SAP ABAP Data Element LGTER (Scheduling the long-term period lot-sizing procedure)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | LGTER |
Short Description | Scheduling the long-term period lot-sizing procedure |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TERBV | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Scheduling |
Medium | 15 | Scheduling |
Long | 20 | Scheduling |
Heading | 0 |
Documentation
Definition
This indicator determines when in the period, the delivery date, that is, the order finish date, is to be created for the lot.
The following procedures exist:
- delivery date at the time of the requirement
- delivery date at the beginning of the period
- delivery date are the end of the preiod
- the start date of the planned order is set to the period start and the delivery date is set to the end of the period
Therefore, the system does not carry out scheduling using the in-house production time or the planned delivery time, but the planned order is always scheduled within the period of the period lot size.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in |