SAP ABAP Data Element CO_SCHED_ORIG (Origin of scheduling dates)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element | CO_SCHED_ORIG |
Short Description | Origin of scheduling dates |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CO_SCHED_ORIG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Origin |
Medium | 15 | Origin of dates |
Long | 20 | Origin of dates |
Heading | 8 | Origin |
Documentation
Definition
Determines the origin of the start or finish dates for forward and backward scheduling.
Use
The values have the following significance:
- Set date
The date is explicitly predefined. - Shift date
The date is shifted by the predefined time period. The value can be positive or negative. - Take date from sales order
The date is taken from the sales order. This selection is only offered for the finish date. - Determine date by scheduling
The date is determined by scheduling. With forward scheduling this selection is only offered for the finish date. With backward scheduling this selection is only offered for the start date. - Set date to date for total commitment
The date for total commitment is taken from the availability check. selection is only offered for the end date.
History
Last changed by/on | SAP | 19980428 |
SAP Release Created in |