SAP ABAP Data Element IST_VERSN (Plan Version for Simulation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKAG (Package) Period costing individual case
Basic Data
Data Element | IST_VERSN |
Short Description | Plan Version for Simulation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | COVERSI | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table | TKVS |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Vsn Simul. |
Medium | 15 | Version f. Sim. |
Long | 20 | Plan Vsn for Simul. |
Heading | 5 | VnSim |
Documentation
Definition
Determines which plan version is used as a basis for simulation in results analysis.
Use
Procedure
Examples
Dependencies
For simulation purposes you define a separate results analysis version.
In the results analysis version, you specify that this valuation is a simulation with the indicator Simulate actual with plan.
If you are planning for internal orders and projects, you can store different planning data for the same object under different plan versions.
If you are performing a simulation for a sales order item, you must use plan version 0.
History
Last changed by/on | SAP | 19950822 |
SAP Release Created in |