SAP ABAP Data Element JV_CB_RC_M (JV cutback recovery mode)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ GJVA (Package) Joint venture accounting
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ GJVA (Package) Joint venture accounting
Basic Data
Data Element | JV_CB_RC_M |
Short Description | JV cutback recovery mode |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | JV_P_FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | rec. mode |
Medium | 20 | cutb. recovery mode |
Long | 20 | cutback rec. mode |
Heading | 1 | R |
Documentation
Definition
This flag effects the run of the program only if the company code is configured to run cutback on an inception-to-date basis (see configuration -> environment -> company codes).
If cutback was run in update mode on an inception-to-date basis it has updated the joint venture ledger with the amounts which were cut back. It is possible to reverse the updating by running cutback again in recovery mode.
The recovery mode can reverse only the last run of cutback, it can not reverse prior processing,
History
Last changed by/on | SAP | 20020108 |
SAP Release Created in |