SAP ABAP Data Element LTPLS (Long-term planning lot size procedure (gross))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷
⤷
⤷
Basic Data
| Data Element | LTPLS |
| Short Description | Long-term planning lot size procedure (gross) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DISLS | |
| Data Type | CHAR | Character String |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table | T439A |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Lot size |
| Medium | 15 | LTP - lot size |
| Long | 25 | Lot size procedure LTP |
| Heading | 0 |
Documentation
Definition
With a gross requirements planning scenario, the long-term planning is always to calculate all BOM levels with lot-for-lot order quantity or with period lot size during the lot size calculation, even if you have set other lot-sizing procedures in the material master.
Dependencies
The selected lot size is only effective if you have set the Use gross lot size indicator.
History
| Last changed by/on | SAP | 19980414 |
| SAP Release Created in |