. This means that the system first checks the supplying plant with priority 00 to determine whether it can be used as the supply source.
In the standard system, there is a check on whether listing conditions exist for a material. A user exit can be used for further checks (e.g. availability).
History
Last changed by/on | SAP | 19980325 |
SAP Release Created in |