Basic Data
Data Element | DTEND_ER |
Short Description | End Date of Selection Horizon |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | End date |
Medium | 15 | End date |
Long | 20 | End date |
Heading | 10 | End date |
Documentation
Definition
Date, up to which the system is to import the MRP elements into the stock/requirements list.
Note
In the following cases there can be discrepancies between the start date or end date of a defined horizon and the receipt/requirements date in the respective analysis list:
- For stock transfer purchase requisitions, the horizon is not based on the requirements date, but on the delivery date (= requirements date + planned delivery date).
- If a goods receipt processing time has been entered for a material, the horizon is not based on the availability date, but on the goods receipt date (= availability date - goods receipt processing time).
Calculating the available quantity
When you have a selection horizon, if you restrict the display using the start date, the calculation of the available quantity also only starts with this start date. Requirements and receipts from before the start date are not taken into account. The display of the available quantity does not then correspond to the actual material availability.
The restriction using the start date is, for example, useful if you want to improve system performance or if simulative stock development from a particular point in time is of interest to you.
Supplementary Documentation - DTEND_ER 0001
Use
Dependencies
If you enter an end date and a timeframe in calendar days, the system calculates the start date automatically.
If you only enter an end date, the system imports the MRP elements starting from today's date and going up to this end date into the list.
Example