SAP ABAP Data Element LLSKZ (Long-term planning: Use gross lot size)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element LLSKZ
Short Description Long-term planning: Use gross lot size  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Gross LTP 
Medium 20 With gross lot size 
Long 34 Use gross lot size 
Heading  
Documentation

Definition

The selection means that the lot size defined in the planning scenario is used for the lot size calculation in long-term planning for all materials, irrespective of the material-specific settings.

You can define a lot-for-lot order quantity or a period lot size.

Use

The definition of a lot size for all materials is particularly useful for gross requirements planning, if you would only like to plan the pure requirements quantities due to cost evaluation and budgeting purposes.

History
Last changed by/on SAP  19980414 
SAP Release Created in