SAP ABAP Data Element CO_SCHED_ORIG (Origin of scheduling dates)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element CO_SCHED_ORIG
Short Description Origin of scheduling dates  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CO_SCHED_ORIG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Origin 
Medium 15 Origin of dates 
Long 20 Origin of dates 
Heading Origin 
Documentation

Definition

Determines the origin of the start or finish dates for forward and backward scheduling.

Use

The values have the following significance:

  1. Set date
    The date is explicitly predefined.
  2. Shift date
    The date is shifted by the predefined time period. The value can be positive or negative.
  3. Take date from sales order
    The date is taken from the sales order. This selection is only offered for the finish date.
  4. Determine date by scheduling
    The date is determined by scheduling. With forward scheduling this selection is only offered for the finish date. With backward scheduling this selection is only offered for the start date.
  5. Set date to date for total commitment
    The date for total commitment is taken from the availability check. selection is only offered for the end date.

History
Last changed by/on SAP  19980428 
SAP Release Created in