SAP ABAP Data Element KWBZD (Replenishment Lead Time in Workdays)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
Basic Data
Data Element | KWBZD |
Short Description | Replenishment Lead Time in Workdays |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | RLT [Days] |
Medium | 13 | RLT [Days] |
Long | 19 | Replen. Lead [Days] |
Heading | 10 | RLT [Days] |
Documentation
Definition
Indicates the replenishment lead time in days.
Use
Dependencies
- The replenishment lead time in days is used for the kanban calculation if the replenishment lead time in hours/minutes has not been maintained or no working times have been maintained in the associated calculation profile. The replenishment lead time in hours/minutes takes priority over the replenishment lead time in days, i.e. the system uses the replenishment lead time in hours/minutes as soon as you specify this value, irrespective of what you have specified for the replenishment lead time in days.
- In the case of control cycles for in-house production or external procurement, this time only has to be maintained if it differs from the in-house production time or planned delivery time maintained in the material master record. The goods receipt processing time is not taken into account.
- In control cycles for stock transfers, as a basic rule, you must always specify a replenishment lead time.
Example
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in |