Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KBAS (Package) Overhead Cost Controlling
Basic Data
Data Element | FROM_P |
Short Description | First period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RPMAX | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | VPE | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Period |
Medium | 15 | Period |
Long | 20 | Period |
Heading | 4 | From |
Documentation
Definition
Period signifying the start of the analysis or processing timeframe.
Supplementary Documentation - FROM_P 0001
Use
The "From period" field contains the first period, for which the assessment, distribution, periodic transfer or indirect activity allocation can be executed.
Dependencies
Assessment, distribution, periodic transfer or indirect activity allocation can be executed for several periods in parallel.
Supplementary Documentation - FROM_P 0002
Use
"From period" is the first period for which activity price calculation is carried out.
Dependencies
You can run activity price calculation for several periods in parallel. The "From period" field contains the first period, and "To period" contains the last period.
Supplementary Documentation - FROM_P 0003
Use
"From period" is the first period for which activity price calculation is carried out.
Dependencies
You can run activity price calculation for several periods in parallel. The "From period" contains the first period, "to period" contains the last period.
Supplementary Documentation - FROM_P 0004
Use
The from-period is the first period for which summarization is run.
Dependencies
You can summarize more than one period simultaneously. If you do this, the from-period contains the first period of the summarization, and the to-period contains the final period of the summarization.
Supplementary Documentation - FROM_P 0005
Use
The field contains the period in which the result of the Segment reversal is posted. This period is also used for Segment rebook.
Examples
Cycle Z1 was executed in periods 1-3. In period 5 a correction for segment S1 from this cycle should take place. Enter period 1 as the first period to be corrected, and period 3 as the last period to be corrected. Enter period 5 as the posting period.
Supplementary Documentation - FROM_P 0100
Use
"From period" is the first period for which revaluation is run.
Dependencies
The period range you enter should be within the posting periods defined for revaluation with the maintenance transaction.
Supplementary Documentation - FROM_P 0451
Use
Period for the validity check of the automatically generated settlement rule.
Supplementary Documentation - FROM_P 1000
Use
If you can enter only one period on the screen, enter the period as of which the R/3 System can begin processing.
History
Last changed by/on | SAP | 19971104 |
SAP Release Created in |