SAP ABAP Data Element FPAFL (Long-term planning: Include firm planned orders yes/no)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD03 (Package) Appl. development R/3 MPS/determin. requirements planning
Basic Data
Data Element | FPAFL |
Short Description | Long-term planning: Include firm planned orders yes/no |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd ords |
Medium | 15 | Firm plnd ordrs |
Long | 27 | Include firm planned orders |
Heading | 27 | Include firm planned orders |
Documentation
Definition
If this field has been selected, the system takes firm planned orders into account in long-term planning. This means, the system copies them from operative planning and treats them as receipt elements. To obtain as realistic a planning situation as possible in long-term planning, you should also select the Include fixed rcpts field so that fixed receipts are also copied.
Dependencies
When copying firm planned orders, the system only copies the headers This means that BOM items which were manually changed in the planned order are lost in the copying process. Firm planned orders are only included in the planning run of long-term planning if the control parameter in the initial screen of the planning run allows this.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |