Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
Basic Data
Data Element | KCPRF |
Short Description | Kanban Calculation Profile |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KCPRF | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | TPKBP |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | CalProfile |
Medium | 15 | Calc. Profile |
Long | 20 | Calculation Profile |
Heading | 4 | Calc |
Documentation
Definition
In the calculation profile, you can store the data for the automatic calculation of the kanban circulation:
- Calculation type
The calculation type controls whether the number of kanbans or the quantity per kanban is calculated.
- Safety factor
The safety factor is used to offset requirement fluctuations proportionately. It is multiplied by the result of the formula for the kanban calculation.
- Constant
Depending on how Kanban is used in production, you set the constant as follows:
- If a kanban is set to empty when the material in a kanban is completely used up, the constant is set to 1.
- In this case, if several work centers use material from a production supply area, you must increase the constant by the number of work centers.
- If, however, the kanban is set to empty as soon as the first part is taken out, the constant is 0.
You can also use the constants to plan a safety stock.
- Smoothing type
You use the smoothing type to specify whether dependent requirements in the period of examination are:
- Not smoothed
- Smoothed within the period of a week
- Smoothed according to a predefined distribution function
- Factory calendar, Grouping, Shift program
These parameters are necessary if you have maintained a sub-day replenishment lead time in the control cycle. From the shift sequence, the system calculates the average daily worktime for the conversion of the exact-to-the-day dependent requirement quantity to the quantity per replenishment lead time.
Supplementary Documentation - KCPRF 0001
Use
Procedure
Examples
Dependencies
You define the calculation profile in Customizing for KANBAN and assign it to the control cycle.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in |