SAP ABAP Data Element CO_MAX_WAIT (Maximum synchronization queue time)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-CIC (Application Component) Interaction Center WinClient
     CO (Package) R/3 Application development: PP Production orders
Basic Data
Data Element CO_MAX_WAIT
Short Description Maximum synchronization queue time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC8    
Data Type NUMC   Character string with only digits 
Length 8    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MaxSynch 
Medium 15 MaxSyncTime 
Long 20 Max.synchronization 
Heading MaxSynch 
Documentation

Definition

Determines the maximum queue time seconds before terminating the attempt to synchronize the parallel processes with the main program.

During the synchronization of parallel processes the queue times can become quite long. The synchronization can fail because of an error in the process communication.

Use

Procedure

The queue time must be made sufficiently long so that the desired functions can be carried out in the time period.

Examples

Dependencies

History
Last changed by/on SAP  19980505 
SAP Release Created in