Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | KFPAZ |
Short Description | Number of periods for long-term lot size |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC03 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | No.periods |
Medium | 15 | No.of periods |
Long | 20 | Number of periods |
Heading | 0 |
Documentation
Definition
Determines the number of periods from when the long-term planning is valid.
The system calculates the "valid from date" for the long-term lot size by calculating the number of periods entered here into the future. In so doing, the system always rounds up to the beginning of the next complete period.
Examples
The planning run takes place on a Wednesday and three weeks have been entered as the period length for calculating the valid from date for the long-term lot size:
then the system calculates three weeks into the future and starting from the beginning of the next complete week (that is the Monday) the lot-size calculation is carried out using the long-term lot size.
The planning run is carried out in the second third of the month and three months have been entered as the period length:
then the system calculates three months into the future and rounds up to the end of the third month. From the first workday of the following month, the system uses the long-term lot size in planning.
Dependencies
The period type is determined in the field Period ind. LT plng.
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |