SAP ABAP Data Element JV_THRESHA (Threshold Amount - Stepped Rate Overhead (JVA))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       GJVA (Package) Joint venture accounting
Basic Data
Data Element JV_THRESHA
Short Description Threshold Amount - Stepped Rate Overhead (JVA)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV9    
Data Type CURR   Currency field, stored as DEC 
Length 17    
Decimal Places 2    
Output Length 23    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Th.Amount 
Medium 15 Thresh. Amount 
Long 20 Threshold Amount 
Heading Th.Amt. 
Documentation

Definition

Costs posted to the cost objects to which the threshold rule applies, are accumulated and compared to the threshold amount(s) for the rule.

For stepped rate rules, the initial threshold functions differently from subsequent thresholds. When actual expenses exceed the first threshold set for a rule, the rate set for that first threshold is applied to the entire amount of the actual expenses. Example:

Objective:
Apply 10% overhead to entire amount when expenses exceed $25,000

No Threshold Rate

1 25000 10

Actual Expenses: $26,000

Cost Calculation Overhead: 10% of $26,000 = $2,600

For subsequent thresholds, the rate defined for each threshold applies to the amount that exceeds the current threshold but falls short of the next threshold, if there is one.

To apply a rate only to the amount of expenses that exceed a single threshold, you must set two thresholds, the first with a 0% rate and the second for the threshold that should trigger the rate to be applied to amounts that exceed the threshold: Example:

Objective:

Apply 10% overhead to amount of expenses over $25,000

No Threshold Rate

1 24999 0
2 25000 10

Actual Expenses: $26,000

Cost Calculation Overhead: 10% of ($26,000-$25,000) = $100

History
Last changed by/on SAP  20020108 
SAP Release Created in