SAP ABAP Data Element KWBZD (Replenishment Lead Time in Workdays)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD05 (Package) Development class KANBAN
⤷
⤷
⤷
Basic Data
| Data Element | KWBZD |
| Short Description | Replenishment Lead Time in Workdays |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DEC3 | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | RLT [Days] |
| Medium | 13 | RLT [Days] |
| Long | 19 | Replen. Lead [Days] |
| Heading | 10 | RLT [Days] |
Documentation
Definition
Indicates the replenishment lead time in days.
Use
Dependencies
- The replenishment lead time in days is used for the kanban calculation if the replenishment lead time in hours/minutes has not been maintained or no working times have been maintained in the associated calculation profile. The replenishment lead time in hours/minutes takes priority over the replenishment lead time in days, i.e. the system uses the replenishment lead time in hours/minutes as soon as you specify this value, irrespective of what you have specified for the replenishment lead time in days.
- In the case of control cycles for in-house production or external procurement, this time only has to be maintained if it differs from the in-house production time or planned delivery time maintained in the material master record. The goods receipt processing time is not taken into account.
- In control cycles for stock transfers, as a basic rule, you must always specify a replenishment lead time.
Example
History
| Last changed by/on | SAP | 20110901 |
| SAP Release Created in |